Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BONE.V ·

Erin Ventures Announces Additional Boron Project Assay Results Results include 35.9 meters averaging 30.6% B2O3, with 14.5 meters of 33.5% B2O3

Drill Results

ERIN VENTURES INC. (“Erin”)

NEWS RELEASE - For Immediate Distribution

Erin Ventures Announces Additional Boron Project Assay Results

Results include 35.9 meters averaging 30.6% B2O3, with 14.5 meters of 33.5% B2O3

July 13, 2018

Erin Ventures Inc. [TSXV: EV] has received assay results for the second set of three drill holes from this season’s

exploration program on its 100% owned Piskanja boron project in Serbia, with the results meeting management’s

expectations.

Piskanja is Er in’s wholly -owned high -grade boron deposit with an indicated mineral resource of 7.8 million

tonnes (averaging 31 percent B2O3), and an inferred resource of 3.4 million tonnes (averaging 28.6 percent

B2O3), calculated in accordance with the Canadian Instit ute of Mining Definition Standards on Mineral

Resources and Reserves (CIM Standards) , as disclosed in Erin’s filed report titled, “Mineral Resource Estimate

Update On The Piskanja Borate Project, Serbia, October 2016”.

Highlights of drill holes EV152, EV153 and EV154

Holes 152, 153 and 154 are located on an existing 50x50 meter in-fill drill grid (located in the central part of the

Piskanja deposit). The results from these three holes continue to confirm the existence of massive borate

mineralization and the continuity of several known mineral beds , as these results correlate very well with those

from previously drilled adjacent holes (on a 100x100 m, or a 50x50 m grid).

Hole EV152 intersected a total of 35.9 meters of mineralization averaging 30.6% B2O3, from within five known

borate layers and one new mineralized interval, including an intersection of 21.0 meters averaging 25.1% B2O3,

and another of 14.5 meters of 33.5% B2O3, and results as high as 48.5% B2O3 over 1.7 meters.

Hole EV153 intersected five borate layers totaling 30.5 meters of 27.4% B2O3, including 17.2 meters averaging

22.8% B2O3, and results as high as 47.3% B2O3 over 1.1 meters.

Hole EV154 intersected 5 known borate layers for a total of 17.6 meters of mineralization averaging 33.7%

B2O3, including an intersection of 8.8 meters averaging 35.4% B2O3, and another of 7.4 meters of 39.7% B2O3,

and results as high as 49.6% B2O3 over 1.3 meters.

Assay Results:

HOLE Borate bodies /

Mineralized zone

Interval (m) Thickness

(m)

Weighted average

grade of B2O3 (%) From To

EVP-2018-

152

OB-4 total 139.5 141.7 2.2 35.4

including 140.3 141.7 1.4 45.4

New OB total 150.2 152.2 2.0 47.0

OB-3

total 1 164.5 178.9 14.5 33.5

total 2 164.5 176.5 12.0 37.5

including 165.3 175.1 9.8 42.3

max 165.3 167.0 1.7 48.5

OB-6 total 184.3 185.5 1.2 23.5

including 184.3 185.1 0.8 34.1

Combined zone

OB-3 to OB-6 total 164.5 185.5 21.0 25.1

OB-2

total 215.1 219.5 4.4 37.1

including 216.5 219.5 3.1 42.1

max 216.5 218.2 1.7 45.0

OB-1

total 290.6 296.9 6.3 37.3

including 291.4 296.9 5.4 39.9

max upper part 292.1 293.3 1.2 45.4

max lower part 294.2 296.9 2.7 42.4

Total mineralization in the hole: 35.9 30.6

Included: 25.1 39.1

HOLE Borate bodies /

Mineralized zone

Interval (m) Thickness

(m)

Weighted average

grade of B2O3 (%) From To

EVP-2018-

153

OB-4 total 141.1 143.4 2.3 31.1

including 141.6 143.4 1.8 35.1

OB-3 total 170.1 177.7 7.6 41.4

including 175.2 177.7 2.5 43.6

OB-6 total 186.3 187.3 0.9 32.8

Combined zone

OB-3 to OB-6 total 170.1 187.3 17.2 22.8

OB-2

total 218.4 222.9 4.6 37.4

including 218.9 222.9 4.1 40.2

max 219.6 220.6 1.0 43.1

OB-1

total 294.5 300.8 6.3 31.3

including 294.5 299.9 5.4 35.5

max upper part 294.5 296.4 1.9 40.2

max lower part 296.9 299.0 2.1 43.3

max interval 297.9 299.0 1.1 47.3

Total mineralization in the hole: 30.5 27.4

Included: 19.8 38.6

HOLE Borate bodies /

Mineralized zone

Interval (m) Thickness

(m)

Weighted average

grade of B2O3 (%) From To

EVP-2018-

154

OB-4 total 97.4 100.2 2.8 0.2

OB-3

total 1 110.0 118.7 8.8 35.4

total 2 110.0 117.4 7.4 39.7

including 110.0 116.7 6.8 40.8

max upper part 110.0 112.4 2.5 44.8

max lower part 114.6 116.7 2.1 43.7

New OB/ OB-6 total 134.7 135.9 1.1 12.7

OB-2 total 160.1 162.6 2.5 34.7

OB-1

total 230.4 235.6 5.1 35.0

including 230.4 233.7 3.3 42.2

max 230.4 231.7 1.3 49.6

Total mineralization in the hole: 17.6 33.7

Included: 14.4 37.2

Chemical analyses were conducted as follows:

 Results are stated as a percentage concentration

 All measurements are metric

 Chemical analysis is conducted by SGS Turkey - an accredited laboratory located in Ankara, Turkey , with

sample preparation conducted by SGS's facility in Bor, Serbia

 Control samples are sent to an umpire lab - Bureau Veritas Minerals Lab in Perth, Australia

 Analytical Methodology:

1. ICP90Q (by Sodium peroxide fusion) - for determination of high grade Boron (presented in B%)

2. ICP90A (by Sodium peroxide fusion) for multi-element analysis and low-grade Boron (Al, As, B, Be, Ca,

Cd, Co, Cr, Cu, Fe, K, La, Li, Mg, Mn, Mo, Ni, P, Pb, Sb, Sc, Sn, Ti, V, W, Y, Zn)

3. ICP95A -Whole rock analysis (by Lithium metaborate Fusion / ICP-AES) for determinations: Al2O3, Ba,

CaO, Cr2O3, Fe2O3, K2O, MgO, MnO, Na2O, P2O5, SiO2, Sr, TiO2, Zr

4. CSA06V - total Sulphur, Leco method

5. PHY01K – for determination of L.O.I (Loss on Ignition) at approx. 950°C by Gravimetric Analysis

 Location: Piskanja Project, Baljevac, Serbia

 Sample type: HQ-size diamond core drilling, with drilling conducted by Geomag d.o.o. of Belgrade, Serbia

 Azimuth/dip: vertical hole, 90 degree dip

 Sample interval is 0.5 metres

This work program was designed to ensure that the project continues to comply with both the Canadian Institute

of Mining "Best Practice Guidelines", and the Republic of Serbia Ministry of Mining and Energy mine

development and licensing regulations, as well as complying with recommendations made by Erin’s geological

consulting firm - SRK Exploration Services Ltd.

On behalf of the Board of Directors,

Blake Fallis, General Manager

About Erin Ventures Inc.

Erin Ventures Inc. is an international mineral exploration and development company with boron assets in Serbia

and gold assets in North America. Headquartered in Victoria, B.C., Canada, Erin's shares are traded on the TSX

Venture Exchange under the symbol "EV". For detailed information please see Erin's website at

www.erinventures.com or the Company's filed documents at www.sedar.com.

For further information, please contact: Erin’s Public Quotations

Erin Ventures Inc. Canada USA

Blake Fallis, General Manager TSX Venture: EV SEC12G3-2(B)#82-4432

Phone: 1-250- 384-1999 or 1-888-289-3746 OTCBB:ERVFF

[email protected] Europe

www.erinventures.com Berlin: EKV

The technical information in this release was prepared and approved by James E Wallis, M.Sc. (Eng), P.

Eng., a director of the company, who is a Qualified Person under National Instrument 43-101.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward Looking Statements:

This press release contains or refers to forward -looking information under Canadian securities legislation, including

statements regarding the timing of future mineral resource estimates and the PEA, estimation of mineral resources,

exploration results, po tential mineralization, exploration and mine development plans, timing of the commencement of

operations and future production and is based on current expectations that involve a number of business risks and

uncertainties. The words "believe," "expect," “f eel,” "plan," "anticipate," “project,” “could,” “should” and other similar

expressions generally identify forward -looking statements. Forward -looking statements are subject to significant risks and

uncertainties, and other factors that could cause actual results to differ materially from expected results. Readers should not

place undue reliance on forward -looking statements. Factors that could cause actual results to differ materially from any

forward-looking statement include, but are not limited to, fail ure to convert estimated mineral resources to reserves, capital

and operating costs varying significantly from estimates, the preliminary nature of metallurgical test results, delays in

obtaining or failures to obtain required governmental, environmental o r other project approvals, political risks, uncertainties

relating to the availability and costs of financing needed in the future, changes in equity markets, inflation, changes in

exchange rates, fluctuations in commodity prices, delays in the development of projects and the other risks involved in the

mineral exploration and development industry, as well as those factors discussed in the section entitled "Risks of the

Business" in the Company's most recent regulatory filings which are posted on SEDAR at w ww.sedar.com. These forward -

looking statements are made as of the date hereof and the Company assumes no responsibility to update them or revise them

to reflect new events or circumstances other than as required by applicable securities law. These and othe r factors made in

public disclosures and filings by the Company should be considered carefully.

Mineral resources are not mineral reserves and do not have demonstrated economic viability. "Inferred Resources" have a

great amount of uncertainty as to the ir existence, and economic and legal feasibility. Investors are cautioned not to assume

that all or any part of an inferred mineral resource reported in this news release will ever be upgraded to a higher category or

to reserves. U.S. persons are advised t hat while mineral resources are recognized under Canadian regulations, the U.S.

Securities and Exchange Commission does not recognize them. U.S. persons are also cautioned not to assume that all or any

part of an inferred mineral resource is economically or legally mineable.