Damara Gold Expands Soil Anomaly with up to 18.1 g/t Au and 52.1 g/t Ag in soil and Sees Potential Bulk Tonnage Style Mineralization at Kodiak Zone
335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2
Phone: (250) 717-3151 • Fax: (250) 717-1845 • www.damaragoldcorp.com
NEWS RELEASE
Damara Gold Expands Soil Anomaly with up to 18.1 g/t Au and 52.1 g/t Ag in soil
and Sees Potential Bulk Tonnage Style Mineralization at Kodiak Zone
December 2, 2021 TSX-V: DMR
DAMARA GOLD CORP. (TSX-V:DMR) (“Damara” or the “Company”) is pleased to announce
the Phase II soil sampling at the Kodiak Zone ha s expanded the size of the anomaly to 400
meters in width and 1.2 kilometers in length, with individual soil samples grading up to 18,067
ppb (18.067 g/t) gold and 52.1 g/t silver on its Placer Mountain Project south of Princeton,
BC (“Placer Mountain” or the “Property”). Preliminary trenches excavated within part of
the zone have intersected a swarm of parallel quartz -sulfide veining within mineralized and
altered granite, suggesting the potential for a bulk-tonnage style system at the Kodiak Zone.
Trench TR-03 returned 0.70 g/t gold across 44.5 meters at its southeastern half, and higher-
grade sub-intervals included a 20 cm quartz -sulfide vein grading 29.30 g/t gold and 78.40
g/t silver. The maiden trenches have tested 130 meters of the 400 meters width and 180
meters of the 1.2-kilometer length of the soil anomaly.
Kodiak Zone Soil Anomaly Greatly Expanded
The Phase II soil sa mpling consisted of 660 samples collected in October of this year, with
values ranging from below detection up to 18,067 ppb gold and 52.1 ppm silver. The east-
northeast trending anomaly is 400 meters in width across the slope , which has only been
partially tested by trenching. The length of the anomaly spans 1.2 kilometers with the western
end continuing up the opposing side of the valley . On its eastern end, t he anomaly trends
underneath post -mineral volcanic cover rocks . The logging road across the center of the
anomaly will be used to collar drill holes planned for the current program.
Orange iron oxide staining in logging road cuts within the Kodiak correlate s well with
anomalous gold -in-soil values. The Company is investigating the use of h igh-resolution
satellite imagery to identify further areas of elevated iron oxides within logging road cuts
across the Property, to aid in the planning of a 2022 soil sampling grid.
Trenching Results Indicate Potential for Both High -Grade and Bulk Tonnage Style
Mineralization within the Kodiak Zone
The maiden trenching program at the Kodiak Zone, consisting of 110 continuous chip samples
along a combined total of 322 meters in 4 separate trenches, was carried out across a flat
and easily accessible logging road located at the north end of the soil anomaly . The
southeastern half of Trench TR-03 ended in mineralization and returned 44.5 meters of 0.70
g/t gold and 1.53 g/t silver associated with a series of quartz -sulfide veins crosscutting iron
oxidized and altered granite , suggesting the potential for bulk tonnage style mineralization .
The zones of mineralization, alteration and veining within the granite are spatially associated
335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2
Phone: (250) 717-3151 • Fax: (250) 717-1845 • www.damaragoldcorp.com
with small felsic intrusive dykes ranging in width from 3- 30 cm. Higher grade subintervals
within TR-03 include a 20 cm quartz sulfide vein grading 29.3 g/t gold and 78.4 g/t silver.
Trench TR-01 to the southwest intersected 8 meters of 2.56 g/t gold and 8.34 g/t silver
including 0.5 meters of 31.2 g/t gold and 99.4 g/t silver.
Trench TR-02, the furthest southwest, intersected 4 meters of 3.0 g/t gold and 9.7 g/t silver.
335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2
Phone: (250) 717-3151 • Fax: (250) 717-1845 • www.damaragoldcorp.com
Table 1 – Select Results from Preliminary Trenching Program at the Kodiak Zone
Trench From (m) To (m) Length (m) Au (g/t) Ag (g/t)
TR-01 20 28 8 2.56 8.34
including 27.5 28 0.5 31.20 99.40
and 65.5 68.5 3 3.56 6.70
and 126 126.5 0.5 2.32 7.40
TR-02 12 28 16 0.42 1.53
including 12 13 1 3.80 12.20
and 58 62 4 3.00 9.70
TR-03 9 12 3 1.03 1.70
and 40.5 85 44.5 0.70 1.53
including 40.5 49 8.5 2.36 4.17
including 47.5 49 1.5 9.40 18.70
including 78.8 79 0.2 29.30 78.40
The intervals reported in these tables represent trench intercepts and insufficient data are
available at this time to state the true thickness of the mineralized intervals.
335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2
Phone: (250) 717-3151 • Fax: (250) 717-1845 • www.damaragoldcorp.com
Drill Program Update
Drilling on Placer Mountain is progressing at a rapid pace, despite setbacks due to the recent
extreme weather conditions in Southern British Columbia. Some 1,169 meters of drilling have
been completed in 10 holes, covering approximately 400 meters of strike along the Main
Zone, a substantial increase to the strike length tested in 2020. The 2021 program has also
led to a greater understanding of the geology and controls to mineralization at the Main Zone.
Longer drill holes resulted in the intersection of additional veins within the zone as well. The
drill rig has now moved to the Kodiak Zone, having successfully completed all the planned
holes at the Main Zone.
There remains a backlog on cutting and sampling of the core due to the rapid pace of the
drilling as well as disruptions from flooding in the local town of Princeton, however the
Company remains on track to have all the core cut , sampled and in the lab by the holiday
break.
335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2
Phone: (250) 717-3151 • Fax: (250) 717-1845 • www.damaragoldcorp.com
Larry Nagy, CEO, commented “We are very pleased with the progress we’ve made so far with
the program and the quality of the Full Force Drilling crew. Production has been good, and a
significant amount of strike has been covered along the veining system at the Main Zone. We
are excited to have th e drill now mobilized at the Kodiak Zone, which has shaped up as a
prime target area. The trenching and the phase II soil results are very encouraging and
demonstrate a more robust gold anomaly than that at the Main Zone. We are very optimistic
for the holes we have planned to test the zone’s 400-meter width.”
Qualified Person
Dr. Gerald G. Carlson, PhD, PEng, technical advisor to the Company, is the Qualified Person
as defined by National Instrument 43-101 who has reviewed and approved the technical data
in this report.
About Damara
Damara Gold Corp. is a TSX Venture listed Canadian public company with a Board of Directors
seasoned in the mineral exploration industry with extensive and successful international
experience with a focus on identifying and acquiring prospective and under -explored gold
properties worldwide.
ON BEHALF OF THE BOARD OF DIRECTORS OF DAMARA
“Larry Nagy”
Larry Nagy, Chief Executive Officer
For additional information visit Damara’s website at www.damaragoldcorp.com or contact:
Damara Gold Corp.
Larry Nagy
Chief Executive Officer or
Terese Gieselman
Chief Financial Officer
Ph: (250-717-1840)
Disclaimer for Forward-Looking Information
This news release contains statements that constitute "forward -looking Information", as such term is
used in applicable Canadian securities laws. Such forward -looking information involves known and
unknown risks, uncertainties and other factors that may cause the C ompany’s actual results,
performance or achievements, or developments in the industry to differ materially from the anticipated
results, performance or achievements expressed or implied by such forward- looking information.
Forward-looking information includes statements that are not historical facts and are generally, but not
always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates,"
"projects," "potential" and similar expressions, or that events or conditions "will," "would," "may,"
"could" or "should" occur.
Although the Company believes the forward -looking information contained in this news release is
reasonable based on information available on the date hereof, by its nature forward-looking information
involves assumptions and known and unknown risks, uncertainties and other factors which may cause
our actual results, level of activity, performance or achievements, or other future events, to be materially
335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2
Phone: (250) 717-3151 • Fax: (250) 717-1845 • www.damaragoldcorp.com
different from any future results, performance or achievements expressed or implied by such forward-
looking information.
Examples of such assumptions, risks and uncertainties include, without limitation, assumptions, risks
and uncertainties associated with general economic conditions; the Covid -19 pandemic; adverse
industry events; the receipt of required regulatory approvals and the timing of such approvals; that the
Company maintains good relationships with the communities in which it operates or proposes to operate,
future legislative and regulatory develo pments in the mining sector; the Company ’s ability to access
sufficient capital from internal and external sources, and/or inability to access sufficient capital on
favorable terms; mining industry and markets in Canada and generally; the ability of the Co mpany to
implement its business strategies; competition; the risk that any of the assumptions prove not to be
valid or reliable, which could result in delays, or cessation in planned work, risks associated with the
interpretation of data, the geology, grade and continuity of mineral deposits, the possibility that results
will not be consistent with the Company’s expectations, as well as other assumptions risks and
uncertainties applicable to mineral exploration and development activities and to the Company, including
as set forth in the Company’s public disclosure documents filed on the SEDAR website at
www.sedar.com.
THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS PRESS RELEASE REPRESENTS
THE EXPECTATIONS OF DAMARA AS OF THE DATE OF THIS PRESS RELEASE AND,
ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE
UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON
THIS INFORMATION AS OF ANY OTHER DATE. WHILE DAMARA MAY EL ECT TO, IT DOES NOT
UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS
REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the
policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press
release.