Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BNZ.V ·

Bonanza Mining Corporation announces Closing of Private Placement and Mobilization of a Drill to the Shag Property

Financings

Bonanza Mining Corporation

Suite 105-1008 Beach Avenue

Vancouver, B.C.

V6E 1T7

Trading Symbol: TSX-V: BNZ

Email: [email protected] and

[email protected]

Telephone: 604-619-0225

Fax: 604-980-6264

Website: www.bonanzamining.com

Bonanza Mining Corporation announces Closing of Private Placement and Mobilization of a Drill to the Shag

Property

October 31, 2022 – Vancouver, British Columbia : Bonanza Mining Corporation (“Bonanza”) (TSX-V: BNZ)

announces the following:

Closing of Private Placement

The closing of the following private placement, as originally announced on September 20, 2022:

(a) 3,000,000 flow-through units at a price of $0.10 per unit, for gross proceeds of $300,000 (an increase

from the $250,000 announced in the September 20, 2022 news release), whi ch will qualify for the

30% Critical Mineral and Exploration Tax Credit (“CMETC”), each flow -through unit consisting of

one CMETC eligible flow -through share and one share purchase warrant, with each warrant entitling

the holder to purchase one additional common share at a price of $0.15 until October 27, 2024; and

(b) 636,000 ordinary units at $0.07 per unit, for gross proceeds of $44,520, each unit consisting of one

common share and one share purchase warrant, with each warrant entitling the holder to pu rchase one

additional common share at a price of $0.15 until October 27, 2024.

Bonanza paid the following compensation to Leede Jones Gable Inc in connection with the closing of this private

placement:

(a) cash consideration of $4,500;

(b) the issuance of 48,000 common shares at a deemed price of $0.10 per share; and

(c) the issuance of 93,000 finder warrants, each entitling the holder to purchase one common share at a

price of $0.15 until October 27, 2024.

All shares issued pursuant to th is private placement, including any shares that may be issued pursuant to the exercise

of the warrants forming part of the flow -through units, the ordinary units or the finder warrants, are subject to a hold

period in Canada until February 28, 2023.

Mobilization of a Drill to the Shag Property

The Shag property is situated in the Rocky Mountains of southeastern B ritish Columbia approximately 24 km due

east of Radium Hot Springs and 35 km northeast of the town of Canal Flats and can be readily accesse d by good

logging roads from both of th ose towns. It hosts twenty separate l ead, zinc and silver strataform MVT style

mineral occurrences hosted within three separate horizons in middle Cambrian age dolostone formations along

a carbonate platform to shale basin transgressive-regressive reef complex margin.

The style of lead -zinc mineralization on the Shag property and its geological basin margin setting are similar to the

NWT Pine Point district lead-zinc mineralization that is also within a transgressive /regressive barrier reef complex

2

along a shale basin margin. At Pine Point numerous deposits were formed in Devonian age carbonate rocks above a

basement fault named the Great Slave Shear Zone.

There are three zinc-lead mineralized transgressive – regressive carbonate horizons known on the Shag property that

occur in the Eldon and Waterfowl formations which are well exposed on the property higher in the stratigraphic

section deeper than the Cathedral formation . The Cathedral formation hosts the past producing Monar ch and Kicking

Horse zinc–lead mines ~100 km along strike near Field , British Columbia and is the most prospective middle

Cambrian formation in the district.

On the Shag property only the uppermost beds of the prospective Cathedral formation are exposed in the Albert river

valley where 3DIP and seismic surveys were conducted in 2021 and it does not outcrop elsewhere on the property. The

main purpose of those surveys was to locate the top and the base of the Cathedral formati on and potential zinc -lead

mineralized targets in the blind, subsurface Cathedral formation for drill testing.

A diamond drill has been mobilized to the Shag property to core initial drill holes that will test previously reported

coincident 3D IP chargeability and seismic anomalies that were discovered in 2021 by a 3D IP survey and a separate

vibroseis seismic survey along the Albert river valley.

The 3D IP survey was conducted by SJ Geophysics Ltd and consisted of surveying 11.9 line km along 7 survey lines

spaced 150 meters apart and between 700 meters and 2,500 m eters long with a station spacing of 50 meters. The IP

survey located 3 separate high chargeability anomalies named the Southwest, Central and Northeast anomalies.

The Southwest chargeability anomaly defines an area measuring 1,000 m eters in length and 400 meters i n width that

is made up of three separate high chargeability bodies C1, C2 and C3. The C2 anomaly is a large target over 400

meters thick verticall y and 600 meters nort h-south by 375 meters east -west and the initial drill holes are designed to

test this chargeability target.

The vibroseis seismic survey consisted of one seismic line 7 km long that was run along the Albert river forest service

road across the northern part of the Shag property passing through the 3D IP survey grid.

Interpretation of the high quality seismic imaging data effectively imaged the major components of a multi cycle

middle Cambrian platform margin reef environment and the Cathedral carbonate formation shows an excellent

sequence of migrating reef building eastward from the Chancellor formation shale basin on the western side of the

Shag property.

Three interpreted reef crest seismic anomalies A1, A2 and B1 were outlined and are considered to be primary locales

for lead-zinc deposition and they all lie within the Cathedral formation . Seismic anomaly A1 correlates well with the

location of the Southwest high chargeability IP target C2 and supports the interpretation that it is a high priority drill

target.

Qualified Person

Technical information in this news release has been approved by Christopher Graf, P. Eng., the Vice -President

Exploration, as well as a Director of Bonanza and a Qualified Person for the purposes of National Instrument 43-101.

3

For further information, please contact:

Bonanza Mining Corporation

Suite 105-1008 Beach Avenue,

Vancouver, B.C. V6E 1T7

Attention: Alfredo De Lucrezia, President,

CEO and Director

Tel: (604) 619-0225

Email: [email protected]

or

Chris Graf, Vice President, Exploration

Tel: 250-429-3572

Email:[email protected]

Cautionary Statements

This press release contains "forward-looking information" within the meaning of applicable securities laws. Readers

are cautioned to not place undue reliance on forward -looking information. Actual results and developments may

differ materially from those contemplated by these statements. The statements in this press release are made as of the

date of this press release. Bonanza undertakes no obligation to update forward-looking information, except as

required by securities laws.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this press release