Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BRC.V ·

Blackrock Silver Drills Multiple +1 kg/t AgEq Intercepts and Establishes Grade Continuity over 350 Metres in Final M&I Conversion Assays at Tonopah West Final Assay Results from the M&I Conversion Program Confirm High-Grade Continuity of Gold and Silver

Drill Results

Blackrock Silver Drills Multiple +1 kg/t AgEq

Intercepts and Establishes Grade Continuity

over 350 Metres in Final M&I Conversion

Assays at Tonopah West

Final Assay Results from the M&I Conversion Program

Confirm High-Grade Continuity of Gold and Silver

Mineralization over 350 Metres in the M&I Conversion Area

HIGHLIGHTS:

TXC25-139 cut 9.05 metres grading 367 grams per tonne (g/t)

silver equivalent (AgEq)

(182.8 g/t silver (Ag) & 2.04 g/t gold (Au)) from 187.5 metres, including 0.82 metres grading

2,886 g/t AgEq (1,411 g/t Ag & 16.13 g/t Au), Ag/Au ratio 90:1;

TXC25-150 drilled 2.84 metres grading 671.5 AgEq (367 g/t Ag & 3.41 g/t Au) from 162.3

metres, including 0.76 metres grading 1,554 g/t AgEq ( 819 g/t Ag & 8.14 g/t Au);

TXC25-146 intercepted 1.16 metres of 1,111 g/t AgEq (615 g/t Ag & 5.50 g/t Au) from 189.5

metres;

Results from the entirety of the M&I Conversion Program have validated the geologic

model, successfully establishing continuity of the high-grade shoots bearing robust

geometry over 350 metres. The shoots remain open to the Northwest and downdip;

Significant new zones of near-surface mineralization were encountered during the M&I

Conversion Program at higher-than-average grades updip from the existing resource

shell;

Modelling of the M&I Conversion Program drillholes is now underway with an updated

mineral resource estimate on Tonopah West on track for Q3, 2025; and

Assay results for 7 drillholes from the Company's Northwest step out resource

expansion area are currently pending.

(see February 24, 2025 news release)

Vancouver, British Columbia--(Newsfile Corp. - June 17, 2025) -

Blackrock Silver Corp. (TSXV: BRC)

(OTCQX: BKRRF) (FSE: AHZ0)

("

Blackrock

" or the "

Company

") announces the final set of high-

grade silver and gold drill intercepts from its recently completed M&I Conversion Program (as defined

herein) at its 100% owned Tonopah West project ("

Tonopah West

") located in Nye and Esmeralda

Counties, Nevada, United States.

The Company has completed its in-fill drilling program (the "

M&I Conversion Program

") at Tonopah

West which commenced in mid July 2024 and consisted of 62 drillholes totalling 12,580 metres (41,271

feet) within the shallow southern portion of the Bermuda-Merten vein group ("

DPB

") resource area (the

"

M&I Conversion Area

").

The objective of the M&I Conversion Program is to convert between 1.0 and

1.5-million tonnes of material from inferred mineral resources to measured and indicated mineral

resources. The M&I Conversion Area represents the initial years of anticipated production at Tonopah

West based on the mine plan laid out in the Company's Preliminary Economic Assessment on Tonopah

West (see September 4, 2024 news release).

Andrew Pollard, the Company's President and Chief Executive Officer, stated: "With all assays now

received from our M&I Conversion Program, we've validated our geologic model at Tonopah West and

confirmed continuous high-grade mineralization over a 350-metre zone. Results from this program

featured standout grades that reinforce the Tonopah West project's position as one of the top

undeveloped silver assets in the sector. In addition to strengthening confidence in known zones through

tighter drill spacing, the program also outlined new near-surface zones of ultra-high-grade gold and silver

mineralization, representing meaningful new tonnage potential. These results will be incorporated into an

updated mineral resource estimate on Tonopah West anticipated to be completed Q3 2025, aimed at

upgrading significant tonnage to the measured and indicated categories to help de-risk the early years

of anticipated production."

Table 1: Tonopah West Assay Intercepts using 150 g/t AgEq cut off

Drillhole ID

Hole

Type

Program

From

(m)

To (m)

Drill

Interval

(m)

Ag (g/t)

Au (g/t)

AgEq

(g/t)

(2)(3)

TXC25-139

RC/Core

(1)

M&I Conversion

187.54

196.60

9.05

182.8

2.038

366.6

Including

187.54

188.37

0.82

1,411.0

16.133

2,866.4

TXC25-141

RC/Core

(1)

M&I Conversion

273.59

275.17

1.59

106.6

0.787

177.6

TXC25-141

RC/Core

(1)

M&I Conversion

447.66

448.27

0.61

694.9

7.512

1,372.5

Including

447.97

448.27

0.31

1,226.0

13.733

2,464.9

TXC25-142

RC/Core

(1)

M&I Conversion

347.08

347.60

0.52

5.1

1.610

150.3

TXC25-142

RC/Core

(1)

M&I Conversion

361.01

361.80

0.79

597.6

4.540

1,007.1

Including

361.01

361.37

0.37

1,122.0

8.160

1,858.1

TXC25-146

RC/Core

(1)

M&I Conversion

189.50

190.65

1.16

615.0

5.497

1,110.9

Including

189.95

190.65

0.70

920.1

8.330

1,671.6

TXC25-147

RC/Core

(1)

M&I Conversion

148.19

151.85

3.66

176.7

1.228

287.5

Including

150.88

151.43

0.55

704.0

4.250

1,087.4

TXC25-147

RC/Core

(1)

M&I Conversion

182.58

183.34

0.76

277.5

5.586

781.5

Including

183.00

183.34

0.34

315.0

6.620

912.2

TXC25-148

RC/Core

(1)

M&I Conversion

124.66

125.43

0.76

111.0

1.270

225.6

TXC25-148

RC/Core

(1)

M&I Conversion

238.35

240.49

2.13

198.1

2.383

413.1

Including

238.35

238.96

0.61

512.0

5.590

1,016.3

TXC25-149

RC/Core

(1)

M&I Conversion

129.36

129.97

0.61

491.0

4.570

903.3

TXC25-149

RC/Core

(1)

M&I Conversion

238.35

239.57

1.22

93.7

1.919

266.8

TXC25-149

RC/Core

(1)

M&I Conversion

252.59

253.59

1.01

38.2

2.157

232.8

TXC25-150

RC/Core

(1)

M&I Conversion

162.37

165.20

2.84

363.6

3.413

671.5

Including

163.47

164.23

0.76

818.9

8.144

1,553.6

TXC25-151

RC/Core

(1)

M&I Conversion

274.47

275.42

0.95

208.7

3.149

492.8

(1)

RC/Core = RC pre-collar with core tail.

(2)

AgEq = Ag + Au*(Factor); where Factor = (Au Price/Ag Price)*(Au Recovery/Ag Recovery or Factor=($1900/$23)*(95%/87%)=90.21; True thickness is

90 to 100% of interval thickness based on the modelled vein geometries.

(3)

Cut-off grade is 150 g/t AgEq.

The geometry of the high-grade silver and gold is sizable with high-grade shoots plunging to the

northwest and showing continuity over 350 metres within the M&I Conversion Area. These shoots remain

open to the northwest and open down plunge.

Multiple high-grade intercepts have been returned

pursuant to the M&I Conversion Program. TXC25-139 returned over 9-metres grading 183 g/t silver and

2.04 g/t gold for 367 g/t AgEq. This intercept is immediately adjacent to mineralization found in TXC25-

138 (see May 8, 2025 news release) where a composite zone of 11.46 metres of 514 g/t AgEq (290 g/t

Ag & 2.48 g/t Au) was encountered. The thickness of this mineralized vein is approaching those seen in

the historic mining at the Victor and Ohio mines at Tonopah West where Victor was 24 metres thick and

Ohio was 15 metres thick.

The completion of the M&I Conversion Program now allows for modelling of the vein shoots and high-

grade gold and silver for an updated mineral resource estimate which is anticipated to be completed this

fall.

Management of the Company believes the updated mineral resource estimate will show excellent

continuity between the high-grade zones and an increase in confidence of the DPB portion of the mineral

resource.

This information will assist in the design and implementation of an exploration decline,

underground test mining and extraction of a bulk sample for metallurgical processing at Tonopah West.

Table 2 shows all of the intercepts above 150 g/t AgEq encountered pursuant to the M&I Conversion

Program.

Approximately 65% of the drilling returned values above 150 g/t AgEq with the remaining

drillholes returning mineralization, albeit below the cutoff.

No drillhole in the campaign was completely

barren of gold or silver.

Table 2:Significant Assays From The M&I Conversion Program Above 150 g/t AuEq Cutt Off

Drillhole ID

Hole

Type

Program

From

(m)

To (m)

Drill

Interval

(m)

Ag (g/t)

Au (g/t)

AgEq

(g/t)

(2)(3)

TXC24-076

RC/Core

(1)

M&I Conversion

195.62

195.93

0.31

99.2

1.440

229.1

TXC24-080

RC/Core

(1)

M&I Conversion

367.29

369.27

1.98

174.0

0.844

250.1

TXC24-081

RC/Core

(1)

M&I Conversion

181.51

183.49

1.98

131.9

1.503

267.5

TXC24-085

RC/Core

(1)

M&I Conversion

171.60

172.67

1.07

152.7

1.613

298.2

TXC24-085

RC/Core

(1)

M&I Conversion

249.48

252.07

2.59

32.1

2.740

279.3

TXC24-087

RC/Core

(1)

M&I Conversion

172.21

174.80

2.59

1,920.9

20.262

3,748.7

Including

173.74

174.80

1.07

4,328.3

46.506

8,523.6

TXC24-090

RC/Core

(1)

M&I Conversion

161.85

162.92

1.07

436.0

5.110

897.0

TXC24-091

RC/Core

(1)

M&I Conversion

242.32

244.08

1.77

111.0

1.060

206.6

TXC24-091

RC/Core

(1)

M&I Conversion

249.02

252.13

3.11

350.1

3.519

667.5

Including

250.55

252.13

1.59

469.5

4.931

914.3

TXC24-092

RC/Core

(1)

M&I Conversion

141.64

142.77

1.13

534.0

6.910

1,157.4

TXC24-092

RC/Core

(1)

M&I Conversion

145.70

149.05

3.35

470.6

5.356

953.8

Including

148.32

149.05

0.73

1,706.0

19.467

3,462.1

TXC24-092

RC/Core

(1)

M&I Conversion

186.02

187.30

1.28

303.0

3.660

633.2

TXC24-094

RC/Core

(1)

M&I Conversion

213.67

215.80

2.13

92.3

1.530

230.3

TXC24-095

RC/Core

(1)

M&I Conversion

192.94

194.62

1.68

572.7

5.379

1,057.9

TXC24-095

RC/Core

(1)

M&I Conversion

195.99

197.82

1.83

147.0

2.160

341.9

TXC24-095

RC/Core

(1)

M&I Conversion

238.96

240.03

1.07

343.7

3.213

633.5

Including

239.48

240.03

0.55

665.0

6.230

1,227.0

TXC24-095

RC/Core

(1)

M&I Conversion

242.47

247.50

5.03

461.5

3.478

775.3

Including

245.36

246.13

0.76

1,362.0

9.810

2,247.0

TXC24-098

RC/Core

(1)

M&I Conversion

326.75

327.97

1.22

265.6

4.097

635.2

Including

327.66

327.97

0.30

1,034.0

16.067

2,483.4

TXC24-100

Core

M&I Conversion

140.97

143.23

2.26

530.3

4.085

898.8

Including

141.67

142.59

0.92

943.0

7.156

1,588.5

TXC24-101

Core

M&I Conversion

137.56

138.84

1.28

687.2

6.656

1,287.6

TXC24-101

Core

M&I Conversion

169.26

169.56

0.31

181.0

2.970

448.9

TXC24-101

Core

M&I Conversion

255.42

256.49

1.07

66.4

1.310

184.6

TXC24-102

Core

M&I Conversion

152.95

153.92

0.98

628.0

4.670

1,049.3

Including

153.32

153.92

0.61

756.0

6.280

1,322.5

TXC24-103

Core

M&I Conversion

232.26

233.78

1.52

134.0

1.675

285.1

Including

232.26

232.56

0.31

660.0

8.230

1,402.4

TXC24-104

Core

M&I Conversion

295.20

295.60

0.40

125.0

1.610

270.2

TXC24-115

RC/Core

(1)

M&I Conversion

332.54

336.50

3.96

375.2

3.154

659.7

Including

332.54

333.91

1.37

624.8

5.066

1,081.8

TXC24-116

RC/Core

(1)

M&I Conversion

199.34

199.89

0.55

987.0

11.467

2,021.4

TXC24-116

RC/Core

(1)

M&I Conversion

218.12

218.69

0.58

135.0

1.440

264.9

TXC24-117

RC/Core

(1)

M&I Conversion

246.46

247.04

0.58

105.0

1.460

236.7

TXC24-117

RC/Core

(1)

M&I Conversion

261.21

263.23

2.01

1,141.0

7.139

1,785.0

Including

262.83

263.23

0.40

3,712.0

26.133

6,069.5

TXC24-118

RC/Core

(1)

M&I Conversion

205.98

206.35

0.37

1,610.0

15.333

2,993.2

TXC24-118

RC/Core

(1)

M&I Conversion

332.17

332.54

0.37

91.3

1.280

206.8

TXC24-119

RC/Core

(1)

M&I Conversion

370.42

375.12

4.69

379.0

3.722

714.8

Including

372.16

373.38

1.22

770.5

7.757

1,470.3

TXC24-121

RC/Core

(1)

M&I Conversion

262.13

266.00

3.87

179.3

1.365

302.4

TXC24-122

RC/Core

(1)

M&I Conversion

270.05

270.97

0.92

477.7

4.880

917.9

Including

270.66

270.97

0.31

875.0

8.880

1,676.1

TXC24-122

RC/Core

(1)

M&I Conversion

337.11

342.32

5.21

291.7

3.018

564.0

Including

341.59

342.32

0.73

1,834.0

18.081

3,465.1

TXC25-125

RC/Core

(1)

M&I Conversion

327.97

329.31

1.34

118.2

1.336

238.7

Including

328.27

328.58

0.31

432.0

4.900

874.0

TXC25-126

RC/Core

(1)

M&I Conversion

319.61

320.22

0.61

247.8

2.554

478.2

Including

319.92

320.22

0.31

421.0

4.380

816.1

TXC25-128

RC/Core

(1)

M&I Conversion

300.81

302.21

1.40

244.8

2.070

431.6

TXC25-128

RC/Core

(1)

M&I Conversion

348.14

348.75

0.61

300.5

3.030

573.8

TXC25-128

RC/Core

(1)

M&I Conversion

427.76

428.46

0.70

129.0

1.360

251.7

TXC25-129

RC/Core

(1)

M&I Conversion

307.24

308.15

0.91

155.5

1.322

274.8

TXC25-129

RC/Core

(1)

M&I Conversion

344.94

345.55

0.61

237.0

2.520

464.3

TXC25-131

RC/Core

(1)

M&I Conversion

319.19

319.80

0.61

292.7

2.480

516.5

Including

319.49

319.80

0.31

584.0

4.940

1,029.6

TXC25-132

RC/Core

(1)

M&I Conversion

437.60

438.52

0.92

125.8

1.804

288.6

TXC25-138

RC/Core

(1)

M&I Conversion

230.40

234.64

4.24

378.5

3.572

700.7

Including

232.72

233.02

0.31

1,805.0

15.267

3,182.2

TXC25-138

RC/Core

(1)

M&I Conversion

236.68

241.86

5.18

328.2

2.528

556.3

Including

238.35

238.66

0.31

1,987.0

15.000

3,340.2

TXC25-139

RC/Core

(1)

M&I Conversion

187.54

196.60

9.05

182.8

2.038

366.6

Including

187.54

188.37

0.82

1,411.0

16.133

2,866.4

TXC25-140

RC/Core

(1)

M&I Conversion

362.90

363.81

0.91

335.6

3.803

678.7

Including

362.90

363.20

0.30

371.0

4.310

759.8

TXC25-140

RC/Core

1

M&I Conversion

378.11

380.09

1.98

96.0

1.215

205.6

Including

379.05

380.09

1.04

136.5

1.787

297.7

TXC25-141

RC/Core

(1)

M&I Conversion

273.59

275.17

1.59

106.6

0.787

177.6

TXC25-141

RC/Core

(1)

M&I Conversion

447.66

448.27

0.61

694.9

7.512

1,372.5

Including

447.97

448.27

0.31

1,226.0

13.733

2,464.9

TXC25-142

RC/Core

(1)

M&I Conversion

347.08

347.60

0.52

5.1

1.610

150.3

TXC25-142

RC/Core

(1)

M&I Conversion

361.01

361.80

0.79

597.6

4.540

1,007.1

Including

361.01

361.37

0.37

1,122.0

8.160

1,858.1

TXC25-146

RC/Core

(1)

M&I Conversion

189.50

190.65

1.16

615.0

5.497

1,110.9

Including

189.95

190.65

0.70

920.1

8.330

1,671.6

TXC25-147

RC/Core

(1)

M&I Conversion

148.19

151.85

3.66

176.7

1.228

287.5

Including

150.88

151.43

0.55

704.0

4.250

1,087.4

Drillhole ID

Hole

Type

Program

From

(m)

To (m)

Drill

Interval

(m)

Ag (g/t)

Au (g/t)

AgEq

(g/t)

(2)(3)

TXC25-147

RC/Core

(1)

M&I Conversion

182.58

183.34

0.76

277.5

5.586

781.5

Including

183.00

183.34

0.34

315.0

6.620

912.2

TXC25-148

RC/Core

(1)

M&I Conversion

124.66

125.43

0.76

111.0

1.270

225.6

TXC25-148

RC/Core

(1)

M&I Conversion

238.35

240.49

2.13

198.1

2.383

413.1

Including

238.35

238.96

0.61

512.0

5.590

1,016.3

TXC25-149

RC/Core

(1)

M&I Conversion

129.36

129.97

0.61

491.0

4.570

903.3

TXC25-149

RC/Core

(1)

M&I Conversion

238.35

239.57

1.22

93.7

1.919

266.8

TXC25-149

RC/Core

(1)

M&I Conversion

252.59

253.59

1.01

38.2

2.157

232.8

TXC25-150

RC/Core

(1)

M&I Conversion

162.37

165.20

2.84

363.6

3.413

671.5

Including

163.47

164.23

0.76

818.9

8.144

1,553.6

TXC25-151

RC/Core

(1)

M&I Conversion

274.47

275.42

0.95

208.7

3.149

492.8

(1)

RC/Core = RC pre-collar with core tail.

(2)

AgEq = Ag + Au*(Factor); where Factor = (Au Price/Ag Price)*(Au Recovery/Ag Recovery or Factor=($1900/$23)*(95%/87%)=90.21; True thickness is

90 to 100% of interval thickness based on the modelled vein geometries.

(3)

Cut-off grade is 150 g/t AgEq.

Drillhole ID

Hole

Type

Program

From

(m)

To (m)

Drill

Interval

(m)

Ag (g/t)

Au (g/t)

AgEq

(g/t)

(2)(3)

Figure 1: Tonopah West project showing NI43-101 resource location and expansion potential

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/676/255788_d1bf53a51451fba6_001full.jpg

Figure 2 is a plan map showing the location of all the drillholes completed under the M&I Conversion

Program and highlighting those reported in this news release.

Figure 2: Drillhole location map of the M&I Conversion Program showing drillholes reported in this

news release.

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/676/255788_d1bf53a51451fba6_002full.jpg

Table 3: Tonopah West Drillhole Location Coordinates (based on GPS readings in the field, Datum

UTM, NAD 1927, Zone 11)

Drillhole ID

Area

Program

Type

UTM_NAD27

E

UTM_NAD27

N

Elevation

(m)

Depth

(ft)

Depth

(m)

Azimuth

Dip

TXC25-137

DPB South

M&I Conversion

RC/Core

477930.7

4213330.8

1776.3

1028.0

313.3

180

-62

TXC25-139

DPB South

M&I Conversion

RC/Core

477980.6

4213246.5

1778.4

1061.0

323.4

180

-67

TXC25-141

DPB South

M&I Conversion

RC/Core

477826.6

4213599.2

1770.7

1647.0

502.0

180

-62

TXC25-142

DPB South

M&I Conversion

RC/Core

477905.7

4213694.6

1772.9

1717.0

523.3

180

-50

TXC25-146

DPB South

M&I Conversion

RC/Core

478081.5

4213327.2

1780.6

912.0

278.0

180

-60

TXC25-147

DPB South

M&I Conversion

RC/Core

478067.5

4213281.7

1781.7

953.5

290.6

180

-60

TXC25-148

DPB South

M&I Conversion

RC/Core

478073.8

4213237.8

1781.8

979.0

298.4

180

-60

TXC25-149

DPB South

M&I Conversion

RC/Core

478101.9

4213225.4

1783.3

902.0

274.9

180

-60

TXC25-150

DPB South

M&I Conversion

RC/Core

478107.8

4213270.4

1783.1

897.5

273.6

180

-60

TXC25-151

DPB South

M&I Conversion

RC/Core

478104.9

4213335.4

1781.1

943.0

287.4

180

-60

Quality Assurance/ Quality Control

All sampling is conducted under the supervision of the Company's project geologists, and a strict chain

of custody from the project to the sample preparation facility is implemented and monitored. The RC and

core samples are hauled from the project site to a secure and fenced facility in Tonopah, Nevada, where

they are loaded on to American Assay Laboratory's (AAL) flat-bed truck and delivered to AAL's facility in

Sparks, Nevada.

A sample submittal sheet is delivered to AAL personnel who organize and process the

sample intervals pursuant to the Company's instructions.

The RC samples are lined out at the lab and logged in to AAL's system.

The core samples are cut using

core saws and personnel at AAL's facility in Sparks, Nevada according to the Company's instructions

delivered with each core hole.

All samples are dried, crushed to 85% passing 10 mesh (2mm) and a 250-gram sub-sample split is

collected and pulverized to 200 mesh (74 micron) in a ring and puck pulverizer.

Then the pulverized

material is digested and analyzed for gold using fire assay fusion and an Induced Coupled Plasma (ICP)

finish on a 30-gram assay split (FA-PB30-ICP). Silver is determined using five-acid digestion and ICP

analysis (ICP-5AM48).

Over limits for gold and silver are determined using a gravimetric finish

(GRAVAU30 and GRAVAG30).

Data verification of the assay and analytical results are completed to

ensure accurate and verifiable results. Blackrock personnel insert a blind prep blank, lab blank or a

certified reference material approximately every 15th to 20th sample.

Qualified Persons

Blackrock's exploration activities at Tonopah West are conducted and supervised by Mr. William

Howald, Executive Chairman of Blackrock. Mr. William Howald, AIPG Certified Professional Geologist

#11041, is a Qualified Person as defined under National Instrument 43-101 -

Standards of Disclosure

for Mineral Projects

. He has reviewed and approved the contents of this news release.

About Blackrock Silver Corp.

Backed by gold and silver ounces in the ground, Blackrock is a junior precious metal focused exploration

and development company driven to add shareholder value. Anchored by a seasoned Board of

Directors, the Company is focused on its 100% controlled Nevada portfolio of properties consisting of

low-sulphidation, epithermal gold and silver mineralization located along the established Northern

Nevada Rift in north-central Nevada and the Walker Lane trend in western Nevada.

Additional information on Blackrock Silver Corp. can be found on its website at

www.blackrocksilver.com

and by reviewing its profile on SEDAR at

www.sedarplus.ca

.

Cautionary Note Regarding Forward-Looking Statements and Information

This news release contains "forward-looking statements" and "forward-looking information" (collectively,

"

forward-looking statements

") within the meaning of Canadian and United States securities

legislation, including the United States Private Securities Litigation Reform Act of 1995. All statements,

other than statements of historical fact, are forward-looking statements. Forward-looking statements in

this news release relate to, among other things: the Company's strategic plans; the anticipated

objectives and results from the Company's drill programs at Tonopah West; the incorporation of the

results from the M&I Conversion Program in an updated mineral resource estimate on Tonopah West

and the anticipated timing of release thereof; the Company's de-risking initiatives at Tonopah West;

estimates of mineral resource quantities and qualities; estimates of mineralization from drilling;

geological information projected from sampling results; and the potential quantities and grades of the

target zones.

These forward-looking statements reflect the Company's current views with respect to future events and

are necessarily based upon a number of assumptions that, while considered reasonable by the

Company, are inherently subject to significant operational, business, economic and regulatory

uncertainties and contingencies. These assumptions include, among other things: conditions in general

economic and financial markets; accuracy of assay results; geological interpretations from drilling

results, timing and amount of capital expenditures; performance of available laboratory and other related

services; future operating costs; the historical basis for current estimates of potential quantities and

grades of target zones; the availability of skilled labour and no labour related disruptions at any of the

Company's operations; no unplanned delays or interruptions in scheduled activities; all necessary

permits, licenses and regulatory approvals for operations are received in a timely manner; the ability to

secure and maintain title and ownership to properties and the surface rights necessary for operations;

and the Company's ability to comply with environmental, health and safety laws. The foregoing list of

assumptions is not exhaustive.

The Company cautions the reader that forward-looking statements involve known and unknown risks,

uncertainties and other factors that may cause actual results and developments to differ materially from

those expressed or implied by such forward-looking statements contained in this news release and the

Company has made assumptions and estimates based on or related to many of these factors. Such

factors include, without limitation: the timing and content of work programs; results of exploration

activities and development of mineral properties; the interpretation and uncertainties of drilling results

and other geological data; receipt, maintenance and security of permits and mineral property titles;

environmental and other regulatory risks; project costs overruns or unanticipated costs and expenses;

availability of funds; failure to delineate potential quantities and grades of the target zones based on

historical data; general market and industry conditions; and those factors identified under the caption

"Risks Factors" in the Company's most recent Annual Information Form.

Forward-looking statements are based on the expectations and opinions of the Company's

management on the date the statements are made. The assumptions used in the preparation of such

statements, although considered reasonable at the time of preparation, may prove to be imprecise and,

as such, readers are cautioned not to place undue reliance on these forward-looking statements, which

speak only as of the date the statements were made. The Company undertakes no obligation to update

or revise any forward-looking statements included in this news release if these beliefs, estimates and

opinions or other circumstances should change, except as otherwise required by applicable law.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined

in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or

accuracy of this release.

For Further Information, Contact:

Andrew Pollard

President and Chief Executive Officer

(604) 817-6044

[email protected]

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/255788