Bravo’s Nickel-Copper Massive Sulphide Intercept Returns High-Grade PGMs
NEWS RELEASE
17 October 2022
Bravo’s Nickel-Copper Massive Sulphide Intercept Returns High-Grade PGMs
Results Include 11m @ 4.24 g/t 3PGM+Au, 2.04% Nickel + 1.23% Copper
VANCOUVER, October 17, 2022 – Bravo Mining Corp. (TSX.V: BRVO, OTCQX: BRVMF), (“Bravo” or the “Company”)
today announced that high-grade PGM assay results have been received for previously released diamond drill hole
DDH22LU047. Hole DDH22LU047intercepted high-grade nickel and copper at its Luanga palladium + platinum +
rhodium + gold + nickel (PGM+Au+Ni) project (“Luanga”), located in the Carajás Mineral Province, state of Pará,
Brazil.
The high-grade intercept in hole - DDH22LU047 graded 4.24 g/t 3PGM+Au with 2.04% nickel and 1.23% copper
over 11.04m and occurs in massive and semi-massive sulphides.
“As announced in Bravo’s August 16 th, 2022 news release , high -grade nickel-copper mineralization had not been
previously observed at Luanga. This discovery suggests potential for other metals and styles of mineralization than
previously intercepted at Luanga, and we are extremely encouraged that it also contains high grade PGMs," said Luis
Azevedo, Chairman and CEO of Bravo. " Downhole EM has commenced and should greatly assist in target ing follow
up drilling, whilst surface EM has the potential to identify other massive and semi-massive sulphide mineralization
along Luanga’s 8.1 km mineralized strike.”
Highlights:
HOLE-ID From
(m)
To
(m)
Thickness
(m)
Pd
(g/t)
Pt
(g/t)
Rh
(g/t)
Au
(g/t)
PGM +
Au (g/t)
Cu
(%)
Ni (%)
(Sulphide) Type
DDH22LU047 131.11 142.15 11.04 3.56 0.57 0.07 0.04 4.24 1.23 2.04 FR
Notes: All ‘From’, ‘To’ depths, and ‘Thicknesses’ are downhole.
Given the orientation of the hole and the mineralization, the intercept is estimated to be 85% of true thickness.
Type: FR = Fresh Rock. Recovery methods and results will differ based on the type of mineralization.
• Two diamond drill holes have been completed on each of two drill sections located 50m north and south of
DDH22LU047.
• All four step-out drill holes have intersected varying amounts of semi -massive sulphides. Assay results are
pending.
• Drill rigs have been temporarily moved clear of the area while borehole electromagnetic surveys (“EM”) are
completed on these four step-out drill holes.
• Following the completion of borehole EM, surface fixed loop EM wi ll commence over the entire Luanga
deposit.
NEWS RELEASE
17 October 2022
DDH22LU047: High grade massive sulphide PGM + nickel + copper mineralization at 136.0m*
* Downhole depth
Luanga Drill Program
The Phase 1 diamond drill program continues as planned at Luanga. Six drill rigs are on site, with drilling progressing
in various locations along the entire 8.1km strike length of the known Luanga mineralized envelope (as defined by
historic drilling). To date, 91 drill holes have been completed, for a total of 15,554 metres of the planned 25,500
metre Phase 1 drill program.
Additional details for Intercept in Hole -047
HOLE-ID From
(m)
To
(m)
Thickness
(m)
Pd
(g/t)
Pt
(g/t)
Rh
(g/t)
Au
(g/t)
PGM +
Au (g/t)
Ni
(%)
(Sulp
hide)
Cu
(%) Type
DDH22LU047 131.11 142.15 11.04 3.56 0.57 0.07 0.04 4.24 2.04 1.23 FR
Including 132.26 136.80 4.54 4.03 0.07 0.10 0.03 4.23 2.77 0.54 FR
Including 136.80 137.60 0.80 4.68 0.31 0.08 0.16 5.23 0.98 10.82 FR
Notes: All ‘From’, ‘To’ depths, and ‘Thicknesses’ are downhole.
Given the orientation of the hole and the mineralization, the intercept is estimated to be 85% of true thickness.
Type: FR = Fresh Rock. Recovery methods and results will differ based on the type of mineralization.
NEWS RELEASE
17 October 2022
Location of Bravo Drilling Reported in this Document
About Bravo Mining Corp.
Bravo is a Canada and Brazil-based mineral exploration and development company focused on advancing its Luanga
PGM + Au + Ni Project in the world-class Carajás Mineral Province of Brazil.
The Luanga Project benefits from being in a location close to operating mines, with excellent access and proximity to
existing infrastructure, including road, rail and clean and renewable hydro grid power. The project area was
previously de-forested for agricultural grazing land. Bravo’s current Environmental, Social and Governance activities
includes replanting trees in the project area, hiring and contracting locally, and ensuring protection of the
environment during its exploration activities.
Technical Disclosure
NEWS RELEASE
17 October 2022
Technical information in this news release has been reviewed and approved by Simon Mottram, F.AusIMM (Fellow
Australia Institute of Mining and Metallurgy), President of Bravo Mining Corp. who serves as the Company’s “qualified
person”, as defined in National Instrument 43 -101 Standards of Disclosure for Mineral Projects (“NI 43-101”). Mr.
Mottram has verified the technical data and opinions contained in this news release.
For further information about Bravo, please visit www.bravomining.com or contact:
Alex Penha
EVP Corporate Development
NEWS RELEASE
17 October 2022
Forward Looking Statements
This news release contains forward -looking information which is not comprised of historical facts. Forward -looking
information is characterized by words such as “potential”, “assist”, “ suggest”, and other similar words, phrases or
statements that certain e vents or conditions “should”, or “will” occur.
In particular, this news release contains forward -looking information pertaining to the Company’s ongoing drill
program and the results thereof, including the assay results for the four step-out holes near hole -047 that intercepted
semi-massive sulphides ; the results of geophysical surveys; the potential for the definition o f new styles of
mineralization and the Company’s plans in respect thereof. Forward-looking information involves risks, uncertainties
and other factors that could cause actual events, results, and opportunities to differ materially from those expressed
or implied by such forward-looking information. Factors that could cause actual results to differ materially from such
forward-looking information include, but are not limited to, changes in the state of equity and debt markets,
fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals, environmental
risks, limitations on insurance cov erage; and other risks and uncertainties involved in the mineral exploration and
development industry. Forward-looking information in this news release is based on the opinions and assumptions of
management considered reasonable as of the date hereof, including, but not limited to, the assumption that the assay
results confirm the interpreted mineralization contains significant values of nickel, copper and also contain PGMs and
Au; final drill and assay results will be in line with management’s expectations ; that activities will not be adversely
disrupted or impeded by regulatory, political, community, economic, environmental and/or healthy and safety risks;
that the Luanga Project will not be materially affected by potential supply chain disruptions; and ge neral business
and economic conditions will not change in a materially adverse manner. Although the Company believes that the
assumptions and factors used in preparing the forward -looking information in this news release are reasonable,
undue reliance shou ld not be placed on such information. The Company disclaims any intention or obligation to
update or revise any forward-looking information, other than as required by applicable securities laws.
Schedule 1: Drill Hole Collar Details
HOLE-ID Company East (m) North (m) RL (m) Datum Depth
(m) Azimuth Dip
DDH22LU047 Bravo 659899.99 9342475.05 275.18 SIRGAS2000 UTM22S 170.05 090 -60
Schedule 2: Assay Methodologies and QAQC
Schedule 2: Assay Methodologies and QAQC
Samples follow a chain of custody between collection, processing and delivery to the ALS laboratory in Parauapebas,
state of Par á, Brazil. The drill core is delivered to the core shack at Bravo’s Luanga site facilities and processed by
geologists who inse rt certified reference materials, blanks and duplicates into the sampling sequence. Drill core is
half cut and placed in secured polyurethane bags, then in security-sealed sacks before being delivered directly from
the Luanga site facilities to the Parauap ebas ALS laboratory by Bravo staff. Additional information about the
methodology can be found on the ALS global website (ALS) in the analytical guides. IN this case a split is collected by
Bravo staff and securely delivered to the Intertek laboratory in Parauapebas where it was assayed by high priority for
ore grade Ni and Cu.
Quality Assurance and Quality Control (“QAQC”) is maintained internally at the lab through rigorous use of internal
certified reference materials, blanks, and duplicates. An additional QAQC program is administered by Bravo using
NEWS RELEASE
17 October 2022
certified reference materials, duplicate samples and blank samples that are blindly inserted into the sample batch. If
a QAQC sample returns an unacceptable value an investigation into the results is triggered and when deemed
necessary, the samples that were tested in the batch with the failed QAQC sample are re-tested.
Bravo ALS
Preparation Method Method Method Method
For All Elements Pt, Pd, Au Rh Ni-Sulphide Trace Elements
PREP-31B PGM-ICP27 Rh-MS25 Ni-ICP05 ME-ICP61
Bravo Intertek
Method
Ni, Cu Sulphide
Ni-ICP05