MONTREAL, July 09, 2025 -- Brunswick Exploration Inc. (TSX-V: BRW, OTCQB: BRWXF; “BRW” or the “Company”) is
pleased to report the final set of results obtained as part of the 2025 Winter drill campaign conducted on its Mirage Project.
The Mirage Project is located in the Eeyou Istchee–James Bay region of Quebec, approximately 40 kilometers south of the
Trans-Taiga Road. This press release primarily focuses on the drilling work carried out in the eastern extension of the MR-6
dyke and the “Stacked Dyke” zone.
Highlights include:
• The discovery of a further three new major dykes located between 200 and 500 meters northeast of MR-6, which
returned 33.2 meters at 1.1% Li ₂O in drill hole MR-25-110, 20 meters at 1.3% Li ₂O and 11 meters at 1.2% Li ₂O in
drill hole MR-25-112.
• The “Stacked Dyke” zone was extended 150 meters to the north, with hole MR-25-106 intersecting 17.4 meters at
1.01% Li₂O.
• Over the course of the Winter 2025 program, BRW has discovered a total of 4 new major dykes measuring between
10 meters and 35 meters, all located near surface and in the core of the project all of which remain open in all
directions.
• Elevated tantalum concentrations continue to be strongly associated with lithium mineralization with values consistently
ranging from 150 to 350ppm. Further metallurgical work will be completed to determine the viability of producing a
tantalum byproduct.
Mr. Killian Charles, President and CEO of BRW, commented: “Brunswick Exploration remains one of the most compelling
stories in the mining sector as we leverage the atypical combination of advanced exploration work at Mirage alongside an
aggressive global lithium grassroot program which has no comparable peers. As the lithium market regains strength over the
coming quarters and years, we are uniquely positioned to benefit from new discoveries and the continued development of
Mirage.
“Today’s results serve once more to highlight the exploration potential of Mirage. Even after more than 20,000 meters of drilling
over the last 18 months, we have repeatedly and continue to intercept new dykes of appreciable width and grade. As we move
toward a maiden resource estimate in late 2025, I am extremely proud of the work the BRW exploration team has achieved
across its still growing pipeline of projects.”
Mirage Project Drilling Overview
The Mirage Project comprises 427 claims located roughly 40 kilometers south of the Trans-Taiga Highway in Quebec’s James
Bay region and 34 kilometers northeast of Winsome Resources’ Adina Project.
The drilling campaign was primarily aimed at extending the mineralized “Stacked Dyke” zone to the northeast. The highlights
presented in this press release are shown in Table 1 and Figures 1 and 2. Collar locations are provided in Table 2.
Figure 1: Zone Location at Mirage Project
Figure 2: Central Zone of the Mirage Project
Drill hole MR-25-110 led to the discovery of a new spodumene-bearing pegmatite dyke, grading 1.1% Li ₂O over 33.2 meters
from 217 to 251 meters (vertical depth of 180 meters), while drill hole MR-25-112 returned 1.3% Li₂O over 20 meters from 367.9
to 387 meters (vertical depth of 290 meters). These two new dykes are interpreted to be sub-parallel, oriented approximately
N130/30. Drill hole MR-25-112 also intersected another dyke grading 1.2% Li ₂O over 11 meters from 328 to 339 meters
(vertical depth of 250 meters), which is believed to be also parallel to the others. These new intersections highlight the
stacking of sub-horizontal mineralized dykes in this area. The dykes remain open in all directions.
Figure 3: Section A-A’
Drill hole MR-25-117 also intersected a 27-meter-wide pegmatite from 329 to 356 meters. This pegmatite is interpreted to be
the same one intersected in drill hole MR-25-112 (which returned 1.3% Li ₂O over 20 meters from 367.9 to 387 meters).
However, due to the proximity of the Lac Orion fault, in MR-25-117, the pegmatite shows significant alteration and the
spodumene has been largely replaced by cookeite. As a result, lower values of lithium were reported and only a smaller
subinterval returned significant lithium with 1.8% Li ₂O over 3.2 meters. Nonetheless, the presence of the dyke over sizeable
widths is extremely encouraging and remains an excellent follow-up target for further drilling campaign.
Drill hole MR-25-109 extended the “Stacked Dyke” zone by more than 100 meters to the North, with several spodumene-
bearing pegmatite intersections. The widest interval returned 1.3% Li₂O over 13.3 meters, from 21.4 to 34.7 meters. The dykes
in this hole are sub-horizontal and demonstrate a change in orientation compared to the central zone, where dykes typically
dip 60 to 70 degrees to the southeast.
Drill hole MR-25-116 intersected over forty moderately mineralized pegmatite dykes, generally of limited thickness. While the
lithium grades were modest, this hole highlights the strong potential for the mineralized system to continue toward the
Northeast. The intersected dykes remain open in all directions.
Drill hole MR-25-113, located approximately 4.5 km northeast of the central zone, was completed as a reconnaissance
exploration hole. Unfortunately, no spodumene-bearing pegmatite was intersected in this hole.
Table 1: 2025 Winter Drilling Program Discussed in this Release
Hole ID From (m) To (m) Length (m) Li2O (%) Ta2O5 (ppm)
MR-25-109 21.4 34.7 13.3 1.3 351
MR-25-109 64.5 69.2 4.7 1.2 266
MR-25-109 106.6 111.8 5.2 1.3 222
MR-25-110 42.6 47.6 5.0 1.0 245
MR-25-110 217.8 251.0 33.2 1.1 128
MR-25-112 113.9 116.3 2.3 1.4 183
MR-25-112 251.5 253.7 2.2 0.8 172
MR-25-112 316.0 321.4 5.4 1.2 193
MR-25-112 328.0 339.0 11.0 1.2 160
MR-25-112 367.9 387.8 20.0 1.3 231
MR-25-116 52.6 55.8 3.2 0.9 172
MR-25-116 74.5 76.8 2.3 0.5 140
MR-25-116 152.0 164.9 13.0 0.3 123
MR-25-116 200.7 203.6 2.9 1.1 141
MR-25-117 210.9 212.9 2.0 1.2 281
MR-25-117 341.5 344.6 3.2 1.8 309
True thickness is estimated to vary between 80% and 90% across all reported holes in the 2025 Winter campaign.
Table 2 : Drill Hole Collars
Hole ID Azimut Dip Length (m) UTM NAD83 z18 - East UTM NAD83 z18 - North
MR-25-109 300 -55 279 683432 5941447
MR-25-110 300 -55 267 683227 5941533
MR-25-112 300 -55 399 683324 5941492
MR-25-113 300 -55 169.7 686828 5943668
MR-25-116 340 -45 300 683577 5941438
MR-25-117 300 -50 363 683463 5941701
3D model update
Following the completion of the 2025 Winter drill campaign, Brunswick Exploration, in collaboration with PLR Resources
(https://www.plr-resources.com/), updated its 3D model in preparation for a first resource estimate planned for late 2025.
Figure 3 shows the location of the sections presented in Figures 5 and 6.
Figure 4: Location of Section B-B’ and C-C’
Figure 5: Section B-B’’
Figure 6: Section C-C’
Observations from field work and drilling indicate that the geometry of the pegmatite dykes in the core of the project (covering
North, Central and South Zone) is closely linked to a regional antiformal folding pattern. Although the dykes locally appear to
be folded, evidence strongly supports that their emplacement was primarily controlled by the hinges of these antiformal folds,
rather than the dykes being simply passively deformed post-emplacement.
The emplacement of the pegmatites is interpreted as syn- to post-tectonic, likely occurring towards the final stages of the
second deformation event in the region. This timing corresponds with a decrease in regional stress conditions, allowing
pegmatitic melts to be focused and emplaced in structurally favorable zones such as fold hinges and lithological contacts.
Hydrothermal alteration observed in specific segments of certain pegmatite dykes, notably at MR-3 and MR-6, indicates post-
emplacement metasomatic fluid activity. These fluids are believed to be associated with reactivation along nearby structures,
particularly the Orion Lake Fault, which likely acted as a fluid conduit during late-stage tectonism.
Of note, the role of gabbroic units in the area remains to be fully determined; however, their consistent spatial association with
pegmatite dykes suggests they may also have influenced pegmatite emplacement. Some pegmatite dykes could be guided by
contacts between metagabbro and metavolcanic rocks, potentially acting as rheological boundaries favorable to dyke
propagation.
QAQC
All drill core samples were collected under the supervision of BRW employees and contractors. The drill core was transported
by helicopter and by truck from the drill platform to the core logging facility in Val-d’Or. Each core was then logged,
photographed, tagged, and split by diamond saw before being sampled. All pegmatite intervals were sampled at approximately
1-meter intervals to ensure representativity. Samples were bagged; duplicated on reject, blanks and certified reference
materials for lithium were inserted every 20 samples. Samples were bagged and groups of samples were placed in larger bags,
sealed with numbered tags, in order to maintain a chain of custody. The sample bags were transported from the BRW
contractor facility to the AGAT laboratory in Val-d’Or. All sample preparation and analytical work was performed by AGAT by
sodium peroxide fusion with ICP-OES and ICP-MS finish. All results passed the QA/QC screening at the lab and all inserted
standard and blanks returned results that were within acceptable limits. All reported drill intersections are calculated based on
a lower cutoff grade of 0.3% Li2O, with maximum internal dilution of 5 meters. Host basalts adjacent to the dykes may grade
up to 0.3% Li2O but were excluded from the reported intersections.
Qualified Person
The scientific and technical information contained in this press release has been reviewed and approved by Mr. Simon T.
Hébert, VP Development. He is a Professional Geologist registered in Quebec and is a Qualified Person as defined by
National Instrument 43-101.
About Brunswick Exploration
Brunswick Exploration is a Montreal-based mineral exploration company listed on the TSX-V under symbol BRW. The
Company is focused on grassroots exploration for lithium in Canada, a critical metal necessary to global decarbonization and
energy transition. The company is rapidly advancing the most extensive grassroots lithium property portfolio in Canada and
Greenland.
Investor Relations/information
Mr. Killian Charles, President and CEO ([email protected])
Cautionary Statement on Forward-Looking Information
This news release contains "forward-looking information" within the meaning of applicable Canadian securities legislation
based on expectations, estimates and projections as at the date of this news release. Forward-looking information involves
risks, uncertainties and other factors that could cause actual events, results, performance, prospects and opportunities to
differ materially from those expressed or implied by such forward-looking information. Factors that could cause actual results
to differ materially from such forward-looking information include, but are not limited to, delays in obtaining or failures to obtain
required governmental, environmental or other project approvals; uncertainties relating to the availability and costs of financing
needed in the future; changes in equity markets; inflation; fluctuations in commodity prices; delays in the development of
projects; the other risks involved in the mineral exploration and development industry; and those risks set out in the
Corporation’s public documents filed on SEDAR at www.sedar.com. Although the Corporation believes that the assumptions
and factors used in preparing the forward-looking information in this news release are reasonable, undue reliance should not
be placed on such information, which only applies as of the date of this news release, and no assurance can be given that
such events will occur in the disclosed time frames or at all. The Corporation disclaims any intention or obligation to update or
revise any forward-looking information, whether as a result of new information, future events or otherwise, other than as
required by law. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies
of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.
Photos accompanying this announcement are available at
https://www.globenewswire.com/NewsRoom/AttachmentNg/d95734af-c249-4da4-a9c2-bb5fbe0aab0f
https://www.globenewswire.com/NewsRoom/AttachmentNg/41eac253-f61c-43b4-9753-2cd3d0d6d55d
https://www.globenewswire.com/NewsRoom/AttachmentNg/550313e2-f6ad-4966-987c-6d023678ec1f
https://www.globenewswire.com/NewsRoom/AttachmentNg/e588a1b4-6128-41e3-944c-5b1097b8ab98
https://www.globenewswire.com/NewsRoom/AttachmentNg/58151d57-78ac-4465-adbf-aaf2e0b9ff43
https://www.globenewswire.com/NewsRoom/AttachmentNg/2f47949b-b03c-4a78-b3f1-a3c289f8b234