Monday, September 14, 2026
MiningNewsTerminal
Monday, September 14, 2026 Admin

BRAZ.CN ·

Canary Gold Corp. Outlines Technical Validation Pathway for Rio Madeira Alluvial Gold Project

CANARY GOLD OUTLINES TECHNICAL VALIDATION PATHWAY FOR RIO

MADEIRA ALLUVIAL GOLD PROJECT

Vancouver, British Columbia – June 25, 2026 – Canary Gold Corp. (CSE: BRAZ; OTCQB: CNYGF;

Frankfurt: K5D) (“Canary Gold” or the “Company”) is pleased to provide a follow-up to its June 10, 2026

news release and announce that it has received additional technical observations and recommendations

from Clara Maria Lamus Molina, an internationally recognized geologist-engineer and specialist in the

evaluation and sampling of alluvial gold deposits.

The review supports the Company’s view that Rio Madeira represents a prospective large-scale alluvial

exploration target where the next phase of technical advancement will depend on disciplined validation

of paleochannel geometry, gravel continuity, recoverable gold content and volumetric grade. Ms.

Molina’s work provides Canary with a practical roadmap to advance from preliminary geological

observations toward systematic, representative and auditable technical data.

The Company believes the review represents an important next step in positioning the Madeira River

Project for future exploration milestones, evaluation of whether sufficient technical information can

ultimately support a National Instrument 43-101 compliant mineral resource estimate subject to

continued exploration success, additional drilling, representative sampling, QA/QC, recovery testing and

geological modelling.

Ms. Molina’s review highlights several positive indicators and technical priorities at the Madeira River

Project, including:

 active alluvial gold mining observed within the Madeira River system;

 visible free gold observed during the inspection of active alluvial mining operations within the

broader Madeira River system; these observations provide regional geological context only and

are not necessarily indicative of mineralization on the Company’s property;

 favourable gravel intervals identified in areas of exploration interest;

 geomorphological features compatible with alluvial plains, terraces, paleochannels and high-

energy channel environments;

 paleochannels and coarse-gravel systems identified as priority targets for alluvial gold

concentration;

 sonic drilling recommended as a preferred validation tool in priority target areas;

 recovered-volume control recommended to evaluate gold content on a reliable volumetric

basis;

 standardized logging, granulometry, gold-particle classification, QA/QC and chain-of-custody

procedures recommended; and

 geological-volumetric modelling identified as a key step toward future resource-readiness.

As announced on June 10, 2026, recent deeper drilling has intersected targeted mature coarse

sediments, including gravels and sands, supporting the Company’s interpretation of a large-scale

paleochannel system associated with the Madeira River.

Figure 1: Preliminary interpretation of the Jaci Paraná Paleochannel target area at the Madeira River

Project. The interpreted paleochannel target remains prospective and requires validation through

systematic drilling, controlled sampling, volumetric analysis and QA/QC.

Mark Tommasi, President of Canary Gold, commented:

“Rio Madeira exhibits several characteristics commonly associated with alluvial gold systems, including

interpreted paleochannel targets, favourable gravel horizons and active alluvial mining within the

broader Madeira River region. The next step is disciplined validation. Ms. Molina’s review gives us a

clear technical pathway to test the project in a way that is systematic, auditable and meaningful for

investors.”

Mr. Tommasi continued:

“Alluvial gold systems are different from conventional hard-rock deposits. They are generally evaluated

on a volumetric basis, where the size and continuity of the paleochannel, the thickness of favourable

gravels, recoverable gold content, stripping ratio, processing efficiency and throughput are all

important. Our objective is to define the channel, measure the gravel, validate the grade, test recovery

and build the database step by step.”

Why the Alluvial Model Matters

Alluvial, or placer, gold systems are formed when gold is naturally liberated from source rocks,

transported by ancient or modern river systems and concentrated by hydraulic sorting within favourable

sedimentary environments such as coarse gravels, sand bars, terraces, channel bases and

paleochannels.

Canary’s exploration model at the Madeira River Project is focused on identifying preserved

paleochannel and high-energy gravel environments within the broader Madeira River system where gold

may have been naturally concentrated and preserved.

The Company believes the Madeira River Project is best understood through a staged alluvial-gold

development pathway.

Canary is currently in the early stages of this pathway. The Company has identified preliminary

geological indicators and priority paleochannel-style targets. The next phase is intended to validate

geometry, continuity, gravel thickness, representative grade and recovery characteristics.

Technical Program Focus

A central recommendation from Ms. Molina is the use of sonic drilling in priority target areas. Sonic

drilling is considered well suited to unconsolidated alluvial environments because it can improve sample

recovery, preserve stratigraphic relationships, reduce interval contamination, improve fine-material

recovery and support more accurate measurement of recovered sample volume.

These factors are critical in alluvial gold exploration, where gold distribution can be irregular and reliable

evaluation depends on representative sampling, volume control and repeatable recovery methods.

Future work is expected to focus on:

 systematic sonic drilling in priority areas;

 metre-by-metre geological logging;

 recovered-volume measurement by interval;

 controlled sample processing and gravity concentration;

 gold-particle recovery, classification and weighing;

 laboratory validation of selected samples;

 robust QA/QC and chain-of-custody procedures; and

 geological-volumetric modelling.

Figure 2: Conceptual alluvial-gold development pathway showing the technical progression from

discovery and paleochannel definition through drill delineation, bulk sampling, resource estimation,

economic studies, reserves and potential production. Canary is currently focused on early-stage

validation, and there is no assurance the Project will advance through all stages.

Sampling, Processing and QA/QC

Ms. Molina has recommended that future sampling programs incorporate a practical sample-processing

workflow appropriate for alluvial gold environments. Under this approach, samples from target horizons

may be screened through a 1/8-inch mesh, with the passing material washed and concentrated.

Concentration may be completed through skilled panning or, where appropriate, calibrated modern

gravity-concentration equipment.

The process is expected to include experienced technical supervision, gold-particle classification and use

of a deposit-specific particle-size-to-weight calibration chart to support consistent preliminary field

estimates.

The Company continues to review and refine its sampling and analytical procedures as exploration

progresses. The objective is to establish a representative, repeatable and auditable technical workflow

appropriate for alluvial gold and coarse gold environments.

Learning from Mature Alluvial Systems

Canary has also reviewed mature alluvial gold syste ms to better understand the technical pathway

required to move an alluvial discovery toward resource definition and potential development.

One relevant example is the Nechí alluvial gold sys tem in Colombia, operated by Mineros S.A. Nechí is a

long-running alluvial operation with NI 43-101 mineral resource and reserve disclosure, extensive drilling,

production history and operating reconciliation.

Canary cautions that Nechí is referenced solely as an educational and technical benchmark for how alluvial

systems can be evaluated and advanced when sufficie nt drilling, volume control, recovery testing, mine

planning and QA/QC have been completed. Nechí is no t located on or adjacent to the Madeira River

Project, is materially more advanced than the Madei ra River Project, and no inference should be drawn

that the Madeira River Project hosts comparable mineralization, grades, resources, reserves, recoveries,

economics or mining conditions.

Mr. Tommasi added:

“Nechí is not a direct comparison to Rio Madeira. It is a useful example of the level of technical discipline

required to move an alluvial system from concept to resource and operating model. Our objective is to

apply that discipline early at Rio Madeira and build the technical foundation required for future

decision-making.”

Management’s View

Canary believes the Madeira River Project represents an early-stage alluvial gold exploration project

with multiple targets requiring further technical validation. The Company’s immediate objective is to

advance from preliminary geological and field observations toward representative, auditable data that

can support future technical and investment decisions.

The Company is now reviewing budgets, logistics, ac cess and sequencing for a priority sonic-drilling a nd

sample-processing program at the Madeira River Project.

The Company cautions investors that exploration at the Madeira River Project remains at an early stage.

No mineral resource has been defined, and there can be no assurance that continued exploration will

result in the delineation of an economic mineral deposit. Geological interpretations, including

interpreted paleochannel targets, remain subject to further drilling, sampling, testing and validation.

Qualified Person and Technical Disclosure

The scientific and technical information contained in this news release has been reviewed and approved

by Andrew Lee Smith, P.Geo., a Qualified Person as defined by National Instrument 43-101 – Standards of

Disclosure for Mineral Projects.

Mr. Smith has previously visited the Company’s proj ect areas in Brazil and is familiar with the region al

geology and exploration activities. While not continuously present on site, Mr. Smith has reviewed drilling,

sampling, QA/QC and geological information and is satisfied that the information has been collected and

reported by site-based personnel in accordance with industry standard practices.

Mr. Smith is not independent of the Company within the meaning of National Instrument 43-101, as he

serves as Executive Chairman of Canary Gold Corp.

About Canary Gold Corp.

Canary Gold Corp. is a Canadian public exploration company focused on the acquisition and

advancement of gold projects in Brazil. The Company holds an option to earn up to a 70% undivided

interest in the Rio Madeira Project through a series of staged exploration expenditures and milestone

payments.

In August 2025, Canary further expanded its regional strategy by entering into a definitive agreement to

acquire a 100% interest in ten additional mineral tenements totaling approximately 94,700 hectares

from Talisman Venture Partners Ltd. , a private British Columbia corporation. The total consideration of

CAD $1.7 million has been satisfied through staged cash and share payments.

Talisman retains a 1.0% net smelter return (NSR) royalty on future production from the acquired

tenements, one-half of which (reducing the NSR to 0.5%) may be repurchased by the Company at any

time for CAD $1.0 million.

Together, these interests provide Canary Gold with a dominant and strategically consolidated land

position in the Madeira River region of Rondônia State — a historically productive and underexplored

gold region of Brazil.

For Further Information, Please Contact:

Canary Gold Corp.

Mark Tommasi, President

Tel: (604) 318-1448

www.canarygold.ca

Cautionary Statement Regarding Forward-Looking Information

This news release contains forward-looking statements within the meaning of applicable securities laws that are not

historical facts. Forward-looking statements are of ten identified by terms such as “will”, “may”, “should”,

“anticipates”, “expects”, “believes”, and similar expressions or the negative of these words or other comparable

terminology. All statements, other than statements of historical fact, included in this release, inclu ding, without

limitation, statements regarding the Company ’s planned exploration programs and drill programs a nd potential

significance of results, are forward-looking statements that involve risks and uncertainties. There can be no assurance

that such statements will prove to be accurate and actual results and future events could differ materially from those

anticipated in such statements. Important factors t hat could cause actual results to differ materially from the

Company ’s expectations include but are not limited to the r isks detailed in the Company ’s Prospectus and in the

continuous disclosure filings made by the Company w ith securities regulations from time to time. The r eader is

cautioned that assumptions used in the preparation of any forward-looking information may prove to be incorrect.

Events or circumstances may cause actual results to differ materially from those predicted, as a resul t of numerous

known and unknown risks, uncertainties, and other f actors, many of which are beyond the control of the Company.

The reader is cautioned not to place undue reliance on any forward-looking information. Such information, although

considered reasonable by management at the time of preparation, may prove to be incorrect and actual results may

differ materially from those anticipated. Forward-l ooking statements contained in this news release ar e expressly

qualified by this cautionary statement. The forward -looking statements contained in this news release are made as

of the date of this news release and the Company wi ll update or revise publicly any of the included fo rward-looking

statements only as expressly required by applicable law.

No securities exchange or commission has reviewed o r accepts responsibility for the adequacy or accura cy of this

release.

Disclaimer

This news release does not constitute an offer to sell or a solicitation of an offer to buy nor shall there be any sale of

any securities in any jurisdiction in which such of fer, solicitation, or sale would be unlawful. The s ecurities of the

Company have not been and will not be registered un der the United States Securities Act of 1933, as am ended (the

“1933 Act”), or any state securities laws and may no t be offered or sold in the “United States” or to “U.S. persons”

(as such terms are defined in Regulation S under th e 1933 Act) unless registered under the 1933 Act an d applicable

state securities laws, or an exemption from such registration requirements is available.