Brunswick Exploration Reports Phase 1 Metallurgical Results at Mirage with Potential for DMS-Only Flowsheet
Brunswick Exploration Reports Phase 1 Metallurgical Results at Mirage with
Potential for DMS-Only Flowsheet
MONTREAL, Feb. 03, 2025 -- Brunswick Exploration Inc. (TSX-V: BRW, OTCQB: BRWXF; FRANKFURT:1XQ;; “BRW” or
the “Company”) is pleased to report preliminary, Phase 1, metallurgical results from test work on drill core samples from the
Mirage Project. The test was conducted by SGS Canada Inc. in Lakefield, Ontario and comprised of heavy liquid separation
(“HLS”) testing, and dense media separation (“DMS”) testing. The program was completed on a representative mineralized
dyke comprising of material from MR-6, MR-3, MR-4 and a single dyke in the stacked dyke area.
Highlights include:
• Potential for best-in-class flow sheet consisting of crushing followed by dense media separation only with no need for
flotation. Projects with similar flow sheet have consistently demonstrated lower milling operating cost to achieve
industry standard concentrate grade of 5.5% Li2O.
• Preliminary recoveries of 76% producing a spodumene concentrate grading 5.5% Li2O for HLS testing and recoveries of
68.4% producing a spodumene concentrate grading 5.7% Li2O for DMS testing both at coarse grain size.
• Low iron concentration in both HLS and DMS concentrate indicative of high quality spodumene with low impurities.
Current testwork suggest no deleterious elements identified in either concentrate.
• Further test work is planned in 2025 to build upon this initial set of results with opportunities to increase DMS
recoveries already identified.
Mr. Killian Charles, President and CEO of BRW, commented: “As we continue to advance Mirage, we are pleased to reveal
that lithium extraction at Mirage could potentially utilize a DMS-only circuit without the need for higher cost flotation to
increase recoveries to acceptable levels. The resulting concentrate is considered clean with low iron concentrations and low
level of other impurities. Importantly, today’s preliminary results are generally in-line with high quality projects such as Patriot
Battery Metals’ Shaakichiuwaanaan project or Winsome’s Adina project. We will look to further characterize and potentially
improve on these metallurgical results in 2025 as we continue to grow Mirage’s value proposition.
Phase 1 Metallurgical Test work
This first test program was planned, directed and completed with the support of BBA Consultants (“BBA”). The metallurgical
test work was undertaken at SGS Canada Inc. in Lakefield Ontario using four (4) representative composite drill core intersects
(see Table 1). These intersections were chosen based on their representativity of the Mirage project to date and were blended
to form one master composite sample upon which the test program was performed.
Table 1: Selected Composite Intercepts
Dyke Hole ID Li2O (%) Length (m) Proportion
MR-6 MR-24-91 1.40 56 42%
MR-3 MR-24-94 1.10 9.9 23%
MR-4 MR-24-92 3.30 14.1 21%
Stacked Dyke MR-24-76 3.09 10.9 14%
Following validation of the proportion and the assay grade of each intercept, the material was blended and subjected to master
composite characterization and HLS sample preparation. No “ore dilution” with waste rock was applied in this Phase 1 test
program.
Two feed size options were prepared for HLS tests: 9.5 mm and 6.3 mm. Both samples were screened from 0.85mm and the
resulting fine fraction was removed to improve the efficiency of the separation process. Only the coarse fraction is subjected to
HLS or DMS testing. Recoveries of the fine fraction combined with the middlings of the DMS is typically achieved through
grinding, desliming and flotation and is in the flowsheet if economic recoveries cannot be achieved by coarse beneficiation
only, such as DMS.
Based on preliminary HLS results (see Table 2), higher recoveries were observed when material was crushed to 6.3 mm. This
sample was selected for further evaluation for DMS-only recovery with a concentrate grade target of approximately 5.5% Li2O.
The test was successful and achieved an above average concentrate grade of 5.7% Li2O concentrate with an overall lithium
recovery of 68.4% from a feed sample with a head grade of 1.59% Li2O. Iron concentration was evaluated at 0.65% Fe2O3
with all deleterious elements well below penalty levels (see Figure 1).
Table 2: HLS Test results
Head Grade Concentrate Li
(% Li2O) Grade, (% Li2O) Recovery (%)
9.5mm 1.55 5.5 67.6
6.0 57.0
6.3mm 1.59 5.5 76.0
6.0 69.8
Figure 1: Global Assays of all product streams of DMS Testing
Assays%
Li2O SiO2 Al2O3 Fe2O3 MgO CaO Na2O K2O MnO P2O5
MC DMS Conc 5.70 67.6 23.6 0.65 0.04 0.24 0.81 0.51 0.20 0.04
MC DMS Middlings 1.29 78.5 13.5 0.29 0.04 0.43 3.10 1.52 0.09 0.05
MC DMS Tailings 0.07 77.6 13.0 0.13 0.02 0.42 4.50 3.64 0.03 0.05
MC DMS -0.85 mm
Fines 1.01 77.2 13.2 0.84 0.28 0.69 3.23 2.27 0.10 0.06
Next Steps
Further work is planned for the Mirage project to advance metallurgical testing program. The company will focus on continuing
drill exploration and to advance the project to reach a first mineral resource estimation. Following this milestone, the
metallurgical testing program will be completed by testing the representative samples of the developed material by
investigating the impact of ore dilution and identifying opportunities for further process optimization.
Process Definitions
Heavy Liquid Separation (HLS): HLS tests involve repeated tests at multiple densities in synthetic heavy liquid solutions to
determine the optimum SG for mineral separation. In this case, the heavy liquid comprised of methylene iodide diluted with
acetone to target various specific gravity (SG) cut points including 2.65, 2.70, 2.80, 2.85, 2.90, 2.95, and 3.00. The test work
is used to determine the susceptibility of ore to dense media separation process.
Dense Media Separation (DMS): Dense media separation tests are carried out to estimate the real life response of the ore
to dense media separation and done by applying gravity separation at selected media densities (during HLS tests), which are
prepared by mixing ferrosilicon and/or magnetite in water in this project.
Option Grant
The Company’s Board of Directors have approved the grant of incentive stock options to directors, officers, employees and
consultants to purchase up to an aggregate of 3,430,00 common shares in the capital stock of the Company. Grants are
subject to a three-year vesting period and a five-year term at an exercise price of $0.14 per share.
QAQC
All drill core samples were collected under the supervision of BRW employees and contractors using HQ size for MR-24-91,
MR-24-91, MR-24-94 and NQ size for MR-24-76. Samples were bagged and groups of samples were placed in larger bags,
sealed with numbered tags, in order to maintain a chain of custody. Samples from HQ size core sample were split to use one
quarter for analytical analysis and half of the core were used for NQ size core sample. The sample bags were transported from
the BRW contractor facility to the SGS Lakefield facility.
Qualified Person
The scientific and technical information contained in this press release has been reviewed and approved by Mr. Simon T.
Hébert, VP Development. He is a Professional Geologist registered in Quebec and is a Qualified Person as defined by
National Instrument 43-101.
BRW relied on the expertise of Dr. Seref Girgin (Senior Metallurgist) and Vera Gella (P. Eng, QP) from BBA Consultants.
About Brunswick Exploration
Brunswick Exploration is a Montreal-based mineral exploration company listed on the TSX-V under symbol BRW. The
Company is focused on grassroots exploration for lithium in Canada, a critical metal necessary to global decarbonization and
energy transition. The company is rapidly advancing the most extensive grassroots lithium property portfolio in Canada and
Greenland.
Investor Relations/information
Mr. Killian Charles, President and CEO ([email protected])
Cautionary Statement on Forward-Looking Information
This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation
based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves
risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to
differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results
to differ materially from such forward-looking information include, but are not limited to, delays in obtaining or failures to obtain
required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing
needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of
projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the
Corporation’s public documents filed on SEDAR at www.sedar.com. Although the Corporation believes that the assumptions
and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not
be placed on such information, which only applies as of the date of this news release, and no assurance can be given that
such events will occur in the disclosed time frames or at all. The Corporation disclaims any intention or obligation to update or
revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as
required by law. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.