Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BLDS.V ·

Mineral Mountain Plans Phase 2 Directional Drill Program to Target Deep Highgrade “Centroid” GOLD Zone

Exploration Programs

MMV-TSX.V

MNRLF-OTCQX

News Release NR 2018 – 12 October 1, 2018

MINERAL MOUNTAIN PLANS PHASE 2 DIRECTIONAL DRILL

PROGRAM TO TARGET DEEP HIGHGRADE “CENTROID” GOLD

ZONE

Highlights:

 Phase 1 consisting of n ine (9) holes totaling 2,937 meters (9,637 feet) intersecting

broad intervals of economic Upper Tail gold mineralization within the East Limb

Structure 500m down plunge from the historical Standby Mine.

 The Upper Tail gold mineralizatio n from surface to 500 meters down plunge

averages 24 m in width and average grades up to 3.34 g/t Au with locally high grade

gold concentrations of up to 9.80 g/t Au.

 The prominent East Limb gold structure has now been traced for 2,000 m (2 kms)

 Phase 2, totaling up to 4 ,000m, will target centroid -type mineralization intersected

in Homestake hole SM87 -3A (10.29 g/t Au over 3.1m) by employing “state of the

art” directional drilling technology

(Vancouver, October 1, 2018 ): Mineral Mountain Resources Ltd . and its subsidiary Mineral

Mountain Resources (SD) Inc. (“OTCQX: MNRLF”) are pleased to report that its first phase

program of nine (9) holes totaling 2,937 meters (9,637 feet), all focused in the Upper Tail gold

mineralization hosting the historical Sta ndby Mine, has now been successfully completed and a

4,000m Phase 2 program, targeting the high grade gold intersection by Homestake in 1987 which

ran 10.29 g/t Au over 3. 05m (SM87-3A) and employing “state of the art” directional drilling

technology is being planned.

Nelson W. Baker, President and CEO commented: “Our Phase 1 drilling has solidified our belief

that the Standby Target is of sufficient scale (multi -kilometer plunge length of structurally

thickened iron formation) to host a major ore -bearing structure on the scale of the Homestake 9 -

Ledge that produced 9.5 million ounces of gold”.

2

Mineral Mountain’s drilling to date has defined a gold -bearing, near -vertical shear zone (East

Limb Structure) in iron formation, approximately 30 m wide, this prominent structure has been

traced for over 7 00 meters including BHEM down hole geophysics in the Company’s Phase 1

drilling. This wide, well-defined, upper tail structure continues down plunge to a number of deep

holes as far down as 1.5 kilometres , where between 1986-87, Homestake intersected centroid -

type gold mineralization.

Directional Drilling

Using a steerable wireline core barrel, this method significantly reduces the cost by hitting

targets quicker and more accurately than the traditional method used in Phase 1 of the

Company’s drilling program. By making multiple branches from a pilot hole, it dramatically

reduces both the time spent and cost. A major benefit to directional drilling is th at this method is

amenable to multiple highly accurate cross cuts off the pilot hole to penetrate the main

mineralized shear zone down plunge. This pilot hole will greatly improve the geological data that

will be collecting as we probe this hole with “state of the art ” BHEM technology. This

technology has the cap ability to see up to 400 m of f hole as we side track the mineralized

structure down plunge towards the high grade gold zone. This BHEM can also see localized

conductive responses directly associated with highly sulfidic gold mineralization

Status of Current Results

The 26m wide East Limb Structure was intersected in drill hole ST18-007 230 meters down

plunge from ST18 -006. A wide interval of anomalous , sub -economic gold mineralization

ranging up to 1.22 g/t Au was recorded within the prominent structure. This hole was terminated

at a depth of 540.0 meters and , as previously reported, and was successful in intersecting

multiple intervals of highly contorted, folded, highly mineralized iron formation with variable

concentrations of pyrrhotite, pyrite and arsenopyrite mineralization.

Analytical results are still to come for d rill hole ST18 -008 and ST18 -009. Both holes were

designed to intersect a strong down hole EM response that was recorded near the western edge of

the East Limb Structure west of historical drill hole BLG-UG3 (3.36 g/t Au over 24 meters)

and Mineral Mountain’s ST18-006 (2.12 g/t Au over 20 meters). Drill hole ST18 -008 was

aborted early due to blocky terrain and ST18-009 was drilled to 207 m. Assays are expected soon

for ST18-009. (www.mineralmtn.com ).

Qualified Persons

The technical information in this news release has been prepared in accordance with Canadian

regulatory requirements set out in National Instrument 43 -101 and reviewed and approve d by

Nelson W. Baker, P.Eng. the President and CEO of Mineral Mountain Resources Ltd. and a

3

Qualified Person for this project. All exploration activities at the Rochford Project are carried

out under the strict supervision of Kevin Leonard, P.Geo. also a Qualified Person for this project.

About Mineral Mountain Resources and the Rochford Gold Project

Mineral Mountain Resources Ltd., through its wholly owned subsidiary Mineral Mountain

Resources (SD) Inc., is focused on the exploration of its 100% -owned Rochford Gold Project

situated along the highly prospective Homestake Gold Belt in the Black Hills of South Dakota ,

U.S.A. The Rochford Project covers approximately 7,500 acres and straddles three major trends

of structurally thickened auriferous iron formation that host ledge-type gold mineralization.

Since 201 2, the Company , through its wholly owned subsidiary Mineral Mountain Resource

(SD) Inc., has spent over $ 10 million US in gold exploration in the Black Hills of South Dakota

and controls the largest land position in the Rochford greenstone belt and now possesses by far

the largest and most comprehensive database for the district in modern day exploration history !

The Rochford Project is vastly under -explored and has the potential to host district sc ale gold

discoveries.

On Behalf of the Board of Directors

MINERAL MOUNTAIN RESOURCES LTD.

“Nelson W. Baker”, President and CEO

For further information, please contact:

Brad Baker, Vice-President Corporate Development & Director

(604) 714-0111 [email protected]

Or visit our website: www.mineralmtn.com

Forward looking information

This release contains “forward-looking information” within the meaning of applicable Canadian securities

legislation (“Forward-looking information”). Forward-looking information includes, but is not limited to,

statements that address activities, events or developments that the Company expects or anticipates will or

may occur in the future, i ncluding such things as future business strategy, competitive strengths, goals,

expansion, growth of the Company's businesses, operations, plans and with respect to exploration results,

the timing and success of exploration activities generally, permitting time lines, government regulation of

exploration and mining operations, environmental risks, title disputes or claims, limitations on insurance

coverage, timing and possible outcome of any pending litigation and timing and results of future resource

estimates or future economic studies.

Often, but not always, forward-looking information can be identified by the use of words such as “plans”,

“planning”, “planned”, “expects” or “looking forward”, “does not expect”, “continues”, “scheduled”,

“estimates”, “fo recasts”, “intends”, “potential”, “anticipates”, “does not anticipate” or “belief” or

describes a “goal” or variation of such words and phrases or state that certain actions, events or results

“may”, “could”, “would”, “might” or “will” be taken, occur or be achieved.

Forward-looking information is based on a number of material factors and assumptions, including, the

result of drilling and exploration activities, that contracted parties provide goods and/or services on the

4

agreed timeframes, that equipment necessary for exploration is available as scheduled and does not incur

unforeseen break downs, that no labour shortages or delays are incurred, that plant and equipment

function as specified, that no unusual geological or technical problems occur, and that laboratory and

other related services are available and perform as contracted. Forward -looking information involves

known and unknown risks, future events, conditions, uncertainties and other factors which may cause the

actual results, performance or achi evements to be materially different from any future results, prediction,

projection, forecast, performance or achievements expressed or implied by the forward -looking

information. Such factors include, among others, the interpretation and actual results of current

exploration activities; changes in project parameters as plans continue to be refined; future prices of gold;

possible variations in grade or recovery rates; failure of equipment or processes to operate as anticipated;

the failure of contracted parties to perform; labour disputes and other risks of the mining industry; delays

in obtaining governmental approvals or financing or in the completion of exploration, as well as those

factors disclosed in the company's publicly filed documents. Although th e Company has attempted to

identify important factors that could cause actual actions, events or results to differ materially from those

described in forward-looking information, there may be other factors that cause actions, events or results

not to be as anticipated, estimated or intended. There can be no assurance that forward -looking

information will prove to be accurate, as actual results and future events could differ materially from

those anticipated in such statements. Accordingly, readers should no t place undue reliance on forward -

looking information.