Activities highlights
• Completed 15,947 metres of infill and exploration diamond
drilling during the quarter ended February 28, 2019
• Four drill rigs are currently active on the Gladiator, Barry and
Moroy projects
• Retained the services of SGS Geostat to complete a NI 43-101
resource estimate and technical report on three deposits
• Nearing completion on an environmental impact assessment for
the Urban-Barry mill expansion from 800 to 2,400 tonnes per day
• Engaged two engineering firms, one commissioned to design the
mill expansion, and one to increase the capacity of the tailings
storage facility to 10 million tonnes
Q3 Exploration Summary
During the quarter ended February 28, 2019, Bonterra completed an
aggregate of 15,947 metres of infill and exploration diamond drilling on
Gladiator, Barry and Moroy.
At Gladiator, 9,226 metres of diamond drilling were completed. The
drilling has extended the Gladiator Gold deposit along strike by 200 m
on the Rivage zone and by 250 m on the Barbeau zone. Rivage and
Barbeau remain open at depth and along strike. Diamond drilling has
also confirmed the northeasterly-trending ore chute on the Main and
North Zones that remain open at depth.
At Barry, 2,902 metres of diamond drilling were completed
underground from Level 100. This drilling was successful in confirming
the multiple gold zones utilizing 20- to 30-metre drill spacings, mainly
on Level 100. Most of the drill holes intersected gold mineralization
where it was anticipated validating the geological model at this level
prior to the upcoming resource estimate. All zones at Barry remain
open at depth and along strike.
At Moroy, 3,819 metres of underground definition diamond drilling
were completed, confirming the continuity of M1 and M2 zones with
shorter drill spacing. Higher grades and thicker mineralized drill-core
intersections are promising.
Q4 Exploration Forecast
The Company has retained the services of SGS Geostat of Blainville,
Québec, to complete a mineral estimate and a NI 43-101 compliant
technical report on the three projects. SGS has been provided with the
Company's drilling results up to March 31, 2019. SGS is actively
working on the review of previous work, validation of the drill hole
database and QA/QC data, and the creation of appropriate block
models for all three projects. The Company has been informed that
the target date for the completion of the resource estimate is around
the end of May 2019.
Bonterra is currently conducting a drilling program with a combined
total of 15,000 metres planned on the Gladiator, Barry and Moroy
deposits. This next phase aims to test geological targets outside of the
known mineralized zones.
One surface rig is currently active on the Titan Zone. The Company
recently observed visible gold from Titan drill core. Titan is interpreted
as the northeastern extension of the Gladiator Zone, where three new
sub-vertical gold-bearing zones have been identified and remain open
in all directions.
One surface rig is active at Barry targeting mineralization along strike
and at depth. Three holes have been completed to date, intercepting
zones with visible gold and semi-massive sulfide mineralization.
Two rigs are currently active on the Moroy Deposit, one at surface
testing the up-plunge potential from surface to a depth of 400 metres,
and the second testing, from an underground drilling platform, the
down-plunge extension below a depth of 600 metres. To date, several
typical hematized and mineralized drill intercepts have been observed.
Permitting and Engineering
The Company is finalizing the environmental impact assessment for
the Urban-Barry mill expansion to increase the throughput capacity
from 800 to 2,400 tonnes per day (tpd). The plan is to create a
regional Urban-Barry mill to process the ores from other potential
satellite deposits. The Barry and Moroy projects would likely be the
first two projects to fit this business model.
The Company is currently proceeding with the engineering design of
the 2,400 tpd expansion as the permitting process continues. Two
engineering firms are working on this project: one firm is focusing on
the tailings dam design to contain 10 million tonnes of material over 12
years and the other firm is designing the mill modification to process
2,400 tpd while maintaining gold recovery levels above 95%. This
latter firm is also designing a new gravity circuit to accept the feed
from the Barry project.
Care and maintenance of the underground facilities, and mine
design
The Company has placed its underground operations on care and
maintenance. The Company is currently designing the underground
workings with the preliminary resource model at Moroy. The mine
design will be adjusted once the resource model is finalized. The mine
design at Barry will start once the resource model has been
completed.
Management and Board Changes
Bonterra recently made changes to its board of directors with the
addition of Akiba Leisman, a consultant at Wexford Capital LP, and
Matthew Happyjack, President and CEO of Air Creebec. Mr. Leisman
brings a wealth of experience to the board in the sectors of capital
markets and mine finance. Mr. Happyjack has a strong background in
business management and operations, particularly in the Val-d'Or
region. In addition, the Company has retained the services of a well-
known consulting resource geologist to work with SGS Geostat on the
completion of the mineral resource estimate.
Qualified Person
Pascal Hamelin, P. Eng., VP Operations, is the Qualified Person
under NI 43-101, responsible for reviewing and approving the
technical information contained in this news release.
Neither the TSX Venture Exchange nor its Regulation Services
Provider (as that term is defined in the policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of this
release.
Cautionary and Forward-Looking Statements
This press release contains "forward-looking information" that is based
on Bonterra's current expectations. The words "will", "anticipated",
"plans" or other similar words and phrases are intended to identify
forward-looking information. Forward-looking information is subject to
known and unknown risks, uncertainties and other factors that may
cause Bonterra's actual achievements to be materially different from
those expressed or implied by such forward-looking information. Such
factors include but are not limited to uncertainties of the outcome of
legal proceedings. This list is not exhaustive of the factors that may
affect our forward-looking information. These and other factors should
be considered carefully and readers should not place undue reliance
on such forward-looking information. Bonterra disclaims any intention
or obligation to update or revise forward-looking information, whether
as a result of new information, future events or otherwise.
View original content to download
multimedia:http://www.prnewswire.com/news-releases/bonterra-
provides-corporate-update-300841775.html
SOURCE Bonterra Resources Inc.
View original content to download multimedia:
http://www.newswire.ca/en/releases/archive/May2019/01/c2240.html
%SEDAR: 00026953E
For further information: Interim Chief Executive Officer: Greg
Gibson, 819-825-8678 | [email protected]; 2872 Sullivan Road, Suite 2,
Val d'Or, Quebec J9P 0B9. 819-825-8678 | website: www.btrgold.com
CO: Bonterra Resources Inc.
CNW 09:09e 01-MAY-19