Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BRON.V ·

Damara Gold Completes Phase II Soil Sampling and Commences Trenching on Placer Mountain.

Exploration Programs

335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2

Phone: (250) 717-3151 • Fax: (250) 717-1845 • www.damaragoldcorp.com

NEWS RELEASE

Damara Gold Completes Phase II Soil Sampling and Commences Trenching on

Placer Mountain.

October 15, 2021 TSX-V: DMR

DAMARA GOLD CORP. (TSX-V:DMR) (“Damara” or the “Company”) is pleased to announce

it has completed a Phase II soil sampling program and commenced mechanized trenching on

its Placer Mountain Project (“Placer Mountain ” or the “Property”) located south of

Princeton, British Columbia.

The Phase II exploration program consisted of the collection of 660 soil samples on a 25m x

25m grid and was directed at infilling and extending a large new gold-in-soil anomaly located

2.5 kilometers northeast of the Main Vein. During the program, soil samplers identified

abundant sulfide-mineralized and oxidized quartz -limonite vein float and granodiorite float

within the new anomaly, along a short logging road that cuts a portion of the anomaly. The

area is underlain by a granodiorite intrusion, which is a different geology to the volcanics

which host the Main Vein. The soils along the short logging road are a gossanous bright orange

colour which suggests the presence of oxidized sulfides. The trenching is focused along this

stretch of road, with the aim of uncovering the source of the quartz -sulfide-limonite float

boulders and a possible orientation of any underlying veins. Photographs of the rock samples

collected within the new anomaly, as well as a separate multi -element anomaly to the

northwest which is underlain by pyritic black shales can be found at the following link:

https://www.damaragoldcorp.com/2021_exploration_program_gallery.html

2021 Drill Program Planning

The aim of the trenching program will be to help locate several planned drill holes to test the

new gold-in-soil anomaly. T he upcoming drill program, which is expected to commence in

November, will test at least 4 separate target areas, including extensions of the Main Vein in

both directions, the parallel SGH gold anomaly, and the new soil anomaly discussed above.

Larry Nagy, CEO, commented “We are very pleased with the progress the Company has made

on Placer Mountain this season and are looking forward to our upcoming drill program. In

addition to testing the Main Vein along strike in both directions, this summer’s field work has

generated two additional high -quality targets, both of which we are very excited to test as

well. The Property’s location allows for late season drilling with results throughout the winter

months, which will allow an early start to drilling the following field season.”

Qualified Person

Dr. Gerald G. Carlson, PhD, PEng, technical advisor to the Company, is the Qual ified Person

as defined by National Instrument 43-101 who has reviewed and approved the technical data

in this report.

335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2

Phone: (250) 717-3151 • Fax: (250) 717-1845 • www.damaragoldcorp.com

About Damara

Damara Gold Corp. is a TSX Venture listed Canadian public company with a Board of Directors

seasoned in the mineral exploration industry with extensive and successful international

experience with a focus on identifying and acquiring prospective and under -explored gold

properties worldwide.

ON BEHALF OF THE BOARD OF DIRECTORS OF DAMARA

“Larry Nagy”

Larry Nagy, Chief Executive Officer

For additional information visit Damara’s website at www.damaragoldcorp.com or contact:

Damara Gold Corp.

Larry Nagy

Chief Executive Officer or

Terese Gieselman

Chief Financial Officer

Ph: (250-717-1840)

Disclaimer for Forward-Looking Information

This news release contains statements that constitute "forward -looking Information", as such term is

used in applicable Canadian securities laws . Such forward -looking information involves known and

unknown risks, uncertainties and other factors that may cause the C ompany’s actual results,

performance or achievements, or developments in the industry to differ materially from the anticipated

results, performance or achievements expressed or implied by such forward -looking information.

Forward-looking information includes statements that are not historical facts and are generally, but not

always, identified by the words "expects," "plans," "anticipates," "believes," "intends," "estimates,"

"projects," "potential" and similar expressions, or that events or conditions "wi ll," "would," "may,"

"could" or "should" occur.

Although the Company believes the forward -looking information contained in this news release is

reasonable based on information available on the date hereof, by its nature forward-looking information

involves assumptions and known and unknown risks, uncertainties and other factors which may cause

our actual results, level of activity, performance or achievements, or other future events, to be materially

different from any future results, performance or achie vements expressed or implied by such forward-

looking information.

Examples of such assumptions, risks and uncertainties include, without limitation, assumptions, risks

and uncertainties associated with general economic conditions; the Covid -19 pandemic; adverse

industry events; the receipt of required regulatory approvals and the timing of such approvals; that the

Company maintains good relationships with the communities in which it operates or proposes to operate,

future legislative and regulat ory developments in the mining sector; the Company ’s ability to access

sufficient capital from internal and external sources, and/or inability to access sufficient capital on

favorable terms; mining industry and markets in Canada and generally; the ability of the Company to

implement its business strategies; competition; the risk that any of the assumptions prove not to be

valid or reliable, which could result in delays, or cessation in planned work, risks associated with the

interpretation of data, the geology, grade and continuity of mineral deposits, the possibility that results

will not be consistent with the Company’s expectations, as well as other assumptions risks and

uncertainties applicable to mineral exploration and development activities and to the Company, including

335 – 1632 Dickson Avenue • Kelowna, BC V1Y 7T2

Phone: (250) 717-3151 • Fax: (250) 717-1845 • www.damaragoldcorp.com

as set forth in the Company’s public disclosure documents filed on the SEDAR website at

www.sedar.com.

THE FORWARD-LOOKING INFORMATION CONTAINED IN THIS PRESS RELEASE REPRESENTS

THE EXPECTATIONS O F DAMARA AS OF THE DATE OF THIS PRESS RELEASE AND,

ACCORDINGLY, IS SUBJECT TO CHANGE AFTER SUCH DATE. READERS SHOULD NOT PLACE

UNDUE IMPORTANCE ON FORWARD-LOOKING INFORMATION AND SHOULD NOT RELY UPON

THIS INFORMATION AS OF ANY OTHER DATE. WHILE DAMARA MAY ELECT TO, IT DOES NOT

UNDERTAKE TO UPDATE THIS INFORMATION AT ANY PARTICULAR TIME EXCEPT AS

REQUIRED IN ACCORDANCE WITH APPLICABLE LAWS.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press

release.