Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BRVO.V ·

Bravo Intercepts High-Grade Nickel/Copper Massive Sulphide Mineralization at Luanga

Exploration Programs

NEWS RELEASE

16 August 2022

Bravo Intercepts High-Grade Nickel/Copper Massive Sulphide Mineralization at Luanga

Results Include 11m @ 2.04% Nickel + 1.23% Copper (PGM Results Pending)

VANCOUVER, August 16, 2022 – Bravo Mining Corp. (TSX.V: BRVO), (“Bravo” or the “Company”) today announced

high grade nickel and copper assay results from the previously released diamond drill hole DDH22LU047 at its Luanga

platinum group metals (palladium + platinum + rhodium) + gold + nickel (PGM+Au+Ni) project (“Luanga”), located in

the Carajás Mineral Province, state of Par á, Brazil. The high-grade intercept of 11.04m grading 2.04% nickel and

1.23% copper occurs in massive and semi -massive sulphides – a style of mineralization not previously observed at

Luanga, increasing the target type potential at the project. Palladium, platinum and rhodium assay results are

pending.

Highlights:

▪ 11.04m @ 2.04% nickel and 1.23% copper, from 131.11m

o Including 4.54m @ 2.77% nickel and 1.23% copper, from 132.26m

o And including 0.80m @ 10.82% copper and 0.98% nickel, from 136.80m

• Contractors arriving onsite this week to commence Downhole Transient Electromagnetic ( “DHTEM”)

surveying at Luanga, starting with DDH22LU047

• Palladium, platinum and rhodium results are pending

DDH22LU047: High grade massive sulphide nickel mineralization at 136.0m*

“As announced in Bravo’s August 3 rd, 2022 news release , h igh-grade nickel-copper mineralization at these

concentrations, has not been observed previously at Luanga and could represent a new type o f mineralisation that

occurs within the Luanga PGM deposit, or a potential indication of feeder zones ," said Luis Azevedo, Chairman and

CEO of Bravo. "DHTEM surveying will commence shortly, which should allow us to vector in on the continuation of

high-grade nickel/copper massive sulphides, guiding follow-up drilling.”

NEWS RELEASE

16 August 2022

Luanga Drill Program

The Phase 1 diamond drill program continues as planned at Luanga. With six drill rigs on site, drilling is now in

progress in various locations along the entire 7km strike length of the known mineralization, including to the north

where the latest and final surface access agreements were recently signed (see August 2, 2022 news release).

Phase 1 drilling is designed to confirm, infill and step out from the previously defined PGM+Au+Ni mineralization in

order to increase confidence in the geological model and provide the basis for future mineral resource estimates.

Additionally, drilling will target potential extensions to the mineralization at depth, as well as exploration targets at

Luanga.

Complete Table of Assay Results

HOLE-ID From

(m)

To

(m)

Thickness

(m)

Ni

(%)

Cu

(%)

Pd

(g/t)

Pt

(g/t)

Rh

(g/t)

Au

(g/t) TYPE

DDH22LU047 131.11 142.15 11.04 2.03 1.23 Pending FR

Including 132.26 136.80 4.54 2.77 0.54 Pending FR

Including 136.80 137.60 0.80 0.98 10.82 Pending FR

• All ‘From’, ‘To’ depths, and ‘Thicknesses’ are downhole

• Given the orientation of the holes and the mineralization, the intercepts are estimated to range from ~80 to 90% of true thickness.

• FR = Fresh Rock.

DDH22LU047: High grade breccia semi–massive sulphide nickel-copper mineralization, from at 137.0m*

DDH22LU047: Drill core showing massive and brecciated semi-massive sulphides, from 131.1m to 142.1m*

* Depths and widths are downhole

NEWS RELEASE

16 August 2022

Location of Bravo Drilling Reported in this Document

NEWS RELEASE

16 August 2022

About Bravo Mining Corp.

Bravo is a Canada and Brazil-based mineral exploration and development company focused on advancing its Luanga

PGM + Au + Ni Project in the world-class Carajás Mineral Province of Brazil.

The Luanga Project benefits from being in a location close to operating mines, with excellent access and proximity to

existing infrastructure, including road, rail and clean and renewable hydro grid power. The project area was

previously de-forested for agricultural grazing land. Bravo’s current Environmental, Social and Governance activities

includes replanting trees in the project area, hiring and contracting locally, and ensuring protection of the

environment during its exploration activities.

Bravo was founded by a management team and board with extensive Brazilian and PGM exploration, permitting,

project financing, construction and op erating experience. This includes Luis Azevedo, Executive Chairman & CEO;

Simon Mottram, President; Alex Penha, EVP Corporate Development; and Independent Directors, Dr. Nicole

Adshead-Bell (Lead Director), Stuart Comline, Tony Polglase and Stephen Quin.

Technical Disclosure

Technical information in this news release has been reviewed and approved by Simon Mottram, F.AusIMM (Fellow

Australia Institute of Mining and Metallurgy), President of Bravo Mining Corp. who serves as the Company’s “qualified

person”, as defined in National Instrument 43 -101 Standards of Disclosure for Mineral Projects (“NI 43-101”). Mr.

Mottram has verified the technical data and opinions contained in this news release.

For further information about Bravo, please visit www.bravomining.com or contact:

Alex Penha

EVP Corporate Development

[email protected]

NEWS RELEASE

16 August 2022

Forward Looking Statements

This news release contains forward -looking information which is not comprised of historical facts. Forward -looking

information is characterized by words such as “confirm”, “designed”, “increase confidence”, “interpreted”, “pending”,

and other similar words , phrases or statements that certain events or conditions “should”, or “will” occur.

In particular, this news release contains forward -looking information pertaining to the Company’s ongoing re -assay

and drill programs and the results thereof ; the expected arrival of geophysical equipment and the results of such

surveys; the potential for the definition o new styles of mineralization and extensions to depth and the Company’s

plans in respect thereof. Forward-looking information involves risks, uncertainties and other factors that could cause

actual events, results, and opportunities to differ materially from those expressed or implied by such forward-looking

information. Factors that could cause actual results to differ materially from such forward -looking information

include, but are not limited to, changes in the state of equity and debt markets, fluctuations in commodity prices,

delays in obtaining required regulatory or governmental approvals, environmental risks, lim itations on insurance

coverage; and other risks and uncertainties involved in the mineral exploration and development industry. Forward -

looking information in this news release is based on the opinions and assumptions of management considered

reasonable as of the date hereof, including, but not limited to, the assumption that the assay results confirm the

interpreted mineralization contains significant values of nickel, copper and also contain PGMs and Au ; final drill and

assay results will be in line with management’s expectations; that activities will not be adversely disrupted or impeded

by regulatory, political, community, economic, environmental and/or healthy and safety risks; that the Luanga Project

will not be materially affected by potential supply chain disruptions; and general business and economic conditions

will not change in a materially adverse manner. Although the Company believes that the assumptions and factors

used in preparing the forward-looking information in this news release are reasonable, undue reliance should not be

placed on such information. The Company disclaims any intention or obligation to update or revise any forward -

looking information, other than as required by applicable securities laws.

NEWS RELEASE

16 August 2022

Schedule 1: Drill Hole Collar Details

HOLE-ID Company East (m) North (m) RL (m) Datum Depth

(m) Azimuth Dip

DDH22LU047 Bravo 659899.99 9342475.05 275.18 SIRGAS2000 UTM22S 170.05 090 -60

Schedule 2: Assay Methodologies and QAQC

Samples follow a chain of custody between collection, processing and delivery to the ALS laboratory in Parauapebas,

state of Par á, Brazil. The drill core is delivered to the core shack at Bravo’s Luanga site facilities and processed by

geologists who insert certified refe rence materials, blanks and duplicates into the sampling sequence. Drill core is

half cut and placed in secured polyurethane bags, then in security-sealed sacks before being delivered directly from

the Luanga site facilities to the Parauapebas ALS laborato ry by Bravo staff. Additional information about the

methodology can be found on the ALS global website (ALS) in the analytical guides. IN this case a split is collected by

Bravo staff and securely delivered to the Intertek laboratory in Parauapebas where it was assayed by high priority for

ore grade Ni and Cu.

Quality Assurance and Quality Control (“QAQC”) is maintained internally at the lab through rigorous use of internal

certified reference materials, blanks, and duplicates. An additional QAQC program is administered by Bravo using

certified reference materials, duplicate samples and blank samples that are blindly inserted into the sample batch. If

a QAQC sample returns an unacceptable value an investigation into the results is triggered and when deemed

necessary, the samples that were tested in the batch with the failed QAQC sample are re-tested.

Bravo ALS

Preparation Method Method Method Method

For All Elements Pt, Pd, Au Rh Ni-Sulphide Trace Elements

PREP-31B PGM-ICP27 Rh-MS25 Ni-ICP05 ME-ICP61

Bravo Intertek

Method

Ni, Cu Sulphide

Ni-ICP05