Brunswick Exploration Starts Maiden Drilling Program at Anatacau Main
Brunswick Exploration Starts Maiden Drilling Program at Anatacau Main
MONTREAL, Sept. 04, 2025 -- Brunswick Exploration Inc. (TSX-V: BRW, OTCQB: BRWXF; FRANKFURT:1XQ; “BRW” or
the “Company”) is pleased to announce that it has begun drilling at the Anatacau Main Project, located in the Eeyou-Istchee
James Bay region of Quebec. The drill program will target the Anais lithium discovery, located 22 kilometers east and along
strike from Rio Tinto’s Galaxy project and BRW’s Anatacau West project.
Mr. Killian Charles, President and CEO of BRW, commented: “Beyond our favorable results in Greenland, we continue to
advance our portfolio of assets in Quebec. We expect to complete our maiden resource estimate at Mirage in Q4 and, now,
have begun an exciting new drill program at Anatacau Main, one of our first Canadian lithium discoveries. Our previous work at
the neighbouring Anatacau West project demonstrated that mineralization is immediately contiguous east of the Galaxy
Lithium project. Importantly, we believe the Anais showing also possesses the same structural context and similar geological
features to the Galaxy Lithium project.”
Anatacau Main Overview
Brunswick Exploration expects to drill between 1,000 and 1,500 meters comprised of 10 inclined holes at an average length of
150 meters each. The first five drill holes are collared on the Anais discovery made by the BRW team in 2023, which consists
of several parallel pegmatite dykes with visible spodumene mineralization. The largest dyke found to date is exposed over a 15
m wide by 100 m long outcrop (see press release dated July 13, 2023).
Figure 1: Anatacau Main Project Location
The Anatacau Main project is straddled by a large-scale E-W deformation corridor, hosting Rio Tinto’s Galaxy Lithium project
where mineralization is constrained to multiple extensional lithium-bearing pegmatite dykes (see figure 1). This corridor runs
through both the Anatacau West and Anatacau Main projects. Combined, BRW controls over 30 km of favorable structure,
with potential for more lithium discoveries with the area immediately surrounding the Anais showing being most prospective.
The drilling will be ground supported and operated from the Company’s neighbouring camp. It is easily accessible from the
paved Billy Diamond Highway, located approximately 21 km east of the “KM 381” rest stop that can provide accommodation,
catering, fuel and power. This drilling program is partially financed by the Ministry of Natural Resources and Forests of the
Quebec Government, up to a maximum amount of $293,273. Brunswick Exploration would like to thank the Quebec
Government for its initiative to support the mining exploration industry and continued advancement of critical and strategic
minerals projects.
Qualified Person
The scientific and technical information related to this press release has been reviewed and approved by Mr. Francois Goulet,
Manager Quebec. He is a Professional Geologist registered in Quebec.
About Brunswick Exploration Inc.
Brunswick Exploration is a Montreal-based mineral exploration company listed on the TSX-V under symbol BRW. The
Company is focused on grassroots exploration for lithium in Canada, a critical metal necessary to global decarbonization and
energy transition. The company is rapidly advancing its extensive grassroots lithium property portfolio in Canada and
Greenland.
Investor Relations/information
Mr. Killian Charles, President and CEO ([email protected])
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of this release
Cautionary Statement on Forward-Looking Information
This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation
based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves
risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to
differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results
to differ materially from such forward-looking information include, but are not limited to, delays in obtaining or failures to obtain
required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing
needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of
projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the
Corporation’s public documents filed on SEDAR at www.sedar.com. Although the Corporation believes that the assumptions
and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not
be placed on such information, which only applies as of the date of this news release, and no assurance can be given that
such events will occur in the disclosed time frames or at all. The Corporation disclaims any intention or obligation to update or
revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as
required by law. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.
A photo accompanying this announcement is available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/fbad1753-51e2-4ab9-80a1-5f7543e3e981