Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BLDS.V ·

Mineral Mountain to Resume Drilling at Standby

Exploration Programs

MMV-TSX.V

MNRLF-OTCQX

News Release NR 2018 – 07 May 24, 2018

MINERAL MOUNTAIN TO RESUME DRILLING AT STANDBY

(Vancouver, May 24 , 2018 ): Mineral Mountain Resources Ltd. and its subsidiary Mineral

Mountain Resources (SD) Inc. (“Mineral Mountain” or the “Companies”) (TSX.V: “MMV”)

(“OTCQX: MNRLF”) report that the remaining nine (9) holes of a twelve (12) drill program is

scheduled to resume within the next week. Three (3) NQ diamond drill holes , ST18-001, ST18-

002 and ST18 -003 totaling 1,3 22m have been completed on the Companies Standby Mine

Target in the Rochford District in the Black Hills of South Dakota and the analytical results

reported in a news release dated May 3, 2018. Important positive results observed from the first

three holes were that the Au grades and widths encountered in the only very shallow drilling to

date by the Mineral Mountain on the Standby system, along with the consistent 30m widths of

intense quartz flooding – hydrothermal chlorite alteration – remobilized pyrrhotite – arsenopyrite

alteration, are highly encouraging. The more than doubling of gold grade over similar widths,

along with the dramatic increase in arsenopyrite, from ST18-002 to ST18-003, provides a strong

vector toward higher grade gold mineralization down plunge of this section.

The first drill hole, ST18 -004, is planned to undercut the 30m wide mineralized structure

approximately 100m down plunge of ST18-003. In support of this next round of drilling, the

Company plan to utilize a state -of-the art Borehole EM Su rvey (TDEM -Time Domain EM)

designed to locate the highest conductivity zones in the footwall and the hanging wall rocks to

the iron formation, along the major shear structures, to help target our future drilling structurally

low in the iron formation where it is first cut be a mineralized shear structure. At Homestake, this

position is where many of the orebodies are spatially located. This cutting edge survey is planned

to be initiated after the completion of ST18 -004 by Discovery Geophysics International. This

valuable real time survey data will provide precise drill hole locations within the Standby Mine

patents.

Qualified Persons

The technical information in this news release has been prepared in accordance with Canadian

regulatory requirements set out in National Instrument 43 -101 and reviewed and approved by

Nelson W. Baker, P. Eng., President and CEO of Mineral Mountain Resources Ltd. and a

2

Qualified Person for this project. All exploration activities at the Rochford Project are carried

out under the strict supervision of Kevin Leonard, P.Geo. also a Qualified Person for this project.

About Mineral Mountain Resources and the Rochford Gold Project

Mineral Mountain Resources Ltd., through its wholly owned subsidiary Mineral Mountain

Resources (SD) Inc., is focused on the exploration of its 100% -owned Rochford Gold Project

situated along the highly prospective Homestake Gold Belt in the Black Hills of South Dakota,

U.S.A. The Rochford Project covers approximately 7,500 acres and straddles three major trends

of structurally thickened auriferous iron formation that host ledge-type gold mineralization.

Since 2013, the Company has continu ed to expand its land position in the Rochford gold district

by professional claim staking and also by purchasing strategically located private properties that

fall along two of the major sub-parallel structural trends that host Ledge -type gold

mineralization. The Company now owns the largest land position in the Rochford greenstone

belt and now possesses by far the largest and most comprehensive database for the district in

modern day exploration history ! The Rochford Project is vastly under -explored and has t he

potential to host several district scale gold discoveries.

On Behalf of the Board of Directors

MINERAL MOUNTAIN RESOURCES LTD.

“Nelson W. Baker”, President and CEO

For further information, please contact:

Brad Baker, Vice-President Corporate Development & Director

(604) 714-0111 [email protected]

Or visit our website: www.mineralmtn.com

Forward looking information

This release contains “forward-looking information” within the meaning of applicable Canadian securities

legislation (“Forward-looking information”). Forward-looking information includes, but is not limited to,

statements that address activities, events or developments that the Company expects or anticipates will or

may occur in the future, including such things as future business strategy, competitive strengths, goals,

expansion, growth of the Company's businesses, operations, plans and with respect to exp loration results,

the timing and success of exploration activities generally, permitting time lines, government regulation of

exploration and mining operations, environmental risks, title disputes or claims, limitations on insurance

coverage, timing and possible outcome of any pending litigation and timing and results of future resource

estimates or future economic studies.

Often, but not always, forward-looking information can be identified by the use of words such as “plans”,

“planning”, “planned”, “expe cts” or “looking forward”, “does not expect”, “continues”, “scheduled”,

“estimates”, “forecasts”, “intends”, “potential”, “anticipates”, “does not anticipate” or “belief” or

describes a “goal” or variation of such words and phrases or state that certain ac tions, events or results

“may”, “could”, “would”, “might” or “will” be taken, occur or be achieved.

3

Forward-looking information is based on a number of material factors and assumptions, including, the

result of drilling and exploration activities, that contracted parties provide goods and/or services on the

agreed timeframes, that equipment necessary for exploration is available as scheduled and does not incur

unforeseen break downs, that no labour shortages or delays are incurred, that plant and equipme nt

function as specified, that no unusual geological or technical problems occur, and that laboratory and

other related services are available and perform as contracted. Forward -looking information involves

known and unknown risks, future events, condition s, uncertainties and other factors which may cause the

actual results, performance or achievements to be materially different from any future results, prediction,

projection, forecast, performance or achievements expressed or implied by the forward -looking

information. Such factors include, among others, the interpretation and actual results of current

exploration activities; changes in project parameters as plans continue to be refined; future prices of gold;

possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated;

the failure of contracted parties to perform; labour disputes and other risks of the mining industry; delays ,

due to third party opposition, in obtaining governmental approvals or financing or i n the completion of

exploration, as well as those factors disclosed in the company's publicly filed documents. Although the

Company has attempted to identify important factors that could cause actual actions, events or results to

differ materially from tho se described in forward -looking information, there may be other factors that

cause actions, events or results not to be as anticipated, estimated or intended. There can be no assurance

that forward-looking information will prove to be accurate, as actual results and future events could differ

materially from those anticipated in such statements. Accordingly, readers should not place undue

reliance on forward-looking information.