Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BLDS.V ·

Mineral Mountain Appoints Terrence A. Lyons to the Board MMV-TSX-V MNRLF-OTCQB M8M- FRANKFURT

Management Changes

Mineral Mountain Appoints Terrence A. Lyons

to the Board

MMV-TSX-V

MNRLF-OTCQB

M8M-

FRANKFURT

VANCOUVER

,

Jan. 6, 2020

/CNW/ - Mineral Mountain Resources Ltd. ("

Mineral Mountain

" or the

"

Company

") (TSXV: "MMV") is very pleased to announce the appointment, effective immediately, of

Terrence A. Lyons

("Terry") to its Board of Directors.

Commented

Nelson W. Baker

, President and CEO of Mineral Mountain: "Terry will bring an immense

and unique set of experience in Corporate Governance, with his unmatched leadership and guidance

to help drive Mineral Mountain's strategic mission to effectively explore its

Rochford

area flagship

Standby Gold Project located only 26 km south of the world's deepest and richest supergiant gold

deposits associated with structurally deformed banded iron formation situated in the Black Hills of

South Dakota, U.S.A.

"

Terry Lyons

currently serves as the Lead Independent Director and Chairman of the Audit

Committee of Canaccord Genuity Group Inc. as well as a Director of Canaccord's subsidiaries in the

UK (Chairman), US,

Australia

and

Asia

. He is also a Director of several public and private

corporations including Sprott Resource Holdings Inc. (Chairman), and Martinrea International Inc.

Mr. Lyons is a retired Managing Partner of Brookfield Asset Management, past Chairman of Polaris

Materials Corporation recently acquired by US Concrete, past Chairman of Northgate Minerals

Corporation which was acquired by

Aurico Gold

(now Alamos), past Chairman of Eacom Timber

Corporation which was recently sold to a private equity firm, former Chairman of Westmin Mining

and Vice-Chairman Battle Mountain Gold. After 9 years he recently retired from the Board of Pavco

(BC Pavilion Corporation).

Terry is a Civil Engineer (UBC) with an MBA from the

University of Western Ontario

1974. He sits on

the Advisory Board of the Richard Ivey School of Business and is active in sports and charitable

activities, is a past Governor of the Olympic Foundation of

Canada

, past Chairman of The Mining

Association of B.C., past Governor and member of the Executive Committee of the B.C. Business

Council, Past Director of the Institute of Corporate Directors (BC) and in 2007 was awarded the

INCO Medal by the Canadian Institute of Mining and Metallurgy for distinguished service to the

mining industry.

Neither the TSX Venture Exchange nor its Regulatory Services Provider accepts responsibility for

the adequacy or accuracy of this release.

About Mineral Mountain Resources and the Standby Gold Project

Mineral Mountain Resources Ltd., through its wholly owned subsidiary Mineral Mountain Resources

(SD) Inc., is focused on the systematic exploration and, if warranted, development of its 100%-

owned

Standby Gold Project

situated along the highly prospective

Homestake Gold Corridor

which trends through the project area in the Black Hills of

South Dakota, U.S.A.

The Standby Gold

Project and its

Rochford

area contiguous land holdings cover in excess of 7,500 acres. Five major

trends of structurally thickened auriferous iron formation geologically comparable to

the Ledge

-type

gold mineralization developed at the Homestake Mine which produced over 40 million ounces of gold

offer above average potential to host a large gold resource.

Along one of the five major trends, drilling on the 100%-owned

Standby Mine Property

to date has

partially defined a gold-bearing, arsenopyrite-pyrrhotite mineralized, near-vertical shear zone in iron

formation,

approximately

30 m

wide

, striking 129 degrees Azimuth, in structurally thickened iron

formation which comprises a tight isoclinal, steeply dipping closed anticlinal structure forming the

eastern limb of the Standby Syncline. This structure, the East Limb Structure, based on the

Company's comprehensive database and the 2018 and 2019 drilling to date confirms that this gold

mineralization also extends down-plunge for at least 1.5 kilometers. In 1987, Homestake drilled

SM87-3A which intersected

3.1 m

@ 10.29 g/t Au

within a broader gold zone 1.5 km down plunge.

The Company's Phase 1 drill campaign completed in 2018 consisted of nine (9) holes totaling 2,937

meters (9,637 feet). This program was successful in intersecting broad intervals of economic "Upper

Tail" gold mineralization within the East Limb Structure to about

500m

down plunge from the

historical Standby Mine. The "Upper Tail" gold mineralization from surface to 500 meters down

plunge averages

24 m in width with grades up to 3.36 g/t Au but locally with high-grade gold

concentrations of up to 9.80 g/t Au

occurring within classic Homestake-style quartz vein-

hydrothermal chlorite breccia with quartz flooding, 3-15% coarse-grained arsenopyrite and 3-7%

pyrrhotite.

A directional drill program was initiated in early October to test the down plunge length of the East

Limb Structure. Based on 3D modelling of the Company's airborne magnetics, surface geological

mapping and the control provided by several historic deep holes completed by Homestake Mining in

1986-87, this structure is of sufficient scale (i.e. multi-kilometer plunge length of structurally

thickened, sheared iron formation) to host a major gold resource.

The Company's primary focus in early 2020 will be to define the limits of Target 1 down dip and

along strike with several short offset holes cutting across the East Limb Structure supported by

downhole EM and to test the high gold mineralization intersected by Homestake in 1986 at

approximately

1500 m

down plunge.

On Behalf of the Board of Directors

MINERAL MOUNTAIN RESOURCES LTD.

"Nelson W. Baker"

, President and CEO

For further information, please contact:

Forward looking information

This release contains "forward-looking information" within the meaning of applicable Canadian

securities legislation ("Forward-looking information"). Forward-looking information includes, but is not

limited to, statements that address activities, events or developments that the Company expects or

anticipates will or may occur in the future, including such things as future business strategy,

competitive strengths, goals, expansion, growth of the Company's businesses, operations, plans and

with respect to exploration results, the timing and success of exploration activities generally,

permitting time lines, government regulation of exploration and mining operations, environmental

risks, title disputes or claims, limitations on insurance coverage, timing and possible outcome of any

pending litigation and timing and results of future resource estimates or future economic studies.

Often, but not always, forward-looking information can be identified by the use of words such as

"plans", "planning", "planned", "expects" or "looking forward", "does not expect", "continues",

"scheduled", "estimates", "forecasts", "intends", "potential", "anticipates", "does not anticipate" or

"belief" or describes a "goal" or variation of such words and phrases or state that certain actions,

events or results "may", "could", "would", "might" or "will" be taken, occur or be achieved.

Forward-looking information is based on a number of material factors and assumptions, including,

the result of drilling and exploration activities, that contracted parties provide goods and/or services

on the agreed timeframes, that equipment necessary for exploration is available as scheduled and

does not incur unforeseen break downs, that no labour shortages or delays are incurred, that plant

and equipment function as specified, that no unusual geological or technical problems occur, and that

laboratory and other related services are available and perform as contracted. Forward-looking

information involves known and unknown risks, future events, conditions, uncertainties and other

factors which may cause the actual results, performance or achievements to be materially different

from any future results, prediction, projection, forecast, performance or achievements expressed or

implied by the forward-looking information. Such factors include, among others, the interpretation

and actual results of current exploration activities; changes in project parameters as plans continue

to be refined; future prices of gold; possible variations in grade or recovery rates; failure of

equipment or processes to operate as anticipated; the failure of contracted parties to perform;

labour disputes and other risks of the mining industry; delays in obtaining governmental approvals or

financing or in the completion of exploration, as well as those factors disclosed in the company's

publicly filed documents. Although the Company has attempted to identify important factors that

could cause actual actions, events or results to differ materially from those described in forward-

looking information, there may be other factors that cause actions, events or results not to be as

anticipated, estimated or intended. There can be no assurance that forward-looking information will

prove to be accurate, as actual results and future events could differ materially from those

anticipated in such statements. Accordingly, readers should not place undue reliance on forward-

looking information.

SOURCE

Mineral Mountain Resources Ltd.

View original content to download multimedia:

http://www.newswire.ca/en/releases/archive/January2020/06/c4679.html

%SEDAR: 00029624E

For further information:

Brad Baker, Vice-President Corporate Development & Director, (778)

383-3975, [email protected], or visit our website: www.mineralmtn.com

CO: Mineral Mountain Resources Ltd.

CNW 08:00e 06-JAN-20