Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BGD.V ·

Bullion GOLD Intersects 16.96 G/T Au over 9 M Including 33.21 G/T Au over 4.50 M, ON the Bousquet Project

Drill Results

NEWS RELEASE TSX.V: BGD

BULLION GOLD INTERSECTS 16.96 G/T AU OVER 9 M INCLUDING 33.21 G/T AU

OVER 4.50 M, ON THE BOUSQUET PROJECT

January 31, 2022 - Montréal, Québec – Bullion Gold Resources Corp. (TSX-V: BGD) (“Bullion Gold”

or the “Corporation”) announces that it has completed a first drilling program of nine holes totaling 2,381

meters on the Bousquet project, located over more than 7 km along the Cadillac -Larder Lake fault, in the

Rouyn-Noranda region, in Quebec.

These holes drilled to verify the historical data of the Paquin-Est, Paquin Ouest and Decoeur zones confirm

the presence of gold, most of which have intersected several significant gold values in zones of deformation

and silicification strongly mineralized.

Located in the Paquin East zone, hole BO -21-08 intersected a 9 -meter gold section grading 16.96 g/t Au

including a 4.5-meter zone grading 33.21 g/t Au also including 1 meter at a grade of 129.25 g/t Au while

BO-21-09 revealed a gold zone of 4.5 meters at a grade of 3.21 g/t Au including 2 meters at a grade of 4.11

g/t Au.

In the Decoeur zone, holes BO -21-01 and BO -21-02 returned grades ranging from 1.03 g/t Au over 9.3

meters and 1.09 g/t Au over 17.84 meters respectively while BO-21-03 revealed a grade of 2.02 g/t Au over

3 meters in an anomalous zone of more than 12 meters along the hole.

“We are very pleased with the results obtained during this first 2021 drilling campaign. These confirm the

gold potential of the Decoeur and Paquin zones. Recognized by drilling over more than 3.5 km, the Joannes,

Decoeur, Paquin and CB 1 gold zones will e ventually be the subject of a larger drilling campaign during

2022. Definition and in-depth drilling will make it possible to establish a first 43-101 resource on this project

as soon as possible," said Jonathan Hamel, President and CEO of the Corporation

2022 Exploration Program

The Corporation is planning a definition drilling program in 2022 and intends to test the depth extensions

of the known showings as well as verify certain potential targets located north of the Cadillac -Larder Lake

fault. The northern sector of the Bousquet project has hardly ever been the subject of drilling work also, the

Corporation believes that the anomalies of low and high magnetic intensities defined in th at sector by an

airborne magnetic survey carried out during 2021 should be tested during the year.

Bousquet Project

Located 30 km east of Rouyn -Noranda, the Bousquet project is composed of 97 cells for an area of

approximately 2,675 hectares. The property extends over nearly 7 km along the Cadillac Fault. An ENE

gold corridor of more than 3.5 km long including the main gold showings confirmed by drilling is located

south of this fault. The world -renowned Cadillac-Larder Lake fault is one of the most prolific gold -bearing

faults in Canada. More than 100M ounces of gold have been produced historically in its immediate

environment. Still today, several gold deposits in production are associated with it such as Lapa, Canadian

Malartic, La Ronde, Goldex, Sigma and Lamaque.

The Bousquet property is underlain by metasedimentary rocks of the Cadillac, Timiskaming and Pontiac

groups and volcanic and intrusive flows of the Piché group. The Cadillac mining camp is mainly

characterized by three types of mineralization related to distinct auriferous geological contexts: auriferous

massive sulphide lenses (Bousquet 2 and La Ronde mines), gold -rich polymetallic veins (Doyon and

Mouska mines) and auriferous veins associated with EW oriented regional faults (Lapa deposit). The

property is 100% owned by the Corporation.

About Bullion Gold Resources

Bullion Gold is involved in the identification, exploration, and development of viable mineral properties in

the Province Quebec and British Columbia. For more information on the Corporation, visit

www.bulliongold.ca

This press release has been read and approved by Jeannot Théberge, qualified person according to NI

43-101.

Hole # * From (m) To (m) Length (m) ** Au (g/t) Zone

BO-21-01 172,3 173,40 1,10 1,29 Decoeur

177 187,50 10,5 0,89

incl 177 178,00 1,0 1,40

incl 181,50 183,00 1,50 1,18

184,50 186,00 1,50 1,01

And 201,00 202,50 1,50 1,17

BO-21-02 117,00 133,30 16,30 1,09 Decoeur

Incl 118,50 120,00 1,50 1,52

Incl 121,50 123,00 1,50 1.75

Incl 124,50 126,00 1,50 1,00

Incl 129,00 130,50 1,50 1,02

Incl 130,50 132,00 1,50 2,24

BO-21-03 124,50 127,50 3,00 2,02 Decoeur

BO-21-07 212,00 213,00 1,00 3,74 Paquin Est

And 228,25 229,25 1,00 1,10

BO-21-08 169.00 170,00 1,00 1,40 Paquin Est

178,50 187,50 9,00 16,97

Incl 181,50 186,00 4,50 33,21

Incl 184,00 185,00 1,00 129,25

And 206,00 207,00 1,00 1,19

BO-21-09 190,00 194,50 4,50 3,21 Paquin Est

Incl 190,00 191,00 1,00 4,13

Incl 191,00 192,00 1,00 4,09

And 220,50 222,00 1,50 1,01

And 223,20 223,50 0,30 2,05

And 225,60 226,75 1,15 1,20

*Note that drill holes BO-21-04, BO-21-05 and BO-21-06 are not significant.

** Thickness along the hole.

For further information, please contact:

Jonathan Hamel

President and CEO

[email protected]

514-317-7956

Other Information

The TSX Venture Exchange and its Regulation Services Provider (as that term is defined in the policies of the TSX

Venture Exchange) accepts no responsibility for the veracity or accuracy of its content.

Forward-Looking Statements: This press release contains forward-looking statements. Forward-looking statements are frequently

characterized by words such as "plan", "expect", "project", "intend", "believe", “anticipate", "estimate", "may", "will", "would", "potential",

"proposed" and other similar words, or statements that certain events or conditions "may" or "will" occur. The forward -looking

statements are based on certain key expectations and assumptions made by the Corporation. Although Bullion Gold believes that the

expectations and assumptions on which the forward -looking statements are based are reasonable, undue reliance should not be

placed on the forward-looking statements because Bullion Gold can give no assurance that they will prove to be correct. Since forward-

looking statements address future events and conditions, by their very nature they involve inherent risks and uncertainties. Actual

results could differ materially from those currently anticipated due to a number of factors and risks. In addition to other risks that may

affect the forward-looking statements in this press release are those set out in the Corporation’s management discussion and analysis

of the financial condition and results of operations for the year ended December 31, 2019 and the third quarter ended September 30,

2020, which are available on the Corporation’s profile at www.sedar.com. The forward -looking statements contained in this press

release are made as of the date hereof and Warrior Gold undertakes no obligation to update publicly or revise any forward -looking

statements or information, whether as a result of new information, fu ture events or otherwise, unless so required by applicable

securities laws.

NOT FOR DISSEMINATION IN THE UNITED STATES OR FOR DISTRIBUTION TO U.S. NEWSWIRE SERVICES AND DOES NOT

CONSTITUTE AN OFFER OF THE SECURITIES DESCRIBED HEREIN.