Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BRON.V ·

Bronco Resources Corporate Update and Exploration Plan

Exploration Programs

301 – 1665 Ellis Street • Kelowna, BC V1Y 7T2

www.broncoresources.com

NEWS RELEASE

Bronco Resources Corporate Update and Exploration Plan

November 21, 2024 TSX-V: BRON

BRONCO RESOURCES CORP. (TSX -V:BRON) ( “Bronco” or the “Company”) is pleased to

announce the following update on the Company’s Placer Mountain project in Southern BC

(“Placer Mountain” or the “Property”). It is nearly three years since the last drill program

at the Placer Mountain Gold Property, but the Company is now financed and has secured all

necessary approvals for a new 5 -year area-based exploration permit which will allow th e

Company to restart exploration. Work will be focused on diamond drilling to follow up on the

Kodiak Zone discovery made in late 2021 with intercepts in KZ-21-05 of 3 meters of 39.20

g/t Au & 80.4 g/t Ag (see Table 1)1.

Placer Mountain Property Highlights:

• 14,445-hectare land package containing numerous high potential exploration targets

including the Kodiak Zone and Main Vein which have been successfully tested with

limited diamond drilling.

• Kodiak Zone is a 1.5km long, high tenor gold-in-soil anomaly with logging road access

recently discovered in 2021 by the Company.

• Limited drilling in 2020 and 2021, totalling 2,428 meters, found gold mineralization in

all holes.

• Inaugural drill program on the Kodiak Zone discovered high grade intervals of 3.0m of

39.20 g/t Au and 80.40 g/t Ag in KZ-21-05 and 1.4m of 46.51 g/t Au and 32.2 g/t Ag

in KZ-21-02 (see Table 1) 1.

• Drilling in 2020 and 2021 on the Main Vein encountered high grade intervals of 1.0m

of 48.60 g/t Au and 30.80 g/t Ag in PG -20-001 and 1.5m of 34.12 g/t Au and 87.70

g/t Ag in MV-21-06 (see Table 2) 1.

1 The intervals reported in these tables represent drill intercepts and insufficient data are available at this time to state t he true

thickness of the mineralized intervals.

2 This news release contains information about adjacent properties on which Bronco does not have the right to explore or mine.

Investors are cautioned that mineral deposits on adjacent properties are not indicative of mineral deposits on the Company’s

properties.

301 – 1665 Ellis Street • Kelowna, BC V1Y 7T2

www.broncoresources.com

Table 1 – 2021 Kodiak Zone Drill Highlights1

Hole ID From (m) To (m) Interval (m) Au (g/t) Ag (g/t)

KZ-21-01 22.1 23.4 1.3 31.80 47.3

AND 82.3 82.6 0.3 3.30 7.7

AND 91.7 93.0 1.3 3.21 8.9

KZ-21-02 39.6 40.9 1.4 46.51 32.2

AND 47.3 47.6 0.4 1.04 3.1

KZ-21-03 32.3 32.6 0.3 0.53 2.1

KZ-21-04 35.7 36.0 0.3 1.46 5.9

KZ-21-05 27.0 30.5 3.0 39.20 80.4

incl. 28.0 29.0 1.0 87.50 169.0

KZ-21-06 21.0 22.1 1.1 0.96 8.4

KZ-21-07 64.7 65.0 0.3 1.11 2.3

KZ-21-08 45.4 45.8 0.4 17.40 77.5

AND 84.1 122.1 38.0 0.28 0.9

AND 139.4 150.3 10.9 0.23 0.8

301 – 1665 Ellis Street • Kelowna, BC V1Y 7T2

www.broncoresources.com

Table 2 – 2020 & 2021 Main Vein Drill Highlights1

The Placer Mountain Property is in south central British Columbia in a mineral district of

numerous past and current producing mines and advanced exploration projects (Figure 1).

The Placer Mountain Property is located 15km to the south of the HudBay Minerals producing

Copper Mountain Mine and Mill and 30km south of Princeton, British Columbia (Figure 2) 2.

The area has a long history of mining and services to compliment exploration operations. The

Property is located off Highway 3 and has a network of logging roads throughout the Property.

Hole ID From (m) To (m) Interval (m) Au (g/t) Ag (g/t)

PG-20-001 15.0 16.0 1.0 48.60 30.8

PG-20-003 57.0 61.5 4.5 2.60 25.9

PG-20-004 15.5 17.8 2.3 1.72 13.2

PG-20-005 29.0 33.0 4.0 7.07 101.0

PG-20-006 73.6 75.5 1.9 3.92 16.1

PG-20-007 17.0 18.0 1.0 2.12 14.6

PG-20-009 52.7 58.4 5.7 1.32 26.7

MV-21-01 36.3 38.0 1.8 3.67 34.1

And 62.5 63.0 0.5 3.12 11.4

And 92.0 92.5 0.5 1.82 9.0

And 162.0 162.5 0.5 1.93 9.4

MV-21-02 48.5 49.4 0.9 19.80 83.0

And 58.9 63.0 4.1 1.93 15.9

MV-21-03 6.2 9.0 2.9 0.40 2.2

MV-21-04 16.5 2.1 4.0 0.49 11.4

MV-21-05 12.0 14.5 2.5 0.27 36.4

MV-21-06 62.8 64.3 1.5 34.12 87.7

MV-21-07 86.8 87.3 0.5 8.92 28.5

AND 106.9 107.4 0.5 1.81 17.9

MV-21-08 86.2 86.5 0.3 3.69 33.6

AND 88.0 89.3 1.3 1.36 4.5

MV-21-09 76.4 77.0 0.6 3.29 3.6

301 – 1665 Ellis Street • Kelowna, BC V1Y 7T2

www.broncoresources.com

Figure 1 – South Central British Columbia Mineral District

301 – 1665 Ellis Street • Kelowna, BC V1Y 7T2

www.broncoresources.com

Figure 2 – Placer Mountain Property Overview

301 – 1665 Ellis Street • Kelowna, BC V1Y 7T2

www.broncoresources.com

Placer Mountain was first discovered in 2019 through prospecting and trenching of the Main

Vein. The inaugural drill ing on the Main Vein at Placer Mountain took place in 2020 and

consisted of 533 meters. The 2020 program was successful in delineating the Main Vein with

PG-20-001 grading 1.0 meter of 48.60 g/t Au and 30.8 g/t Ag (see Table 2) 1. This near

surface discovery hole exemplified the relatively untouched exploration potential of the Placer

Mountain Property.

In 2021 the Company conducted a large prospecting, geochemical sampling, and trenching

program discovering the Kodiak Zone approximately 2.5km northeast of the Main Vein (Figure

3). Soil sampling on the Kodiak Zone outlined a 1.5km in strike by 750 meters gold-in-soil

anomaly with values ranging from below detection to 18.1 g/t Au-in-soil, including 89 samples

above 50 ppb (Figure 4). Follow up trenching highlighted intervals of 44.50 meters of 0.70

g/t Au in TR -03 and 8.00 meters of 2.56 g/t Au in TR -01 demonstrating the bulk tonnage

potential of the Kodiak Zone . In 2021, 1,895m was drilled between the Kodiak Zone and

Main Vein. Drilling at the Kodiak Zone was severely impacted by atmospheric and large

storms causing significant delays and difficulties in operating the drill program. With limited

ability to move and position the drill the company was still able to intersect at the Kodiak

Zone discovered intercepts of 3 meters of 39.20 g/t Au and 80.40 g/t Ag in KZ-21-05 and 1.4

meters of 46.51 g/t Au and 32.2 g/t Ag in KZ -21-02 (see Table 1) 1. In effect only a small

portion of the Kodiak Zone 1.5km Au-in-soil anomaly has been drilled to date.

Bronco Resources is currently finalizing exploration plans and expects to be drilling by the end

of November 2024.

301 – 1665 Ellis Street • Kelowna, BC V1Y 7T2

www.broncoresources.com

Figure 3 – Kodiak Zone & Main Vein Au-in-Soil Geochemistry

301 – 1665 Ellis Street • Kelowna, BC V1Y 7T2

www.broncoresources.com

Figure 4 – Kodiak Zone 1.5km Au-in-Soil Anomaly & 2021 Drilling

CEO Comment

Corbin Stewart, CEO, commented “We are very excited to start the next stage of exploration

on the Placer Mountain Property. We will continue to build on the exploration successes since

the first discovery of the Main Vein in 2019. Placer Mountain is a unique property with the

combination of excellent access and essentially no historical exploration. Bronco will focus on

spending exploration dollars on drilling and boots on the ground exploration to continue to

advance the Placer Mountain Property. The 2024 will focus on testing the high-grade Kodiak

Zone with only 120 meters of the 1.5km gold-in-soil anomaly tested.”