Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BKI.TO ·

Black Iron – Public Hearing to Obtain Surface Rights at the Shymanivske Project Completed & Iron ORE Prices Rising

Corporate Updates

BLACK IRON – PUBLIC HEARING TO OBTAIN SURFACE RIGHTS

AT THE SHYMANIVSKE PROJECT COMPLETED & IRON ORE

PRICES RISING

 PUBLIC HEARING TO TRANSFER SURFACE RIGHTS FOR THE

SHYMANIVSKE PROJECT FROM THE CITY OF KRYVIY RIH COMPLETED

 IRON ORE PRICES TRENDING UP AND CURRENTLY ~$80/T OFF A LOW OF

US$38/T ONE YEAR AGO

TORONTO, ONTARIO (January 23, 201 7) – Black Iron Inc. (“Black Iron” or the “Company”)

(TSX: BKI; FRANKFURT: BIN) is pleased to announce that , as required by local law, a public

hearing to obtain feedback on the city of Kryviy Rih’s plans to include the surface rights for the

area upon which Black Iron’s Shymanivske project resides (the “Shymanivske Land”) in the

city’s territorial plan (an official city map which indicates how land in the city of Kryviy Rih will be

used) was recently completed. Pursuant to Ukrainian law, a special committee of the Kryviy Rih

city council, has also been created to review, with Black Iron’s management, feedback from this

public hearing along with any written submissions prior to making a recommendation to the

Kryviy Rih city council on whether to include a potential lease to the Company of the

Shyamnivske Land in the city of Kryviy Rih’s 2017 territorial plan. Based on the positive

feedback received to date, Black Iron management is hopeful of a positive decision from the

Kryviy Rih city council before the end of Q1 2017 . Upon receiving a positive decision, Black

Iron management will then be able to develop a detailed land allotment plan for the

Shymanivske project as required by the city of Kryviy Rih prior to signing a lease agreement

with the city of Kryviy Rih.

Progress has also been made with Ukraine’s Ministry of Defense to lease land required for the

waste rock, tailings and processing plant at the S hymanivske project. Several meetings have

been held with the Ministry of Defen se to discuss alternative options on parcels of land that

could be made available to Black Iron. Although the Ministry of Defense is supportive of leasing

land to Black Iron , the timing of any such lease remains of concern to the m given this land is

currently used as a training ground in support of the conflict in the Eastern part of the country.

The cease fire in Eastern Ukraine brokered last year is largely holding a nd there has not been

further movement of the front line for several months. It is important to note that the

Shymanivske project is located over 400km away from the area of conflict and several

surrounding iron ore mines owned by ArcelorMittal and Metinves t/Evraz continue to operate in

the ordinary course.

Iron ore prices have trended up over the past year as seen in the chart below and are currently

around US$80/T (compared to a low of US$39/T approximately one year ago ). Black Iron’s

feasibility study (please see Black Iron’s technical report dated January 24, 2014 titled

"Feasibility Study of the Shymanivske Iron Ore Deposit for Black Iron Inc." under the Company's

profile on SEDAR, the “Technical Report”) was based on a long term iron ore price of US$95/T

projecting an operating cost of US$ 45/T, estimated capital cost s of US$1.1 billion and an

assumed exchange rate of 8UAH: US$1 to provide an after tax IRR of 39.1% and NPV of

US$2.6 billion (using an 8% discount rate ). Based on the current exchange rate of

approximately 28UAH: US$1 , and assuming all other factors set out in the Technical Report

remain the same, Black Iron expects that its operating costs and capital costs would be

significantly lower , resulting in hig her economic returns for the Shymanivske project than

originally expected.

Source: Bloomberg Finance L.P.

About Black Iron

Black Iron is an iron ore exploration and development company, advancing its 100% owned

Shymanivske project located in Kryviy Rih, Ukraine. This project contains a NI 43-101 compliant

resource estimated to be 645.8 Mt Measured and Indicated mineral resources, consisting of

355.1 Mt Measured mineral resources grading 32.0% total iron and 19.5% magnetic iron, and

Indicated mineral resources of 290.7 Mt grading 31.1% total iron and 17.9% magnetic iron,

using a cut -off grade of 10% magnetic iron. Additionally, the Shymanivske project contains

188.3 Mt of Inferred mineral resources grading 30.1% total iron and 18.4% magnetic iron. Full

mineral resource details can be found in the National Instrument 43 -101 compliant technical

report dated January 24, 2014 titled "Feasibility Study of the Shymanivske Iron Ore Deposit for

Black Iron Inc." under the Company's profile on SEDAR at www.sedar.com. The Shymanivske

project is surrounded by five other operating mines, including ArcelorMittal's iron ore complex.

The Company believes that existing infrastructure, including access to power, rail and port

facilities, will allow for a quick development timeline to production. Please visit the Company's

website at www.blackiron.com for more information.

The technical and scientific contents of this press release have b een prepared under the

supervision of and have been reviewed and approved by Matt Simpson, P.Eng, President and

CEO of Black Iron, who is a Qualified Person as defined by NI 43-101.

For more information, please contact:

Matt Simpson

President & CEO

Black Iron Inc.

Tel: +1 (416) 309-2138

Forward-Looking Information

This press release contains forward -looking information. Forward-looking information is based on what

management believes to be reasonable assumptions, opinions and estimates of the date such statements

are made based on information available to them at that time, including those factors discussed in the

section entitled ‘‘Risk Factors’’ in the Company’s annual information form for the year ended December

31, 2015 or as may be identified i n the Company’s public disclosure from time to time, as filed under the

Company’s profile on SEDAR at www.sedar.com. Forward -looking information may include, but is not

limited to, statements with respect to the Shymanivske project, the Company’s ability to obtain the

requisite land rights for the Shymanivske project, the war in Eastern Ukraine, the prices of Iron and

currency exchange rates, and future plans for the Company’s development. G enerally, forward looking

information can be identified by the use of forward -looking terminology such as "plans", "expects" or

"does not expect", "is expected", "budget", "scheduled", "estimates", "forecasts", "intends", "anticipates"

or "does not anticipate", or "believes", or variations of such words and phrases or st ate that certain

actions, events or results "may", "could", "would", "might" or "will be taken", "occur" or "be achieved".

Forward-looking information is subject to known and unknown risks, uncertainties and other factors that

may cause the actual results, level of activity, performance or achievements of the Company to be

materially different from those expressed or implied by such forward -looking information, including but not

limited to: general business, economic, competitive, geopolitical and social un certainties; the actual

results of current exploration activities; other risks of the mining industry and the risks described in the

annual information form of the Company. Although the Company has attempted to identify important

factors that could cause a ctual results to differ materially from those contained in forward -looking

information, there may be other factors that cause results not to be as anticipated, estimated or intended.

There can be no assurance that such information will prove to be accurate , as actual results and future

events could differ materially from those anticipated in such statements. Accordingly, readers should not

place undue reliance on forward looking information. The Company does not undertake to update any

forward-looking information, except in accordance with applicable securities laws.