Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BRVO.V ·

Bravo’s Trenching Program Continues to Expand Oxide PGM+Au Mineralization Highlights include 112m at 1.19g/t PGM+Au, including 16m at 2.76g/t PGM+Au and, 156m at 1.01g/t PGM+Au, including 5m at 5.24g/t PGM+Au

Drill Results Exploration Programs

NEWS RELEASE

16 October 2024

1 | P a g e

Bravo’s Trenching Program Continues to

Expand Oxide PGM+Au Mineralization

Highlights include 112m at 1.19g/t PGM+Au, including 16m at 2.76g/t PGM+Au and,

156m at 1.01g/t PGM+Au, including 5m at 5.24g/t PGM+Au

VANCOUVER, October 16, 2024 – Bravo Mining Corp. (TSX.V: BRVO, OTCQX: BRVMF), (“Bravo” or the “ Company”)

is pleased to report that it has received assay results from eight trenches in the Central and North Sectors at its 100%

owned Luanga palladium + platinum + rhodium + gold + nickel project (“ Luanga” or “Luanga PGM+Au+Ni Project”),

located in the World Class Carajás Mineral Province, state of Pará, Brazil.

“Trenching has uncovered a wider lateral extent of oxide PGM+Au mineralization at surface, which includes areas

with higher grades. These findings suggest a potential increase in the volume of oxide mineralization at Luanga.

Additionally, the higher-grade zones within these sections align with or enhance t he grades observed in the drilling

below the trench lines, supporting our interpretation of supergene enrichment,” said Luis Azevedo, Chairman and CEO

of Bravo.

Highlights Include:

▪ Trenching across the strike of the Luanga PGM+Au+Ni deposit continues to be successful, with work to date

almost complete in the North and Central Sectors. Results highlight significant expansion in the lateral extent

of shallow oxide mineralization, which extends across the topographic highs, along the entire 8.1km strike

length of the Luanga deposit tested to date.

▪ Results confirm the presence of enrichment in the saprolite zone, while encountering grades that are on par

or better than the grade of the oxide mineralization and often improve upon intersections encountered by

drilling in the underlying fresh rock.

▪ In the North Sector, trench TRC24LU043, where more pronounced topography again provides clearer evidence

of supergene enrichment, returned 156.5m @ 1.01g/t PGM+Au, including 5m @ 5.24g/t PGM+Au.

▪ This “mushrooming” of oxide mineralization in the supergene zone demonstrates the potential for volumetric

growth in future volumes of oxide mineralization.

▪ Drilling continues at the T5 target, with assays pending for six drill holes, all of which have all intersected

copper sulphide mineralization on the eastern end of T5.

TRENCH-ID From

(m)

To

(m)

Width

(m)

Pd

(g/t)

Pt

(g/t)

Rh

(g/t) Au (g/t) PGM + Au

(g/t) TYPE

TRC24LU030 51.25 249.45 198.20 0.48 0.22 0.03 0.08 0.81 Ox

TRC24LU031B 17.40 129.75 112.35 0.69 0.40 0.03 0.07 1.19 Ox

Including 39.50 56.10 16.60 1.79 0.70 0.12 0.16 2.76 Ox

TRC24LU032 216.30 329.85 113.55 0.69 0.38 0.02 0.02 1.12 Ox

TRC24LU043 30.15 186.65 156.50 0.56 0.37 0.06 0.02 1.01 Ox

Including 38.00 43.00 5.00 2.87 2.00 0.28 0.09 5.24 Ox

Notes: All ‘From’, ‘To’ depths, and ‘Thicknesses’ are along the topographic surface.

Type: Ox = Oxide. Recovery methods and results will differ based on the type of mineralization.

NEWS RELEASE

16 October 2024

2 | P a g e

Luanga Trenching Program

Trenching across the strike of the Luanga PGM+Au+Ni deposit aims to improve the interpretation of near surface

mineralization and to reduce the distance/spacing between assay data points with the objective of supporting

mineral resource classification to the indicated category. The program continues to be successful in meeting Bravo’s

objectives, with trenching almost complete in the North and Central Sectors and only eight trenches remaining to be

completed this year.

Trenches TRC24LU030, 031A+B, 032, 035 and 036 (Figure 1) cover the southern extent of the Central Sector, while

trenches TRC24LU043 and 044 are at the southern extent of the North Sector. Trenching continues in the Central

Sector, with only 1 trench to complete before commencing in the Southwest Sector. Figure 3 shows the location of

trenches in the Central Sector reported in this news release.

Figure 1: Trenching in the Central Sector.

Trenching results continue to highlight significant expansion in the lateral extent of shallow oxide mineralization,

which extends across the topographically elevated areas, along the entire 8.1km strike length of the Luanga PGM+Au

deposit. R esults also continue to confirm the presence of enrichment in the saprolite zone (above the base of

oxidation), but to lesser degree in the Central Sector where the topographic highs are less exaggerated (see the plan

view in Figure 1 and Section 1 in Figure 2), encountering grades that are equal or better than average grades of oxide

mineralization in surrounding drill holes . In the North Sector , trench TRC24LU043, where more pronounced

topography demonstrates clearer evidence of supergene enrichment, returned a result of 156m @ 1.01g/t PGM+Au,

including 5m @ 5.24g/t PGM+Au.

Figure 2 (Section 1) illustrates the extent of surface oxide mineralization compared to underlying narrower zones of

primary (fresh rock) mineralization observed in drilling below the trench. This “mushrooming” of oxide mineralization

in the supergene zone demonstrates the potential for volumetric growth in future oxide mineral ization that it was

not possible to define by drilling alone.

NEWS RELEASE

16 October 2024

3 | P a g e

Trenching continues along the entire 8.1km strike length of the Luanga deposit, with work finalizing the Central Sector

and progressing to completion in the Southwest Sector.

Figure 2: Central Sector (Section 1 on Figure 3) – Trenching showing the extent of surface mineralization in comparison to drilling below.

The same sampling, assay laboratory procedures and QAQC protocols as applied to drill core sampling are applied to

trench samples.

Luanga Drilling & Trenching Status

A total of 332 drill holes have been completed by Bravo to date, for 70,577.75 metres, including eight metallurgical

holes (not subject to routine assaying). Results have been reported for 267 Bravo drill holes to date. Assay results

for 57 Bravo drill holes that have been completed are currently outstanding (excluding the metallurgical holes). A

total of 37 trenches have been completed to date (for 7,623.08 metres), with results for 3 6 trenches reported and

results for 1 trench pending.

NEWS RELEASE

16 October 2024

4 | P a g e

T5 Target – Exploration Update

Drilling continues at the T5 target, located 1km east of the Luanga PGM+Au Deposit. Assays are pending for drill holes

DDH2405T012, 013, 014, 015, 016, and 017, all of which have intersected copper sulphide mineralization on the

eastern end of T5.

Complete Table of Recent Intercepts - Trenching

TRENCH-ID From

(m)

To

(m)

Thickness

(m)

Pd

(g/t)

Pt

(g/t)

Rh

(g/t) Au (g/t) PGM + Au

(g/t) TYPE

TRC24LU030 8.00 15.00 7.00 0.49 0.18 0.01 0.07 0.74 Ox

And 22.65 34.65 12.00 0.56 0.17 0.01 0.11 0.85 Ox

And 51.25 249.45 198.20 0.48 0.22 0.03 0.08 0.81 Ox

Including 159.45 328.20 68.75 0.24 0.22 0.01 0.01 0.48 Ox

TRC24LU031A 36.10 51.50 15.40 0.48 0.19 <0.01 0.29 0.97 Ox

And 127.00 133.00 6.00 0.30 0.13 0.08 0.11 0.62 Ox

TRC24LU031B 0.00 4.50 4.50 0.34 0.15 0.07 0.27 0.83 Ox

And 17.40 129.75 112.35 0.69 0.40 0.03 0.07 1.19 Ox

Including 39.50 56.10 16.60 1.79 0.70 0.12 0.16 2.76 Ox

And 135.75 171.40 35.65 0.23 0.38 0.04 0.03 0.68 Ox

And 182.40 205.40 23.00 0.24 0.64 0.03 0.01 0.92 Ox

TRC24LU032 88.20 91.20 3.00 0.63 0.34 <0.01 0.06 1.03 Ox

And 124.60 141.60 17.00 0.32 0.10 0.01 0.12 0.54 Ox

And 145.6 149.60 4.00 0.50 0.22 0.03 0.04 0.79 Ox

And ’65.60 199.30 33.70 0.55 0.22 0.04 0.12 0.93 Ox

And 216.30 329.85 113.55 0.69 0.38 0.02 0.02 1.12 Ox

TRC24LU035 86.10 100.60 14.50 0.24 0.13 0.02 0.12 0.51 Ox

And 108.60 112.60 4.00 0.21 0.12 0.02 0.05 0.40 Ox

And 116.05 135.75 19.70 0.41 0.18 0.02 0.02 0.62 Ox

And 139.75 178.95 39.20 0.61 0.22 0.02 0.01 0.86 Ox

TRC24LU036 No Significant Result

TRC24LU043 30.15 186.65 156.50 0.56 0.37 0.06 0.02 1.01 Ox

Including 38.00 43.00 5.00 2.87 2.00 0.28 0.09 5.24 Ox

TRC23LU044 8.60 75.20 66.60 0.58 0.34 0.06 0.08 1.06 Ox

And 152.05 182.25 30.20 0.71 0.23 0.07 0.02 1.03 Ox

Notes: All ‘From’, ‘To’ depths, and ‘Thicknesses’ are along the topographic surface.

Type: Ox = Oxide. FR = Fresh Rock. Recovery methods and results will differ based on the type of mineralization.

NEWS RELEASE

16 October 2024

5 | P a g e

Figure 3: Location of Bravo Trenches and Section 1 Reported in this News Release

NEWS RELEASE

16 October 2024

6 | P a g e

About Bravo Mining Corp.

Bravo is a Canadian and Brazil-based mineral exploration and development company focused on advancing its PGM

and copper-gold Luanga Project in the world-class Carajás Mineral Province, Para State, Brazil.

Bravo is one of the most active explorers in Carajás. The team, comprising of local and international geologists, has

a proven track record of PGM, nickel, and copper discoveries in the region. They have successfully taken a past IOCG

greenfield project from discovery to development and production in the Carajás.

The Luanga Project is situated on mature freehold farming land and benefits from being located close to operating

mines and a mining-experienced workforce, with excellent access and proximity to existing infrastructure, including

road, rail, and hydro grid power. A fully funded +70,000m infill, step out and exploration drilling and trenching

program is well advanced for 2024. Bravo’s current Environmental, Social and Governance activities includes planting

more than 30,000 trees in and around the Project ar ea, hiring and contracting locally, and working to ensure

protection of the environment during its exploration activities.

Technical Disclosure

Technical information in this news release has been reviewed and approved by Simon Mottram, F.AusIMM (Fellow

Australia Institute of Mining and Metallurgy), President of Bravo Mining Corp. who serves as the Company’s “qualified

person” as defined in Nationa l Instrument 43 -101 Standards of Disclosure for Mineral Projects (“NI 43-101”). Mr.

Mottram has verified the technical data and opinions contained in this news release.

For further information about Bravo, please visit www.bravomining.com or contact:

Luis Azevedo, Chairman and CEO or

Alex Penha, EVP Corporate Development

T: +1-416-509-0583

[email protected]

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

NEWS RELEASE

16 October 2024

7 | P a g e

Forward Looking Statements

This news release contains forward -looking information which is not comprised of historical facts. Forward-looking

information is characterized by words such as “Expand”, “significant”, “greater”, “high-grade”, “validate”, “improve”,

“enrichment”, “ successful”, “ expansion”, “ clearer evidence ”, “ potential”, “ growth”, “aims”, “highlight”, “better ”,

variants of these words and other similar words, phrases, or statements that certain events or conditions “may”,

“should” or “will” occur. This news release contains forward-looking information pertaining to the Company’s ongoing

trenching program; the interpretation of the results of trench data, including that the mineralization thickens in the

saprolite, is locally supergene enriched , and the impact on future mineral resource estimates thereof; the potential

that similar thickening and supergene enrichment may be present along the entire strike length of the Luanga deposit

and the impact on mineral resource estimates thereafter; the potential future economics of the saprolite material,

including the recoverability of PGMs and Au therein; the results of planned additional trenching ; and the Company’s

plans in respect thereof. Forward-looking information involves risks, uncertainties and other factors that could cause

actual events, results, and opportunities to differ materially from those expressed or implied by such forward-looking

information. Factors that could cause actual results to differ materially from such forw ard-looking information

include, but are not limited to, unexpected results from exploration programs, changes in the state of equity and debt

markets, fluctuations in commodity prices, delays in obtaining required regulatory or governmental approvals,

environmental risks, limitations on insurance coverage; and other risks and uncertainties involved in the mineral

exploration and development industry. Forward-looking information in this news release is based on the opinions and

assumptions of management considered reasonable as of the date hereof, including, but not limited to results from

trenching reasonably reflect consistent zones of oxide mineralization and that future results from additional trenching

will continue to see similar b road distribution of oxides with higher grades that the current MRE ; that activities will

not be adversely disrupted or impeded by regulatory, political, community, economic, environmental and/or healthy

and safety risks; that the Luanga Project will not be mater ially affected by potential supply chain disruptions; and

general business and economic conditions will not change in a materially adverse manner. Although the Company

believes that the assumptions and factors used in preparing the forward-looking information in this news release are

reasonable, undue reliance should not be placed on such information. The Company disclaims any intention or

obligation to update or revise any forward-looking information, other than as required by applicable securities laws.

NEWS RELEASE

16 October 2024

8 | P a g e

Schedule 1: Trench Location Details

HOLE-ID Company East (m) North (m) RL (m) Datum Length

(m) Azimuth Dip Sector

TRC23LU030 Bravo 658585.030 9340680.410 329.000 SIRGAS2000_UTM_22S 330.45 330.00 0.00 Central

TRC24LU031A Bravo 658492.930 9340644.180 284.250 SIRGAS2000_UTM_22S 133.00 330.00 0.00 Central

TRC24LU031B Bravo 658429.546 9340753.902 257.074 SIRGAS2000_UTM_22S 205.40 330.00 0.00 Central

TRC24LU032 Bravo 658455.671 9340506.294 284.139 SIRGAS2000_UTM_22S 382.95 330.00 0.00 Central

TRC24LU035 Bravo 658191.791 9340365.885 249.945 SIRGAS2000_UTM_22S 257.45 330.00 0.00 Central

TRC24LU036 Bravo 658080.962 9340321.578 251.552 SIRGAS2000_UTM_22S 215.70 330.00 0.00 Central

TRC24LU043 Bravo 659850.135 9342569.586 278.419 SIRGAS2000_UTM_22S 186.65 90.00 0.00 North

TRC24LU044 Bravo 659823.827 9342659.840 272.184 SIRGAS2000_UTM_22S 199.35 90.00 0.00 North

Schedule 2: Assay Methodologies and QAQC

Samples follow a chain of custody between collection, processing, and delivery to the SGS laboratory in Parauapebas,

state of Par á, Brazil. The drill core is delivered to the core shack at Bravo’s Luanga site facilities and processed by

geologists who insert certified reference materials, blanks, and duplicates into the sampling sequence. Drill core is

half cut and placed in secured polyurethane bags, then in security-sealed sacks before being delivered directly from

the Luanga site facilities to the Parauapebas SGS laboratory by Bravo staff. Additional information about the

methodology can be found on the SGS Geosol website ( SGS) in their analytical guides. Information regarding

preparation and analysis of historic drill core is also presented in the table below, where the information is known.

Quality Assurance and Quality Control (“QAQC”) is maintained internally at the lab through rigorous use of internal

certified reference materials, blanks, and duplicates. An additional QAQC program is administered by Bravo using

certified reference materials, duplicate samples and blank samples that are blindly inserted into the sample batch. If

a QAQC sample returns an unacceptable value an investigation into the results is triggered and when deemed

necessary, the samples that were tested in the batch with the failed QAQC sample are re-tested.

Bravo SGS Geosol

Preparation Method Method Method

For All Elements Pt, Pd, Au Rh Trace Elements

PRPCLI (85% at 200#) FAI515 FAI30V ICP40B