Battery Mineral Resources Announces Encouraging Drill Results from Its Punitaqui Copper MINE IN Chile
{02149511.2}
BATTERY MINERAL RESOURCES ANNOUNCES ENCOURAGING DRILL RESULTS FROM ITS
PUNITAQUI COPPER MINE IN CHILE
Vancouver, British Columbia – (October 3rd, 2024) – Battery Mineral Resources Corp. (TSXV:
BMR) (OTCQB: BTRMF) ("Battery" or “BMR” or the "Company") is pleased to announce
encouraging drill core assay results from the new 2024 underground exploration and in-fill
drill program in the Cinabrio mine at the Punitaqui mine complex (“Punitaqui”) in Chile.
Highlights
• Assay results from drillholes (see Table 1) have returned with encouraging results as
follows:
o Drillhole CM-24-04: 6.9 meters (“m”) at 0.65% (“CuT”) total copper and
2.1g/t grams per tonne (“Ag”) silver.
o Drillhole CM-24-06: 3.9m grading 1.9% CuT & 5.3g/t Ag.
o Drillhole CM-24-07: 8.4m grading 0.7% CuT & 1.2g/t Ag.
o Drillhole CM-24-08: 4.4m grading 1.3% CuT & 4.9g/t Ag.
o Drillhole CM-24-09: 9.9m grading 0.8% CuT & 2g/t Ag
o Drillhole CM-24-15: 10.2m grading 2.6% CuT & 10.5g/t Ag
o Drillhole CM-24-16: 10.8m grading 2.5% CuT & 9.7g/t Ag
o Drillhole CM-24-17: 1.4m grading 1.2% CuT & 4.1g/t Ag
Note: All Intercepts reported as estimated true widths intervals
• This drilling confirmed copper grades and better delineated the extent of the
mineralization in the lower shale unit and footwall andesite within and adjacent to the
planned production area.
• This phase of Cinabrio underground drilling targeted the Level 135 scheduled
production areas situated both above and below the level. Ten drillholes totaling 389.9
meters of diamond core drilling were completed (see Table 2 and Figure 1).
• Nine of the ten holes were designed to confirm the modelled geology, mineralization
and probe the contact zone between the lower mineralized shale unit and the
underlying andesites within and adjacent to the planned production area. Drillhole CM-
24-10 was drilled to test for possible fault offsets of the mineralized horizons north of
the planned production area.
• The 2024 Cinabrio drill program is designed to confirm mineralization identified by
previous drilling programs and test for extensions along strike and at depth. All 10
holes drilled from the Level 135 reached target depth.
- 2 -
{02149511.2}
1381-9958-8110, v. 1
• These drill results have been added to the three-dimensional geology and resource
models which BMR’s mining engineers use to update the current mine designs and
optimize mining schedules.
• As of late -September, the Cinabrio-San Andres underground drill program had
resulted in the completion of 33 drillholes / 1,440.8m including 21 holes / 910.6m
at Cinabrio.
• Drilling is ongoing and assay results for the recently completed San Andres and
Cinabrio drillholes are pending.
Battery VP Exploration Peter Doyle states; “We are excited to announce these new promising
copper intercepts. This latest set of drill results not only confirms the copper grades but also
enhances our understanding and accuracy of the current geological model.”
During the current operational ramp-up period, the underground drilling program is focused
on accessible targets within existing Inferred Resource to upgrade the resources to a higher
resource category as well as targeting areas adjacent to Inferred Resource to potentially add
new resources.
The 2024 drill plan allows for some flexibility in terms of timing and sequencing of target areas
which permits the drilling to be shifted between the Cinabrio mine and the adjacent San
Andres underground.
Cinabrio Mine
Sample assay results, reported herein, are from planned production targets above and below
Level 135 in the Cinabrio mine. These 10 drill holes are infill and extension holes designed to
verify and better delineate mineralization targeted for production from planned production
areas above and below Level 135. Six of the holes (CM-24-04 to CM-24-08 and CM-24-10)
were drilled as up-holes targeting a planned production area above Level 135 while the
remaining 4 holes (CM-24-09, CM-24-15 to CM-24-17) were drilled as down holes targeting a
planned production area below the level.
Drillhole CM-24-04 was designed as an infill hole to test the northern part of the planned
production area above Level 135. The drillhole was drilled from the footwall andesites up
through to the targeted sedimentary unit (“TSU”) and into the overlying andesitic flow breccia.
Copper mineralization was intersected in a magnetite-rich zone in the footwall andesite from
0m to 17.7m. Estimated true with assays intervals reported include 6.9m grading 0.65% CuT
and 2.1g/t Ag that includes a 2.7m grading 1.0% CuT and 5.1g/t Ag result. The drillhole
intersected TSU sequence between 17.6m to 27.4m however, the TSU sequence is only
weakly mineralized.
Drillhole CM-24-05 was designed as an infill hole to test the upper north central portion of the
planned production area above Level 135. The drillhole collared in the footwall andesites
followed by the TSU sedimentary unit and was shut down in the overlyi ng andesitic flow
breccia. Mineralization was intersected in a magnetite-rich zone hosted within the footwall
andesite from 5.6m to 11.4m and in the TSU sedimentary sequence from 11.4m to 19.1m.
- 3 -
{02149511.2}
1381-9958-8110, v. 1
Estimated true width assay intervals reported include 4.4m grading 0.37% Cu and 0.7g/t Ag
and 4.5m at 0.33% Cu and 0.6g/t Ag which confirmed the copper grades in the target area.
Drillhole CM-24-06: an infill hole, was designed to test the central part of the planned
production area above Level 135. The drillhole was drilled from the footwall andesites up
through to the TSU sedimentary unit and into the overlying flow breccia. Mineralization was
intersected in a magnetite-rich zone footwall andesite from 5.4m to 10.1m. An estimated true
width assay interval of 3.9m grading 1.92% Cu and 5.3g/t Ag was reported. The drillhole
confirmed the grade mineralization in the central portion of the planned production area.
Drillhole CM-24-07: was designed as an extensional hole to test the north end of the planned
production area above Level 135. The drillhole intersected variably mineralized magnetite-
rich footwall andesites from 0m to 25.2m. From 25.2m to 34.38 the hole in tersected an
andesitic dyke and then passed into hanging wall flow breccia from 34.3m to end of hole at
56.7m. An estimated true width assay interval of 8.4m grading 0.69% CuT and 1.2g/t Ag was
reported and included 2.1m at 1.28% CuT and 3.2g/t Ag. Results of this hole confirm the TSU
sedimentary sequence has been offset by a fault and intruded by an andesite dyke.
Drillhole CM-24-08, an infill hole was designed to test the southern part of the planned
production area above Level 135. The drillhole collared in the footwall andesites, followed by
the TSU sediments and was terminated in the overlying flow breccia. Mine ralization was
intersected in a magnetite-rich zone in the footwall andesite from 0m to 10m and strong
copper mineralization was intersected in the overlying shale horizon from 10m to 14.6m.
Estimated true width assay intervals reported include 4.4m grading 1.33% CuT and 4.9g/t Ag
in the shale horizon.
Drillhole CM-24-09 was planned as an infill hole to test the north central part of the planned
stope area. The sequence drilled started in the footwall andesites and drilled up -section
through the TSU sedimentary unit and into the overlying andesitic flow breccia. Mineralization
was intersected both in the footwall andesite from 12.45m to 20.75m and in the TSU
sequence from 20.75m to 29.9m. Estimated true width assay intervals reported include 9.9m
grading 0.75% CuT and 2.0g/t Ag. This assay interval includes both the magnetite-rich zone
in the footwall andesite and sediment hosted mineralization. The drillhole confirmed the grade
and extent of the mineralization in the planned extraction area.
Drillhole CM-24-10 was designed as an extensional hole to explore for potential for an
interpreted faulted offset of the sedimentary horizon northwest of the planned production
area. The drillhole collared in and cut 6.4m of andesitic dyke followed by hanging flow breccia
to 25.45m. An andesitic dyke was intersected from 25.45m to 40.45m. The drill results
confirm the faulted offset of the sedimentary unit does not exist in the area tested.
Drillhole CM-24-15, an infill hole, was designed to test the central part of the planned
production area below Level 135. The drill hole was drilled from the hanging wall andesitic
flow breccia, down through a shale sandstone sequence and into the footwall andesites.
Mineralization occurred in the sedimentary units from 6.2m to 12.4m and in the footwall
andesite from 12.4m to 20.5m. Estimated true width assay intervals reported include 10.2m
grading 2.62% CuT and 10.5g/t Ag. This interval includes both the magnetite zone in the
- 4 -
{02149511.2}
1381-9958-8110, v. 1
footwall andesite and sediment hosted mineralization. Drillhole CM-24-15 is 20m north of
2012 drillhole CM-0-12-01 which returned an estimated true width interval of 6.6m at 2.58%
CuT and 13.7g/t Ag. This new hole confirmed the presence of mineralization in the planned
extraction area.
Drillhole CM-24-16, an infill hole was planned to test the central part of the planned
production area below Level 135. The drillhole was drilled from the hanging wall andesitic
flow breccia, through the shale-sandstone sequence and into the footwall andesites. Copper-
magnetite mineralization occurred in the sedimentary units from 6.2m to 12.4m and in the
underlying andesite. Estimated true width assay intervals reported include 10.8m at 2.58%
CuT and 9.7g/t Ag. Drill hole CM-24-15 confirmed the continuity of mineralization in the
planned extraction area.
Drillhole CM-24-17 was designed to test the southern end of the planned stope area below
level 135 and confirm the results of historic drillhole CM-0-12-01 that cut 6.6m (estimated
true width) grading 2.58% CuT and 13.7g/t Ag. The current drillhole collared in the hanging
wall andesitic flow breccia, through a shale-sandstone of the TSU sedimentary sequence and
into the footwall andesites. Variable mineralization occurred in the sedimentary units from
11.4 to 21.8. Estimated true width assay intervals reported include 1.8m grading 0.67% CuT
and 1.1g/t Ag and 1.4m m at 1.24% CuT% and 4.1 g/t Ag. Drill hole CM-24-17 confirmed the
presence of mineralization in the planned extraction area.
Figure 1: Cinabrio Drilling Hole Location Plan- Level 135
- 5 -
{02149511.2}
1381-9958-8110, v. 1
Table 1: Cinabrio Level 135 Significant Drillhole Intercepts
Drillhole
Number
Downhole
Interval
From
(m)
Downhole
Interval
To
(m)
Downhole
Sample
Interval
(m)
Sample
Estimated
True Interval
Width
(m)
Total
Copper
CuT
(%)
Silver
Ag
(Grams per
tonne)
(g/t)
CM-24-04
10.00 17.60 7.60 6.90 0.65 2.10
Including 11.00 14.00 3.00 2.70 1.00 5.10
CM-24-05 5.60 10.10 4.50 4.40 0.37 0.70
CM-24-06 5.40 10.10 4.70 3.90 1.92 5.30
CM-24-07 13.00 25.20 12.20 8.40 0.69 1.20
including 13.00 16.00 3.00 2.10 1.28 3.20
and 20.00 25.20 5.20 3.60 0.78 0.60
CM-24-08 10.10 14.60 4.50 4.40 1.33 4.90
CM-24-09 12.45 30.90 18.45 9.90 0.75 2.00
including 20.75 30.90 10.15 5.50 0.89 2.80
CM-24-10 NO SIGNIFICANT RESULTS
CM-24-15 6.20 20.50 14.30 10.20 2.62 10.50
including 12.40 15.40 3.00 2.50 9.22 40.70
CM-24-16 12.90 28.40 15.50 10.80 2.58 9.70
CM-24-17 11.40 15.40 3.00 1.80 0.67 1.10
and 19.40 21.80 2.40 1.40 1.24 4.10
Note: All Intercepts reported as estimated true widths intervals
Table 2: Cinabrio Level 135 Drillhole Summary
Hole
Number
Collar UTM
Easting (m)
Collar UTM
Northing (m)
Collar
Elevation
(mASL)
Depth
EoH
(m)
Hole
Inclination
(Dip)
Azimuth Hole
Type & Size
CM-24-04 288624.39 6599710.10 137.08 48.35 23.32 39.79 Diamond HQ Core
CM-24-05 288624.37 6599710.37 135.55 61.1 33.11 74.13 Diamond HQ Core
CM-24-06 288624.95 6599706.32 138.15 25.2 40.18 110.91 Diamond HQ Core
CM-24-07 288624.46 6599710.17 136.86 56.7 9.97 25.09 Diamond HQ Core
CM-24-08 288634.47 6599688.44 137.64 25.2 38.07 69.34 Diamond HQ Core
CM-24-09 288634.73 6599688.65 135.88 40.6 -16.55 62.16 Diamond HQ Core
CM-24-10 288657.17 6599733.75 135.85 40.45 -1.17 59.47 Diamond HQ Core
CM-24-15 288680.72 6599683.94 134.78 25.30 -62.88 265.04 Diamond HQ Core
CM-24-16 288680.50 6599686.84 135.26 35.80 -32.71 299.46 Diamond HQ Core
CM-24-17 288681.00 6599682.69 134.70 31.00 -45.88 179.73 Diamond HQ Core
- 6 -
{02149511.2}
1381-9958-8110, v. 1
Background – Cinabrio Deposit
The Cinabrio copper deposit mined by Glencore and Xiana Mining was the main ore source for
the Los Mantos processing plant for over 10 years. Cinabrio is the largest deposit mined to
date and is part of the Punitaqui project. The Project is situated within a 25km long
mineralized district that is a classic IOCG and manto style copper belt, comprised of manto
and structural controlled copper-silver veins.
On October 3, 2022, BMR published an NI 43-101 resource for Cinabrio at a 0.70 Cu% cut-
off.
• Indicated Sulphide Resource of 378,000 tonnes grading 1.55% CuT.
• Inferred Sulphide Resource of 90,000 tonnes at 0.98% CuT
In addition, indicated resources in potentially recoverable pillars at Cinabrio reported at a 0.70
Cu% cut-off.
• Undiluted Indicated resources of 1,027,000 tonnes at grading 1.51% CuT
• Diluted Indicated resources of 1,312,000 tonnes at 1,27% CuT
Note: Scientific and technical information pertaining to the San Andres Resource was extracted from the
Company’s NI 43-101 “Technical report on Punitaqui Copper Complex Coquimbo, Chile” dated as of
September 30,2022 with an effective date of August 16, 20 22, prepared by Garth Kirkham (Kirkham
Geosystems Ltd.) an Independent Qualified Person in accordance with NI 43-101.
The Cinabrio deposit is a tabular sedimentary horizon known as the “Targeted Stratigraphic
Unit” (“TSU”) within a volcanic sequence. This sedimentary horizon is variably mineralized and
has a variable width ranging from 5m - 30m. It consists of an interlayered volcano-sedimentary
sequence composed of dark colored laminated and unlaminated shales, volcanoclastic
sandstone, conglomerates and breccias and tuff breccias. Most of the copper mineralization
is hosted in the shale units within the TSU package. The horizon dips at 40 to 50 degrees to
the east.
Mineralization consists of veinlets and irregular disseminations in both the fine and coarse-
grained clastic rocks and locally within the volcanic rocks above and below the host unit. The
host horizon is also cut and offset by faults and dykes with a wide range of orientations.
Quality Control
Sample preparation, analysis and security procedures applied on the BMR exploration
projects are aligned with industry best practice. BMR has implemented protocols and
procedures to ensure high quality collection and management of samples resulting in reliable
exploration assay data. BMR has implemented formal analytical quality control monitoring for
all field sampling and drilling programs by inserting blanks and certified reference materials
into every sample sequence dispatched.
Sample preparation is performed BMR Los Mantos Preparation Lab. Samples are dried then
crushed to 70% < -2 millimeters and a riffle split of 250 grams is then pulverized to 85% of
the material achieving a size of <75 microns. Sample pulps & rejects were then delivered to
- 7 -
{02149511.2}
1381-9958-8110, v. 1
ALS Global - Geochemistry Analytical Lab in La Serena, Chile and sample analyses by ALS in
Lima, Peru. ALS analytical facilities are commercial laboratories and are independent from
BMR. All BMR samples are collected and packaged by BMR staff and delivered upon receipt
at the ALS Laboratory. Samples are logged in a sophisticated labor atory information
management system for sample tracking, scheduling, quality control, and electronic reporting.
These prepared samples are then shipped to the ALS Laboratory i n North Vancouver for
analyses by the following methods:
• ME-MS61: A high precision, multi-acid digest including Hydrofluoric, Nitric, Perchloric
and Hydrochloric acids. Analysed by inductively coupled plasma (“ICP”) mass
spectrometry that produces results for 48 elements.
• ME-OG62: Aqua-Regia digest: Analysed by ICP-AES (Atomic Emission Spectrometry) or
sometimes called optical emission spectrometry (ICP-OES) for high levels of Co, Cu, Ni
and Ag.
Certified standards are inserted into sample batches by ALS. Blanks and duplicates are
inserted within each analytical run. The blank is inserted at the beginning, certified standards
are inserted at random intervals, and duplicates are analysed at the end of the batch.
Qualified Persons
Peter Doyle, Vice President of Exploration and Michael Schuler, Chile Exploration Manager for
Battery Mineral Resources Corp., supervised the preparation of and approved the scientific
and technical information in this press release pertaining to the Punitaqui exploration drill
program. Mr. Doyle and Mr. Schuler are qualified persons as defined by National Instrument
43-101 - Standards of Disclosure for Mineral Projects.
Scientific and technical information pertaining to the Punitaqui Resource was extracted from
the Company’s NI 43-101 “Technical Report on Punitaqui Copper Complex Coquimbo, Chile”
dated as of September 30,2022 with an effective date of August 16, 2022, prepared by Garth
Kirkham (Kirkham Geosystems Ltd.) an Independent Qualified Person in accordance with NI
43-101.
All mineral resources have been estimated in accordance with Canadian Institute of Mining
and Metallurgy and Petroleum (“CIM”) definitions, as required under NI 43-101. Cut-off grades
are based on a price of US$3.50/lb copper, US$20/oz silver and several operating costs,
metallurgical recoveries, and recovery assumptions, including a contingency factor.
About Battery Mineral Resources Corp.
Battery Mineral Resources’ mission is to build a mid-tier copper producer and has recently
initiated mine and mill operations at the Punitaqui Mining Complex, a historic copper-gold-
silver producer, in the Coquimbo region of Chile. The Company’s portfolio also consists of two
cobalt assets and one lithium asset located in North America and two graphite assets in South
Korea. The Company is focused on providing shareholders accretive exposure to copper and
the global mega-trend of electrification while being focused on growth through cash-flow,
exploration, and acquisitions in favorable mining jurisdictions.
- 8 -
{02149511.2}
1381-9958-8110, v. 1
For more information about Battery Minerals, please visit our website at, https://bmrcorp.com
or email us at [email protected].
For more information, please contact:
Martin Kostuik, CEO
Phone: +1 (604) 628-1110
Twitter: @BMRcorp_
Facebook: Battery Mineral Resources Corp. | Facebook
LinkedIn: Battery Mineral Resources Corp.: My Company | LinkedIn
Neither the TSXV nor its Regulation Services Provider (as that term is defined in the policies
of the TSXV) accepts responsibility for the adequacy or accuracy of this press release.
Forward Looking Statements
This news release includes certain “forward-looking statements” under applicable securities
laws. There can be no assurance that such statements will prove to be accurate, and actual
results and future events could differ materially from those anticipated in such statements.
Forward-looking statements reflect the beliefs, opinions and projections of the Company on
the date the statements are made and are based upon a number of assumptions and
estimates that, while considered reasonable by the Company, are i nherently subject to
significant business, economic, competitive, political and social uncertainties and
contingencies. Many factors, both known and unknown, could cause actual results,
performance, or achievements to be materially different from the results, performance or
achievements that are or may be expressed or implied by such forward-looking statements
and the parties have made assumptions and estimates based on or related to many of these
factors. Such factors include, without limitation, the ability of the Company to obtain sufficient
financing to complete exploration and development activities, risks related to share price and
market conditions, the inherent risks involved in the mining, exploration and development of
mineral properties, the ability of the Company to meet its anticipated development schedule,
government regulation and fluctuating metal prices. Accordingly, readers should not place
undue reliance on forward-looking statements. BMR undertakes no obligation to update
publicly or otherwise revise any forward-looking statements contained herein, whether as a
result of new information or future events or otherwise, except as may be required by law. For
further information regarding the risks please refer to the risk factors discussed in BMR’s
most recent Management Discussion and Analysis filed on SEDAR+.