Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BOLT.CN ·

Step-out drilling confirms and extends high-grade nickel-cobalt mineralization

Drill Results

Step‐out drilling confirms and extends high‐grade nickel‐cobalt mineralization 

Highlights: 

 Drilling consistently confirming elevated nickel and cobalt values 

 Shallow mineralization from surface 

 6‐metre intercept containing 1.93% nickel equivalent 

Vancouver, B.C. – April 23, 2019  –  Pacific Rim Cobalt Corp. (the “Company” or “Pacific Rim Cobalt”) (CSE: 

BOLT) (OTCQB: PCRCF) (FRANKFURT: NXFE) is pleased to announce r esults from its ongoing 2019 shallow 

vertical diamond drilling program at its flagship Cyclops, nickel/cobalt development project, Indonesia. The 

drilling is part of a multi‐faceted exploration program aimed at confirming historical results and producing 

a resource estimate in late 2019.  

The assay results of the 20 step‐out holes drilled to date were well correlated with the historical drill data, 

confirming possible expansion of the mineralized footprint outl ined in the Historical Estimate 2. The data 

from the program will provide th e inputs for an updated mineral  resource, and is expected to be used as 

the  basis  for  eventually  undertaking  a  preliminary  economic  assessment  for  the  project.  The  resource 

calculation is expected to be completed in late 2019.  

The latest drilling results include: 

Hole  From (m)  To (m)  Length (m)  Nickel (%)  Cobalt (%)  NiE Q1(%) 

DD268  0  7  7  0.94  0.27  1.60 

And  7  11  4  1.30  0.14  1.64 

Including  7  9  2  1.61  0.26  2.24 

DD267  0  3  3  0.86  0.14  1.20 

And  3  7  4  1.35  0.06  1.50 

Including  3  5  2  1.65  0.09  1.87 

DD242  0  2  2  0.86  0.09  1.08 

And  2  11  9  1.52  0.04  1.62 

Including  2  10  8  1.62  0.05  1.74 

Including  2  8  6  1.78  0.06  1.93 

DD269  0  5  5  1.20  0.14  1.54 

And  5  11  6  1.57  0.02  1.62 

Including  5  10  5  1.60  0.02  1.65 

All drill intersections reported in this press release are true widths. All holes are vertical and the mineralizing system is flat lying and 

parallel to the surface topography.  

The  Cyclops  Project  area  located  in  Papua  Province,  Indonesia, benefits  from  excellent  infrastructure, 

including proximity to a work force and supplies, sealed roads, ocean access, nearby port facility, and gentle 

topography. The road system enables year‐round access to the project and connects it with the large town 

of  Sentani,  located  about  15  kilometres  (km)  to  the  east,  and  with  Jayapura,  the  capital  city  of  Papua 

province, located about 40 kms to the east. 

Sample Processing 

All drilling results discussed in the press release are JORC co mpliant with all protocols in place. Assaying 

was completed at the Geo Assay Laboratory ‐ PT. Geoservices, Cikarang, Jakarta. The Geo Assay Laboratory 

analysed the samples using the XRF fusion method. PT Geoservice s Ltd ‐ Geo Assay Laboratory employed 

industry standard internal QA/QC methods that Pacific Rim Cobalt reviewed and found acceptable. 

Exploration  drilling  and  sample  procedure  protocols  include:  insertion  of  blank  and  certified  samples; 

photographing and weighing of core; recording of recovery %; samples half cored with the balance retained 

f o r  f u r t h e r  a n a l y s i s  i f  r e q u i r e d ;  s a m p l e  i n t e r v a l s  o f  1 m ;  s a m p le  recovery  is  core;  all  drill  location  and 

elevations recorded. 

National Instrument 43‐101 Disclosure  

The  technical  content  of  this  news  release  has  been  reviewed  and  approved  by  Mr.  Garry  Clark,  PGeo, 

independent director of Pacific Rim Cobalt and a Qualified Pers on as defined by National Instrument 43‐

101. 

1NiEQ  

calculation basis: cobalt price per 3 months (LME data) $32/kg;  nickel price per 3 months (LME data) $13.07/kgC = 

ratio between cobalt price/nickel  price; C = $32/$13.07 = 2.44;  NiEQ = (%Co x C) + % Ni. No metallurgical recoveries 

were applied to either metal as it is expected that the metallurgical recoveries will be similar for both metals. 

2Historical Estimate 

A historical estimate, which dates from before the requirement for uniform regulatory compliance and therefore fails 

to meet the current standards of National Instrument 43‐101, is  being referenced as a guide for Pacific Rim Cobalt's 

2018  work  program.  This  early  data  employed  measurements  still in  use  today  and  indicate  mineralization  from 

surface with an estimated potential of 37 million tonnes of 0.11 per cent cobalt and 1.31 per cent nickel at a 0.8‐per‐

cent‐nickel‐cut‐off  grade.  The  company  intends  to  validate  the  resource  and,  where  possible,  expand  upon  the 

historical estimate, as only five of the nine known cobalt/nickel occurrences were the subject of the historical studies. 

The company affirms this data in no way implies an estimated re source valuation but are offered as a basis for its 

current exploratory efforts and approach. 

Pacific  Rim  Cobalt  considers  the  cobalt  and  nickel  tonnage  and grade  estimates  contained  herein  to  be  historical 

estimates. The historical estimates are contained in the summar y geologic investigations, PT Pacific Nikkel Indonesia 

1 9 6 9  ( R e y n o l d s ,  1 9 7 9 ) .  T h e s e  h i s t o r i c a l  e s t i m a t e s  d o  n o t  u s e  c ategories  that  conform  to  current  CIM  (Canadian 

Institute  of  Mining,  Metallurgy and  Petroleum)  definition  standards  on  mineral  resources  and  mineral  reserves  as 

outlined in National Instrument 43‐101 (Standards of Disclosure for Mineral Projects) and have not been redefined to 

conform to current CIM definition standards. These estimates we re prepared in the 1980s prior to the adoption and 

implementation of NI 43‐101. A qualified person has not done su fficient work to classify the historical estimates as 

current mineral resources, and Pacific Rim Cobalt is not treating the historical estimates as current mineral resources. 

More work, including, but not  limited to drilling will be requi red to conform the estimates to current CIM definition 

standards. Investors are cautioned that the historical estimates do not mean or imply that economic deposits exist on 

the company's project. Efforts to obtain any additional information regarding relevant historical work are continuing, 

although there are no assurances that these original data will be found. Pacific Rim Cobalt believes that the historical 

estimates are relevant to continuing exploration on the project . For more information, please refer to the technical 

report, filed on SEDAR on Dec. 8, 2017, and available under the company's profile at SEDAR. 

About Pacific Rim Cobalt 

Pacific Rim Cobalt is a Canadian‐based exploration company focu sed on the acquisition and development 

of production grade nickel and cobalt deposits, key raw material inputs for the growing lithium‐ion battery 

industry. Visit https://pacificrimcobalt.com/ to find out more.  

Pacific Rim Cobalt Corp. 

Ranjeet Sundher – President and CEO 

(604) 922‐8272 

[email protected] 

Steve Vanry – CFO & Director 

(604) 922‐8272 

[email protected] 

Sean Bromley – Director & Investor Contact 

(778) 985‐8934 

[email protected] 

Reader Advisory 

This news release may contain statements which constitute “forward‐looking information” that are subject 

to  risks  and  uncertainties.  All  statements  herein,  other  than  s tatements  of  historical  fact,  are  to  be 

considered  forward‐looking,  including  statements  regarding  the  plans,  intentions,  beliefs  and  current 

expectations of the Company, its directors, or its officers with respect to the future business activities of the 

Company  and  with  respect  to  the  results  of  exploration  and  prospective  plans  in  regards  to  the  Cyclops 

project.  The  words  “may”,  “would”,  “could”,  “will”,  “intend”,  “plan”,  “anticipate”,  “believe”,  “estimate”, 

“expect” and similar expressions, as they relate to the Company, or its management, are intended to identify 

such  forward‐looking  statements.  Although  the  Company  believes  the  expectations  expressed  in  such 

forward‐looking information are based on reasonable assumptions, such information is not a guarantee of 

future  performance  and  actual  results  or  developments  may  differ  materially  from  those  contained  in 

forward‐looking information. Information provided in this document is necessarily summarized and may not 

contain all available material information. Although Pacific Rim Cobalt has attempted to identify important 

factors  that  could  cause  actual  results,  performance  or  achieve ments  to  differ  materially  from  those 

contained in the forward‐looking statements, there can be other factors that cause results, performance or 

achievements not to be as antici pated, estimated or intended. F actors that could cause actual results to 

differ materially from those in f orward‐looking information inc lude, but are not limited to, fluctuations in 

market prices, success of the operations of the Company, continued availability of capital and financing and 

general economic, market or business conditions.  There can be  no assurances that such information will 

prove accurate and, therefore, readers should not place undue reliance on forward‐looking statements. The 

forward‐looking  statements  in  this  news  release  are  made  as  of t h e  d a t e  o f  t h i s  n e w s  r e l e a s e ,  a n d  t h e  

Company does not assume any obligation to update any forward‐lo oking information except as required 

under the applicable securities laws. 

Neither the Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the 

policies  of  the  Canadian  Securities  Exchange)  accepts  responsibility  for  the  adequacy  or  accuracy  of  this 

release.