Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BRON.V ·

Damara Gold Discovers New Zone, Completes Trenching and Commences Core Drilling on Placer Mountain

Drill Results Exploration Programs

335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2

Phone: (250) 717-3151 • Fax: (250) 717-1845 • www.damaragoldcorp.com

NEWS RELEASE

Damara Gold Discovers New Zone, Completes Trenching and Commences Core

Drilling on Placer Mountain

November 19, 2021 TSX-V: DMR

DAMARA GOLD CORP. (TSX-V:DMR) (“Damara” or the “Company”) is pleased to announce

it has discovered a new zone of mineralized quartz veins, completed mechanized trenching

and commenced core drilling on its Placer Mountain Project south of Princeton, BC (“Placer

Mountain” or the “Property”).

Trenching Completed at the New Kodiak Zone Discovery

The Company has now completed a mechanized trenching program consisting of the collection

of 110 continuous chip samples from a combined total of 322 meters in 4 separate trenches

across the newly discovered Kodiak Vein Zone. Mineralized quartz veins were intersected on

the western end of Trenches 1, 2 and the eastern end of Trench 3. Bedrock exposure in Trench

4 was limited to one short section due to deep overburden and did not adequately test the

strike extension of the vein system. The series of veins intersected are closely spaced,

typically 10-50 cm in width and spatially associated with narr ow felsic dykes within granitic

intrusive rocks. The veins display stronger sulfide mineralization and wider alteration halo’s

than is observed at the Main Zone. Assays remain pending for all trench samples.

Grab Samples Confirm Presence of Gold-Silver Mineralization

Rush assays from 10 selected float grab samples collected by soil samplers at the new Kodiak

Zone ranged from below detection up to 70.6 g/t gold and 244 g/t silver . The grab

samples were collected from two separate areas. One a rea is 750 meters southwest along

trend of the Kodiak Zone veins and the other is 200 meters south-southeast, on a possible

separate trend. Neither area has yet had follow up trenching. The Company awaits analytical

results for both the trench samples as w ell as 660 infill and extension soil samples collected

during the Phase II program. The results will be used to design a follow up program of maiden

core drilling this year as well as further soil sampling, trenching, ground geophysics in 2022.

Photographs of the quartz-pyrite veining intersected by trenching as well as selected grab

samples collected at the Kodiak Zone can be found at the following link:

https://www.damaragoldcorp.com/2021_exploration_program_gallery2-389229.html

2,000-meter 2021 Drill Program Underway

The Company also announces that is has contracted Full Force Drilling of Peachland, BC to

mobilize a skid-mounted Zinex A5 core drill to the Property to begin drilling at the Main Zone.

335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2

Phone: (250) 717-3151 • Fax: (250) 717-1845 • www.damaragoldcorp.com

Approximately 1,000 meters of drilling in at least 10 holes will be carried out along strike of

the 2020 drilling at the Main Zone. One long hole will test both the Main Vein as well as an

SGH gold anomaly from sampling completed in June of this year. One hole on a large stepout

to the northeast will test a strong chargeability anomaly from the 2020 IP survey.

The geology at the Main Zone consists of Triassic Nicola Group sedimentary and volcanic rocks

which are intruded by granodiorite dykes at the eastern end. Trenching at the Main Zone in

2018 and 2019 demonstrated that the Main Vein horsetails into a series of stringer zones as

it enters the granodiorite intrusion to the east. Post -mineral Princeton Group rocks cover

mineralization to the east and the underlying geology will be tested with core drilling this

year.

Approximately 1,000 meters of drilling is also slated for the new Kodiak Zone trenching

discovery. Once all assays have been received, the Company will issue a press release

detailing those results as well as a finalized drill plan for the Kodiak Zone.

335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2

Phone: (250) 717-3151 • Fax: (250) 717-1845 • www.damaragoldcorp.com

Larry Nagy, CEO, commented “We are very excited to be drilling again at Placer Mountain and

testing the along strike extensions of the Main Vein we intersected last Winter. We eagerly

await analytical results on the new Kodiak Zone, which will provide us with a second majo r

target to test this year. The recently flooding has unfortunately had a devastating effect on

the nearby town of Princeton, and we are working closely with local suppliers and contractors

to ensure everyone’s well-being and safety during these difficult times.”

Qualified Person

Dr. Gerald G. Carlson, PhD, PEng, technical advisor to the Company, is the Qualified Person

as defined by National Instrument 43-101 who has reviewed and approved the technical data

in this report.

About Damara

Damara Gold Corp. is a TSX Venture listed Canadian public company with a Board of Directors

seasoned in the mineral exploration industry with extensive and successful international

experience with a focus on identifying and acquiring prospective and under -explored gold

335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2

Phone: (250) 717-3151 • Fax: (250) 717-1845 • www.damaragoldcorp.com

properties worldwide.

ON BEHALF OF THE BOARD OF DIRECTORS OF DAMARA

“Larry Nagy”

Larry Nagy, Chief Executive Officer

For additional information visit Damara’s website at www.damaragoldcorp.com or contact:

Damara Gold Corp.

Larry Nagy

Chief Executive Officer or

Terese Gieselman

Chief Financial Officer

Ph: (250-717-1840)

Disclaimer for Forward-Looking Information

This news release contains statements that constitute "forward -looking Information", as such term is

used in applicable Canadian securities laws . Such forward -looking information involves known and

unknown risks, uncertainties and other factors that may cause the C ompany’s actual results,

performance or achievements, or developments in the industry to differ materially from the anticipated

results, performance or achievements expressed or implied by such forward -looking information.

Forward-looking information includes statements that are not historical facts and are generally, but not

always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates,"

"projects," "potential" and similar expressions, or that events or conditions "wi ll," "would," "may,"

"could" or "should" occur.

Although the Company believes the forward -looking information contained in this news release is

reasonable based on information available on the date hereof, by its nature forward-looking information

involves assumptions and known and unknown risks, uncertainties and other factors which may cause

our actual results, level of activity, performance or achievements, or other future events, to be materially

different from any future results, performance or achievements expressed or implied by such forward -

looking information.

Examples of such assumptions, risks and uncertainties include, without limitation, assumptions, risks

and uncertainties associated with general economic conditions; the C ovid-19 pandemic; adverse

industry events; the receipt of required regulatory approvals and the timing of such approvals; that the

Company maintains good relationships with the communities in which it operates or proposes to operate,

future legislative and regulatory developments in the mining sector; the Company ’s ability to access

sufficient capital from internal and external sources, and/or inability to access sufficient capital on

favorable terms; mining industry and markets in Canada and generally; the ability of the Company to

implement its business strategies; competition; the risk that any of the assumptions prove not to be

valid or reliable, which could result in delays, or cessation in planned work, risks associated with the

interpretation of data, the geology, grade and continuity of mineral deposits, the possibility that results

will not be consistent with the Company’s expectations, as well as other assumptions risks and

uncertainties applicable to mineral exploration and development activities and to the Company, including

as set forth in the Company’s public disclosure documents filed on the SEDAR website at

www.sedar.com.

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS PRESS RELEASE REPRESENTS

THE EXPECT ATIONS OF DAMARA AS OF THE DATE OF THIS PRESS RELEASE AND,

ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE

UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON

335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2

Phone: (250) 717-3151 • Fax: (250) 717-1845 • www.damaragoldcorp.com

THIS INFORMATION AS OF ANY OTHER DATE. WHILE DAM ARA MAY ELECT TO, IT DOES NOT

UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS

REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press

release.