Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BRON.V ·

Damara Gold Continues to Intersect High Grade Gold in First Six 2021 Drill Holes at Placer Mountain, Including 1.40 Metres of 34.12 g/t Au and 87.74 g/t Ag

Drill Results

335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2

Phone: (250) 717-1840 • www.damaragoldcorp.com

NEWS RELEASE

Damara Gold Continues to Intersect High Grade Gold in First Six 2021 Drill Holes

at Placer Mountain, Including 1.40 Metres of 34.12 g/t Au and 87.74 g/t Ag

March 8, 2022 TSX-V: DMR

DAMARA GOLD CORP. (TSX-V:DMR) (“Damara” or the “Company”) is pleased to report that

it’s 2021 drill program has successfully extended gold mineralization at the Main Vein, which

continues to remain open to the west, with drill hole MV-21-06 intersecting 1.40 meters of

34.12 g/t Au and 87.74 g/t Ag on its Placer Mountain Project south of Princeton, BC (“Placer

Mountain” or the “Property”). This news release reports the first 6 of 18 drill holes

completed during the 2021 program. The 2021 drill program successfully extended high grade

intercepts from the 2020 maiden drill program, including 1.0 m of 48.60 g/t Au and 30.80 g/t

Ag (See April 5, 2021 News Release) and highlights the potential for a large scale orogenic

gold system at Placer Mountain. The intersection of high -grade gold in MV -21-06 indicates

significant expansion potential even further to the west, as the gold system now extends into

areas previously untouched, due to thick overburden cover. Following this second phase drill

program, the pr esence of a strong orogenic gold system is becoming apparent at Placer

Mountain.

Assays also remain pending for the remainder of the Main Zone as well as 8 maiden holes

drilled at the new Kodiak Zone , which was discovered during a 2021 soil sampling and

trenching program earlier this year . The drilling at Kodiak intersected strong veining and

sulfide mineralization, with broad alteration halos , similar to that encountered in the Fall

program (See news release December 2, 2021).

Main Vein Expanded; Remains Open Along Strike and at Depth

All holes within the Main Zone have intersected the Main Vein, with the exception of MV -21-

04, which was terminated short of the vein due to drilling difficulties associated with the recent

flooding events in Princeton and MV-21-05 which was collared just south of the vein, which is

covered by thick overburden at surface. The Main Vein has now been traced in drill core for a

total strike length of 385 meters (Figure 1). The Company has noted strong similarities to the

drilling at Gold Mountain Mining Corp ’s. Elk Deposit 1, which recently began commercial

production on a similar style orogenic gold system, just 76 km to the north of Placer Mountain.

The Elk Deposit, which is defined by approximately 50,000 meters of drilling in 973 drill holes,

is centered along the contact of Nicola Group rocks with the Jurassic Osprey Lake Batholith ,

in a geological setting that is very similar to that at Placer Mountain.

1This news release contains information about adjacent properties on which Damara has no right to explore or mine. Readers are cautioned

that mineral deposits on adjacent properties are not indicative of mineral deposits on the Company’s properties

335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2

Phone: (250) 717-1840 • www.damaragoldcorp.com

Table 1 - Select Intercepts from Main Vein

Hole From (m) To (m) Length (m)* Au (g/t) Ag (g/t)

MV-21-01 36.25 38.00 1.75 3.67 34.10

And 62.50 63.00 0.50 3.12 11.40

And 92.00 92.50 0.50 1.82 9.00

And 162.00 162.50 0.50 1.93 9.40

MV-21-02 48.50 49.40 0.90 19.80 83.00

And 58.90 63.00 4.10 1.93 15.90

MV-21-03 6.15 9.00 2.85 0.40 2.22

MV-21-04 16.50 2.05 4.00 0.49 11.36

MV-21-05 12.00 14.50 2.50 0.27 36.42

MV-21-06 62.80 64.25 1.45 34.12 87.74

*The intervals reported in these tables represent drill intercepts and insufficient data are available at this time to state the true

thickness of the mineralized intervals. All gold values are uncut.

335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2

Phone: (250) 717-1840 • www.damaragoldcorp.com

335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2

Phone: (250) 717-1840 • www.damaragoldcorp.com

335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2

Phone: (250) 717-1840 • www.damaragoldcorp.com

Awaiting Kodiak Zone Assays

The Company is currently awaiting assays from the second half of the 2021 drill program at

the new Kodiak Zone, which intersected strong veining and sulfide mineralization, with broad

alteration halos, similar to that encountered in the Company’s Fall trenching program, as well

as assays from the remaining 4 Main Zone drill holes. The Company’s soil sampling program

at Kodiak revealed a 1.5 kilometer long gold in soil anomaly which remains largely untested

and open to the east under post -mineral volcanic cover (See December 2, 2021 News

Release). Eight short holes were drilled at the Kodiak Zone in 2021, testing just a small portion

of the anomaly which was easily accessible for winter drilling.

Additional Staking to the North

The Company has also staked an additional 1,200 h ectares of mineral claims in further

prospective ground to the north of Placer Mountain. The Company plans to utilize this new

ground to continue its soil sampling and prospecting campaigns along the important intrusive–

volcanic contact.

Larry Nagy, CEO, commented “ We are very pleased with our continued success at Placer

Mountain, which highlights the scale of a potentially large orogenic gold system at the project.

The 2021 drill results have successfully extended the strike length of the Main Vein, including

high grade gold intersected in hole 6, where previous was not able to reach bedrock. We are

encouraged to see strong gold mineralization, which remains open to the west as we continue

to extend the strike length of the Main Vein. Given the scale of the system we have uncovered

with only 2,400m of drilling to date, we expect 2022 to continue delivering exciting results.”

Qualified Person

Dr. Gerald G. Carlson, PhD, PEng, technical advisor to the Company, is the Qualified Person

as defined by National Instrument 43-101 who has reviewed and approved the technical data

in this report.

About Damara

Damara Gold Corp. is a TSX Venture listed Canadian public company with a Board of Directors

seasoned in the mineral exploration industry with extensive and successful international

experience with a focus on identifying and acquiring prospective and under -explored gold

properties worldwide.

ON BEHALF OF THE BOARD OF DIRECTORS OF DAMARA

“Larry Nagy”

Larry Nagy, Chief Executive Officer

For additional information visit Damara’s website at www.damaragoldcorp.com or contact:

335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2

Phone: (250) 717-1840 • www.damaragoldcorp.com

Damara Gold Corp.

Larry Nagy

Chief Executive Officer or

Terese Gieselman

Chief Financial Officer

Ph: (250-717-1840)

Disclaimer for Forward-Looking Information

This news release contains statements that constitute "forward-looking Information", as such term is

used in applicable Canadian securities laws . Such forward -looking information involves known and

unknown risks, uncertainties and other factors that may cause the Company’s actual results,

performance or achievements, or developments in the industry to differ materially from the anticipated

results, performance or achievements expressed or implied by such forward -looking information.

Forward-looking information includes statements that are not historical facts and are generally, but not

always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates,"

"projects," "potential" and similar expressions, or that events or conditions "will," "would," "may,"

"could" or "should" occur.

Although the Company believes the forward -looking information contained in this news release is

reasonable based on information available on the date hereof, by its nature forward-looking information

involves assumptions and known and unknown risks, uncertainties and other factors which may cause

our actual results, level of activity, performance or achievements, or other future events, to be materially

different from any future results, performance or achievements expressed or implied by such forward -

looking information.

Examples of such assumptions, risks and uncertainties include, without limitation, assumptions, risks

and uncertainties associated with general economic conditions; the Covid -19 pandemic; adverse

industry events; the receipt of required regulatory approvals and the timing of such approvals; that the

Company maintains good relationships with the communities in which it operates or proposes to operate,

future legislative and regulatory developments in the mining sector; the Company ’s ability to access

sufficient capital from internal and external sources, and/or inability to access sufficient capital on

favorable terms; mining industry and markets in Canada and generally; the ability of the Company to

implement its business strategies; competition; the risk that any of the assumptions prove not to be

valid or reliable, which could result in delays, or cessation in planned work, risks associated with the

interpretation of data, the geology, grade and continuity of mineral deposits, the possibility that results

will not be consistent with the Company’s expectations, as well as other assumptions risks and

uncertainties applicable to mineral exploration and development activities and to the Company, including

as set forth in the Company’s pub lic disclosure documents filed on the SEDAR website at

www.sedar.com.

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS PRESS RELEASE REPRESENTS

THE EXPECTATIONS OF DAMARA AS OF THE DATE OF THIS PRESS RELEASE AND,

ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE

UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON

THIS INFORMATION AS OF ANY OTHER DATE. WHILE DAMARA MAY ELECT TO, IT DOES NOT

UNDERTAKE TO UPDATE THIS INFO RMATION AT ANY PARTICULAR TIME EXCEPT AS

REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press

release.