Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BMV.V ·

Bathurst Metals Corp. Obtains Water Permit for Diamond Drilling the Turner Lake Project,

Permits & Approvals

September 29, 2022 TSX-V: BMV /OTC: BMVVF

Bathurst Metals Corp. Obtains Water Permit for Diamond Drilling the Turner Lake Project,

Nunavut, Canada.

VANCOUVER, BRITISH COLUMBIA – (September 29, 2022) – Bathurst Metals Corp. (the “Company”)

announces it has been awarded the required water permit for diamond drilling on the Turner Lake

Project.

The water permit is good for three (3) years and a requirement for surface diamond drilling.

The five (5) year drill permit application is nearing completion and will be finalized once the required

reclamation bond payment has been received.

About the Turner Lake Project

The Turner Lake project area covers 7,071.97 hectares, which also contains the Main, East and TED

gold zones and the Nickel Knob, massive sulphide mineral deposits.

The Main and East gold zones are hosted along a classic Archean age iron/magnesium

tholeiitic contact with gold mineralization occurring mainly within a crackle fractured greywacke.

The TED showing occurs in an Archean Age iron formations hosting several +20 gram/tonne

gold values in grab samples in area that has not been drill tested.

Visible gold is common in the Main and TED gold zones.

The East gold zone is approximately two kilometres east of the Main gold zone along the same

strike. Grab rock samples have returned up to 31.0 grams per tonne gold and the zone has not

been drill tested.

Discovered in the 1960s, the Main gold zone has only had 22 diamond drill holes test across the

contact from Chevron Minerals in 1986 to 1989 and Northrock Resources Inc. in 2008/2009. Historical

diamond drilling results include from Chevron Minerals:

 28.00 g/t Au over 4.75 metres;

 12.86 g/t Au over 8.87 metres;

 15.20 g/t Au over 4.00 metres;

 10.00 g/t Au over 4.00 metres.

Northrock Resources diamond drilling results included:

 13.20 g/t Au over 13.00 metres;

 22.54 g/t Au over 12.00 metres;

 16.20 g/t Au over 8.50 metres.

* All lengths presented are core lengths.

The Nickel Knob massive sulphide deposit is approximately 1.9 kilometres south of the Main

gold zone and has had only limited drill testing consisting of five diamond drill holes. All holes

encountered massive sulphides with the best intercept recorded being 1.81 per cent copper,

1.64 per cent nickel over a 14.0-metre core length.

Harold Forzley, chief executive officer and director of Bathurst Metals, commented: " Based on our

previous fieldwork results the company is preparing to commence preparations on the 2023 extensive

diamond drilling campaign on our flagship Turner Lake Main zone. Bathurst Metals has a strong

34,690-hectare portfolio of 100-per-cent-owned properties in Nunavut employing experienced

geotechnical staff familiar with Northwestern Nunavut."

Qualified person

Lorne Warner, PGeo, is a qualified person as defined by National Instrument 43-101 and has reviewed

and approved the scientific and technical disclosure in this news release.

On behalf of the Board of Directors

“Harold Forzley”

CEO

Bathurst Metals Corp.

For more information contact Harold Forzley, CEO

Neither TSX Venture Exchange nor its regulation services provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this

release.

Forward Looking Statements

Certain of the statements made and information contained herein may contain forward- looking

information within the meaning of applicable Canadian securities laws. Forward-looking information

includes, but is not limited to, information concerning the Company’s intentions with respect to the

development of its mineral properties. Forward-looking information is based on the views, opinions,

intentions and estimates of management at the date the information is made, and is based on a number

of assumptions and subject to a variety of risks and uncertainties and other factors that could cause

actual events or results to differ materially from those anticipated or projected in the forward-looking

information (including the actions of other parties who have agreed to do certain things and the

approval of certain regulatory bodies). Many of these assumptions are based on factors and events that

are not within the control of the Company and there is no assurance they will prove to be correct. There

can be no assurance that forward-looking information will prove to be accurate, as actual results and

future events could differ materially from those anticipated in such information. The Company

undertakes no obligation to update forward-looking information if circumstances or management’s

estimates or opinions should change except as required by applicable securities laws, or to comment

on analyses, expectations or statements made by third parties in respect of the Company, its financial

or operating results or its securities. The reader is cautioned not to place undue reliance on forward-

looking information.