Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BHS.V ·

BAYHORSE Silver Achieves A 94.7% Gold Recovery From The Harrison Gold Project Underground Sampling Program, Announces Drill Program.

Exploration Programs Metallurgy & Processing

November 24, 2020 BHS2020-25

BAYHORSE Silver Achieves A 94.7% Gold Recovery From The Harrison Gold Project Underground

Sampling Program, Announces Drill Program.

Bayhorse Silver Inc. (BHS: TSX-V) (the “Company” or “Bayhorse”) has achieved 94.7% plus gold

recovery from a composite quartz sample from the RN Mine Zone at the Harrison Gold Project,

Harrison, BC. The Harrison Gold Project is permitted for drilling and bulk sampling.

Three quartz samples totaling 82.18 kg were taken from the prominent gold-bearing quartz veins from

the historically mined RN underground workings. The head grade of the samples was 13.2 g/t Au.

The samples were blended and a 41.9 kg master composite was created with a head grade of 11.89 g/t

Au. This composite was then screened for metallic gold and subjected to gravity recovery using a

Falcon Concentrator. The gravity tailings were then subjected to flotation to recover any remaining

gold.

Gravity recovery was 77.6% and gravity tails flotation recovery was 17.1% for a total gold recovery

of 94.7%

The full results are tabulated below:

Sample Number Type g/t Au oz/t Au % g/t Au - oz/t Au+ oz/t Au -

FA FA FA FA

41.9 kg Composite Chip 11.89 0.38

Metallic Screen

Gravity Recovery 8.48 0.27 77.60

Flotation Recovery 1.98 0.06 17.10

Tails 0.63 0.02

Total Recovery 11.26 0.362 94.70

(Channel, chip and grab samples are selected samples and may not be representative of the

mineralization hosted on the property).

The metallurgical work and metallic screen assays confirm the gravity recoverable gold (GRG) test

results reported by Bear Mountain Gold Mines (BMGM) from the RN Zone. Their sampling responded

well to gravity concentration for a recovery of 90.7% with a final concentrate grade of 1,088 g/t Au

from a calculated head grade of 43.2 g/t Au. (BMGM, 2020).

Figure 1 Layered, multiple. gently dipping quartz veining in quartz diorite (tonalite)

As previously announced historic drilling programs completed at the Harrison Gold project during the

1980’s identified several finger like diorite intrusions which host significant vein hosted, gold

mineralization. The mineralized intrusions occur in the northern part of the property over a strike

length of 2 kilometers.

Figure 2 Multiple gold mineralized drill intercepts within the 450 meter strike by 200 meter width zones

The objective of the diamond drill program is to build on the historic drilling intersections that shows

multiple layers of gently dipping, gold bearing quartz veins (ranging from centimeters to tens of

centimeters in thickness) within the Jenner and Portal Zone diorite intrusions. The reported mineralized

zones consist of repeating layers which exhibit concentrated quartz veining over widths ranging from

several meters to several tens of meters. Historic results from one of these layers or zones within the

Portal Zone intrusion (referred to as the Easter Egg Zone) includes DDH 88- 76 which intersected 7.0

meters of mineralization averaging 21.4 g/t gold.

Historical reports indicate that a total of 642.82 tonnes (708.58 tons) of mined material was shipped

from the RN Zone that contained 30,443 grams of gold (978.89 ounces), 11,000 grams silver (300

ounces) and 616 kilograms of copper . Mineralization at Harrison consists of free milling gold, with

gold sizing from 0.2 to 2.0 mm sized grains, within quartz veins ranging from less than a cm to several

tens of cm in width.

The due diligence sampling from the RN zone workings, that lies 450 meters SW of the Jenner

workings, follows up the recent Jenner zone sampling program as reported in the Company’s news

release BHS2020-22. That sampling program was conducted by Bayhorse senior consulting geologist,

Dr. Clay Conway. Nine quartz vein chip samples were taken from the Jenner Adit where the highest

grade sampled was 414.2 g/t (12.11 opt) Au. Full results are tabulated below.

There are eight known mineralized zones in the first two kilometers on the seven kilometer long by

one kilometer wide Harrison Gold Project, that is interpreted to be a Reduced Intrusive Related Gold

System (RIRGS). Three of these zones, the Jenner, the RN, and the Easter Egg are the current focus of

the Company’s drilling program. The historically mined RN Mine portal lies 65 meters below, and 450

meters to the south west of the Jenner underground workings. The Easter Egg Zone lies between the

RN and Jenner, 150 meters east north-east of the RN Mine portal, and 300 meters south of the Jenner

Based on surface and underground drilling completed by Bema above the 50 meter ASL level, Norman

(1989), using a one gram cut off grade for the Jenner Zone and a 2 gram cut -off grade for the Portal

Zone, estimated that the Jenner and Portal Zones contain 2,458,674 tonnes at an average grade of 2.79

g/t gold, for 220,300 ounces.

Zone Category Resour

ce

Tonnes

Grad

e g/t

Au

Grams Oun

ces

Jenner

zone

“Probable and

Possible”

1,801,1

34

2.71 4,876,6

35

156,71

0

Portal

zone

“Probable and

Possible”

657,753 3.02 1,984,3

24

63,76

6

The Company advises that the conclusion by Norman (1989) above is of a historic nature and should

not be relied upon. Historic drill holes, resource estimates and grades reported have not been verified.

A Qualified Person has not done sufficient work to ve rify the historical estimates nor classify the

historic estimates as current mineral resources or mineral reserves, and the Company is not treating the

historical estimates as current mineral resources or mineral reserves. Additional resampling and

drilling and analysis by a Qualified Person will be required to designate a current resource under

National Instrument 43-101 standards.

Bayhorse CEO Graeme O’Neill comments, “Gold recovery from the metallic screen assays results

from both the Jenner and RN underground workings confirm the work of Bear Mountain Gold Mines

that the gold is free milling and readily recoverable. Our goal with the upcoming drill program will be

to confirm what is believed to be an extensive high grade gold mineralized zone in the Easter Egg

Zone, between the RN Mine and the Jenner underground workings.”

The Company announces an amendment, subject to TSX -V approval, of the previously announced

private placement financings. The flow-through financing has been amended from 7,000,000 Units at

$0.15 cents for gross proceeds of $1,050,000 to 9,000,000 Units at $0.125 for gross proceeds of

$1,125,000. Each Unit will now consist of one common share and one transferable common share

purchase warrant with each warrant exercisable into one com mon share of the Company at $0.20 per

common share two years from the date of issuance.

The flow-through financing amendment will result in additional issuances of Units for the first tranche

that was closed on October 30, 2020 for total proceeds of $182,000. Subject to TSX-V approval, the

Company will issue in aggregate an additional 242,667 Units to the first tranche subscribers. Of these,

Graeme O’Neill, a Director and Officer of the Company, will be issued an additional 120,000 Units

and Rick Low, an Officer of the Company, will be issued an additional 30,000 Units.

The non flow-through financing has been amended from 5,000,000 Units, at $0.15 cents per unit for

gross proceeds of $750,000 to 6,000,000 Units at $0.125 for gross proceeds of $750,000. Each non

flow-through unit will now consist of one common share and one transferable common share purchase

warrant, with each warrant exercisable into one common share of the Company at $0.20 per common

share two years from the date of issuance.

Subject to TSX -V approval, t he Company has closed a second tranche of the flow -through private

placement consisting of 1,600,000 Units for gross proceeds of $200,000. Bayhorse CEO , Graeme

O’Neill, has subscribed for 130 ,000 Units. He has funded his acquisition through the sale, both

privately and through the facilities of the TSX Venture Exchange of 380,000 shares of the Company.

Rick Low, an Officer of the Company, has subscribed for 100,000 Units.

The flow-through placement is to fund the Harrison exploration and earn in program. The non- flow

through private placement is for working capital and general corporate purposes and the Bayhorse

Mine.

This News Release has been prepared on behalf of the Bayhorse Silver Inc. Board of Directors, which

accepts full responsibility for its content. Dr. Stewart Jackson, P.Geo., a Qualified Person and

Consultant to the Company has prepared, supervised the preparation of and approved the technical

content of this press release.

On Behalf of the Board,

Graeme O’Neill, CEO

[email protected]

1-866-399-6539

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

About Bayhorse Silver Inc.

Bayhorse Silver Inc. is an exploration and production company with a 100% intere st in the historic

Bayhorse Silver Mine located in Oregon, USA, an option to acquire an 80% interest on the

Brandywine, precious metals rich, volcanogenic massive sulphide property, and is earning a 50%

interest in the Harrison Gold Project, located in B.C ., Canada. The Company has an experienced

management and technical team with extensive mining expertise surrounding exploration and building

mines.