Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BOLT.CN ·

Pacific Rim Cobalt step-out drilling returns up to 1.91% nickel and 0.22% cobalt over 5 metres

Drill Results

Pacific Rim Cobalt step‐out drilling returns up to 1.91% nickel and 0.22% cobalt over 5 metres 

Vancouver, B.C. – April 1, 2019  –  Pacific Rim Cobalt Corp. (t he “Company” or “Pacific Rim Cobalt”) (CSE: 

BOLT) (OTCQB: PCRCF) (FRANKFURT: NXFE) is pleased to announce r esults from its ongoing 2019 drilling 

program at its flagship Cyclops, nickel/cobalt development project, Indonesia. 

Drilling continues to confirm shallow intersections from surfac e with elevated cobalt up to 0.25% in the 

limonite zone and nickel values of 1.91% in the underlying transition and saprolite zones. A total of 29 holes 

for a total of 402 metres (m) have now been completed. 

Highlights from the latest drilling results include: 

Hole  From (m)  To (m)  Length (m)  Nickel (%)  Cobalt (%)  NiE Q1(%)  Cutoff Grade (%) 

DD265  0  1  1  0.53  0.06  0.68  0.05 Co 

And  1  7  6  1.75  0.03  1.82  1.00 Ni 

Including  1  6  5  1.91  0.03  1.98  1.50 Ni 

DD266  0  5  5  1.12  0.22  1.66  0.05 Co 

And  5  9  4  0.92  0.04  1.02  0.50 Ni 

Including  5  7  2  1.26  0.06  1.41  1.00 Ni 

* All drill intersections reported in this press release are true widths 

KEY POINTS 

 Drilling consistently confirming elevated nickel and cobalt values 

 Shallow mineralization from surface to maximum depths of 12m 

 2019 drilling to date was focused on delineation of the eastern boundary of mineralization 

 Exploration to progressively expand to the west into core mineralized areas 

 Resource estimate expected in late 2019 

 Exploration funding in place for balance of 2019 

“The strong drill results from an area that is historically underexplored indicates there’s room for expansion 

of the mineralization footprint at Cyclops”, remarked Ranjeet S undher, Chief Executive Officer of Pacific 

Rim  Cobalt.  “We  will  soon  be  focused  in  core  areas  of  the  project  where  drilling  the  full  depth  of  the 

mineralized horizons may provide further evidence of its true size potential.”   

Indonesia is nickel 

One  of  the  world's  largest  sources  of  nickel  production  by  natio n  i s  I n d o n e s i a .  T h e  c o u n t r y  i s  r i c h  w i t h  

deposits of the metal, many of which have yet to be effectively exploited. 

The dominant source of nickel in country is laterite deposits w hich are composed of long, shallow tabular 

bodies. The company's Cyclops project is such an occurrence. 

Indonesia’s large nickel laterite ore reserves ‐ prized for nic kel pig iron used in sta inless steel production ‐ 

are also a vital ingredient for lithium‐ion batteries used to power EVs. (Reuters) 

Other laterite projects in the region include MMC’s $2.1 billion Ramu nickel mine in Papua New Guinea @ 

1 . 0 %  n i c k e l ;  E R A M E T ’ s  W e d a  B a y  @  1 . 3 6  %  n i c k e l ;  a n d  A N T A M ’ s  G a g  island  @  1.63%  nickel,  both  in 

Indonesia. 

The  Cyclops  Project  area  located  in  Papua  Province,  Indonesia, benefits  from  excellent  infrastructure, 

including proximity to a work force and supplies, sealed roads, ocean access, nearby port facility, and gentle 

topography. The road system enables year‐round access to the project and connects it with the large town 

of  Sentani,  located  about  15  kilometres  (km)  to  the  east,  and  with  Jayapura,  the  capital  city  of  Papua 

province, located about 40 kms to the east. 

Additional drill results include: 

Hole ID  From (m)  To (m)  Length (m)  Nickel %  Cobalt %  NiEQ1 %  Cutoff Grade (%) 

DD239  0  3  3  0.92  0.12  1.21  0.05% Co 

And  3  13  10  0.90  0.02  0.95  0.5% Ni  

Including  3  9  6  1.09  0.02  1.14  1% Ni             

DD201  0  2  2  0.89  0.09  1.11  0.05% Co 

And  2  7  5  1.58  0.04  1.68  1% Ni  

Including  2  5  3  1.91  0.05  2.03  1.5% Ni            

DD202  0  4.8  4.8  0.91  0.16  1.30  0.05% Co            

DD262  0  7  7  0.84  0.16  1.23  0.05% Co 

And  7  12  5  0.96  0.02  1.01  0.5% Ni  

Including  7  10  3  1.18  0.02  1.23  1% Ni  

Including  7  8  1  1.51  0.02  1.56  1.5% Ni            

DD263  0  3  3  0.85  0.11  1.12  0.05% Co 

And  3  5  2  1.07  0.03  1.14  0.5% Ni  

Including  3  4  1  1.14  0.05  1.26  1% Ni             

DD264  1  3  2  1.42  0.25  2.03  0.05% Co 

And  3  8  5  1.10  0.04  1.20  0.5% Ni  

Including  3  6  3  1.38  0.06  1.53  1% Ni  

Including  3  5  2  1.54  0.09  1.76  1.5% Ni 

1NiEQ calculation basis: cobalt price per 3 months (LME data) $32/kg; nickel price per 3 months (LME data) $13.07/kg 

C = ratio between cobalt price/nickel price; C = $32/$13.07 = 2 .44; NiEQ = (%Co x C) + % Ni. No metallurgical recoveries were 

applied to either metal as it is expected that the metallurgical recoveries will be similar for both metals. 

Sample Processing 

All drilling results discussed in the press release are JORC co mpliant with all protocols in place 2. Assaying 

was completed at the Geo Assay Laboratory ‐ PT. Geoservices, Cikarang, Jakarta. The Geo Assay Laboratory 

analysed the samples using the XRF fusion method. PT Geoservice s Ltd ‐ Geo Assay Laboratory employed 

industry standard internal QA/QC methods that Pacific Rim Cobalt reviewed and found acceptable. 

2JORC  compliant  exploration  drilling  and  sample  procedure  protoc ols  include:  insertion  of  blank  and 

certified samples; photographing and weighing of core; recordin g of recovery %; samples half cored with 

the balance retained for further analysis if required; sample i ntervals of 1m; sample recovery is core; all 

drill location and elevations recorded. 

National Instrument 43‐101 Disclosure  

The  technical  content  of  this  news  release  has  been  reviewed  and  approved  by  Mr.  Garry  Clark,  PGeo, 

independent director of Pacific Rim Cobalt and a Qualified Pers on as defined by National Instrument 43‐

101. 

About Pacific Rim Cobalt 

Pacific Rim Cobalt is a Canadian‐based exploration company focu sed on the acquisition and development 

of production grade nickel and cobalt deposits, key raw material inputs for the growing lithium‐ion battery 

industry. Visit https://pacificrimcobalt.com/ to find out more.  

Pacific Rim Cobalt Corp. 

Ranjeet Sundher – President and CEO 

(604) 922‐8272 

[email protected] 

Steve Vanry – CFO & Director 

(604) 922‐8272 

[email protected] 

Sean Bromley – Director & Investor Contact 

(778) 985‐8934 

[email protected] 

Reader Advisory 

This news release may contain statements which constitute “forward‐looking information” that are subject 

to  risks  and  uncertainties.  All  statements  herein,  other  than  s tatements  of  historical  fact,  are  to  be 

considered  forward‐looking,  including  statements  regarding  the  plans,  intentions,  beliefs  and  current 

expectations of the Company, its directors, or its officers with respect to the future business activities of the 

Company  and  with  respect  to  the  results  of  exploration  and  prospective  plans  in  regards  to  the  Cyclops 

project.  The  words  “may”,  “would”,  “could”,  “will”,  “intend”,  “plan”,  “anticipate”,  “believe”,  “estimate”, 

“expect” and similar expressions, as they relate to the Company, or its management, are intended to identify 

such  forward‐looking  statements.  Although  the  Company  believes  the  expectations  expressed  in  such 

forward‐looking information are based on reasonable assumptions, such information is not a guarantee of 

future  performance  and  actual  results  or  developments  may  differ  materially  from  those  contained  in 

forward‐looking information. Information provided in this document is necessarily summarized and may not 

contain all available material information. Although Pacific Rim Cobalt has attempted to identify important 

factors  that  could  cause  actual  results,  performance  or  achieve ments  to  differ  materially  from  those 

contained in the forward‐looking statements, there can be other factors that cause results, performance or 

achievements not to be as antici pated, estimated or intended. F actors that could cause actual results to 

differ materially from those in f orward‐looking information inc lude, but are not limited to, fluctuations in 

market prices, success of the operations of the Company, continued availability of capital and financing and 

general economic, market or business conditions.  There can be  no assurances that such information will 

prove accurate and, therefore, readers should not place undue reliance on forward‐looking statements. The 

forward‐looking  statements  in  this  news  release  are  made  as  of t h e  d a t e  o f  t h i s  n e w s  r e l e a s e ,  a n d  t h e  

Company does not assume any obligation to update any forward‐lo oking information except as required 

under the applicable securities laws. 

Neither the Canadian Securities Exchange nor its Regulation Services Provider (as that term is defined in the 

policies  of  the  Canadian  Securities  Exchange)  accepts  responsibility  for  the  adequacy  or  accuracy  of  this 

release.