Brunswick Exploration Increases Anais Strike Extent to Over 350 Meters
Brunswick Exploration Increases Anais Strike Extent to Over 350 Meters
MONTREAL, June 10, 2026 -- Brunswick Exploration Inc. (TSX-V: BRW, OTCQB: BRWXF; FRANKFURT:1XQ; “BRW” or
the “Company”) is pleased to announce final assay results from the 2026 Winter drilling campaign at the Anatacau Main
Project. Today’s results once again highlight the excellent lateral continuity of the main Anais dyke, with step-out drilling
intersecting multiple large, well-mineralized pegmatites.
Highlights include:
• The largest pegmatite, the Anais Main dyke, remains open in all directions after another step-out hole
intercepted 1.13% Li2O over 27.4 meters in AN-26-12 at very shallow depths.
• The mineralized dyke system has been delineated over an area of approximately 350 meters wide by 600
meters long, and the system remains open in all directions .
• Significant opportunity to expand mineralization in further drilling planned in late Q3.
Mr. Killian Charles, President and CEO of BRW, commented: “Anatacau is rapidly shaping up to be one of the most exciting
new discoveries in the James Bay region. After every drilling campaign at Anatacau, we continue to grow the footprint of the
pegmatite dyke system with several intervals occurring over substantial widths, highlighting the scale and exploration potential
of Anatacau. We now strongly believe that Anatacau is starting to show the same potential as our Mirage project. This unique
combination of two highly promising projects demonstrates BRW ability to continue to make impactful discoveries across its
portfolio. We look forward to returning to Anatacau in late Q3-2026 following the completion of our forthcoming drill campaign at
Mirage.”
Table 1: Mineralized Highlights from All Drilling at Anatacau Main
Hole ID From (m) To (m) Length (m) Li2O (%) Ta2O5 (ppm) Cs2O (%)
AN-25-05* 30.3 151.0 120.7 1.31 112 0.09
AN-26-07* 124.7 292.6 167.9 1.02 84 0.05
incl. 202.1 292.6 90.5 1.31 165 0.03
incl. 202.1 260,6 58.5 1.60 83 0.03
AN-26-12 114.6 142.0 27.4 1.13 124 0.03
incl. 117.9 130.3 12.4 1.42 155 0.02
incl 134.6 140.0 5.4 1.39 127 0.02
The true thickness of the Anais dyke is estimated to be approximately 70%.
*Previously reported intercept
Geology Overview
The area surrounding the Anais Main dyke forms an extensive mineralized system that has now been drill-traced over more
than 350 meters by 600 meters. The mineralized system is mostly hosted within highly folded and sheared mafic-volcanic and
metasedimentary rocks. Drilling in the area has consistently intersected high grade lithium mineralization and, in some cases,
also intersected pegmatites highly enriched in cesium and tantalum, with all types of mineralization occurring over substantial
widths (Figure 1).
Within this rapidly growing system, seven mineralized dykes exceeding 10 meters in width have been identified with the
largest being the Anais Main dyke. All intersected mineralized pegmatites remain open in all directions.
The Anais Main dyke is interpreted to be gently folded, oriented North-South to Northeast-Southwest, dipping at 85° to the
West. To date, this dyke measures 350 meters along strike to a vertical depth of 200 meters and a width of approximately 40
meters.
The surrounding several mineralized dykes are interpreted to be stacked, subparallel, and steeply dipping toward the west, and
are all hosted within the same structural corridor that hosts Rio Tinto’s Galaxy Project (54.3 Mt M&I at 1.30% Li ₂O and 55.9
Mt Inferred at 1.29% Li ₂O, see Note) and BRW’s Anatacau West Project, which is immediately contiguous to Rio Tinto’s
claim package and located approximately 20 kilometers west of the Anais Main dyke (Figure 3).
Discussion of Results
Hole AN-26-12 collared into a mineralized pegmatite and intersected six well-mineralized, stacked pegmatite dykes, including
a continuous interval of lithium mineralization of 27.4 meters grading 1.13% Li ₂O at a very shallow vertical depth of 90 meters
(Figure 2). This interval appears to correlate with the Anais Main dyke, located approximately 80 meters to the Northeast,
which has now been continuously intersected over large widths by drilling over a strike length of 350 meters.
Holes AN-26-11 and AN-26-13 were drilled in a wide fence pattern, to evaluate the extreme eastward extension of the
mineralized system. It was interpreted that both holes were drilled outside of the deformation corridor which hosts
mineralization at Anatacau. Nonetheless, the holes still intersected several highly fractioned pegmatites. While no significant
lithium values were reported, assays returned elevated cesium and tantalum values which, when combined with low K/Rb
ratios in the pegmatites, confirms that the pegmatite system remains fractionated even outside the structural corridor
significantly expanding the exploration potential surrounding the Anais Main dyke area.
Next Steps
The Company has now reported all results from its 2026 winter drilling campaign, which comprised seven drill holes totaling
over 1,800 meters. Following these encouraging drilling results, the Company is now planning further drilling in late Q3-2026
following a drilling campaign at Mirage.
Figure 1: Surface Map of the Anatacau Main Project and Drill Holes Completed
Figure 2: Cross Section C-C’ (see Figure 1 for Location)
Figure 3: Regional Map of the Anatacau Main and Anatacau West Projects
Table 2: Drill Hole Collars (UTM Nad83, Zone 18N)
Drill Holes Azimuth Dip Length (m) UTM X UTM Y Elevation (m)
AN-26-11 118 -47 201 380959 5784469 204
AN-26-12 125 -46 240 380182 5784459 208
AN-26-13 134 -61 258 381157 5784322 200
Note
SEC Technical Report Summary for the James Bay Lithium Project prepared by SLR Consulting (Canada), Wave International
Pty and WSP Canada for Arcadium Lithium Plc., dated August 31, 2023.
QAQC
All drill core samples were collected under the supervision of BRW employees and services contractor Explo-Logik, applying
industry-standard QA/QC procedures to its drilling and prospecting programs. All sample preparation and analytical work was
performed by Agat Laboratories. Samples were prepared with methods 200075 and 200087 and dissolved in a sodium peroxide
solution, prior to multielement analysis by ICP-OES and ICP-MS according to the Agat method 201378. All results passed the
QA/QC screening at the laboratory, and all inserted standard, duplicates and blanks returned results within acceptable limits.
All reported drill intersections are calculated on the basis of a lower cutoff grade of 0.30% Li2O.
Qualified Person
The scientific and technical information contained in this press release has been reviewed and approved by Mr. François
Goulet, Manager Quebec. He is a Professional Geologist registered in Quebec and is a Qualified Person as defined by
National Instrument 43-101.
About Brunswick Exploration Inc.
Brunswick Exploration is a Montreal-based mineral exploration company listed on the TSX-V under symbol BRW. The
Company is focused on grassroots exploration for lithium in Canada, a critical metal necessary to global decarbonization and
energy transition. The Company is rapidly advancing the most extensive grassroots lithium property portfolio in Canada,
Greenland and Saudi Arabia underpinned by its Mirage project, one of the largest undeveloped hard-rock lithium Inferred
Mineral Resource Estimate in the Americas, with 52.2Mt grading 1.08% Li2O.
Investor Relations/information
Mr. Killian Charles, President and CEO ([email protected])
Contact number: 514 861 4441
Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of this release
Cautionary Statement on Forward-Looking Information
This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation
based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves
risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to
differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results
to differ materially from such forward-looking information include, but are not limited to, delays in obtaining or failures to obtain
required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing
needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of
projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the
Corpopany public documents filed on SEDAR at www.sedar.com. Although the Company believes that the assumptions and
factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be
placed on such information, which only applies as of the date of this news release, and no assurance can be given that such
events will occur in the disclosed time frames or at all. The Company disclaims any intention or obligation to update or revise
any forward-looking information, whether as a result of new information, future events or otherwise, other than as required by
law. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX
Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.
Photos accompanying this announcement are available at:
https://www.globenewswire.com/NewsRoom/AttachmentNg/27ad4738-89ea-472b-897d-d7c5bbcd8ea8
https://www.globenewswire.com/NewsRoom/AttachmentNg/6a2ca4d0-c916-449f-8007-d951b2a93f20
https://www.globenewswire.com/NewsRoom/AttachmentNg/bdce6f26-3472-4d00-927b-9b63e854eb30