Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BFM.V ·

Bedford Metals Identifies Key Uranium Markers at Close Lake Uranium Project

Corporate Updates

NEWS RELEASE

BEDFORD METALS IDENTIFIES KEY URANIUM MARKERS AT CLOSE LAKE URANIUM PROJECT

July 16, 2024— Bedford Metals Corp. (TSX-V: BFM, FWB: O8D, ISIN: CA0762301012) (the “Company” or

“Bedford”) is pleased to announce the results of its VNIR (Visible Near Field Infrared) and SWIR (Shortwave

Infrared) satellite investigation at the Close Lake Uranium Project in the Athabasca Basin, Saskatchewan.

An analysis conducted by Dr. Neil Pendock, PhD, has successfully identified several positive indicators for

uranium, including anomalous helium emissions and various subsurface features such as illite clays and

magnetite. These findings are comparable to those observed at Cameco’s Cigar Lake Mine, the world’s

highest-grade uranium mine.

Key Findings:

● Helium Blooms: Two significant helium blooms were identified. He1 is located at the

northwestern extent of the project, at the southern terminus of a previously identified target

zone. He2 is situated on the northern shore of Close Lake. The presence of anomalous helium, a

decay product of uranium, is directly correlated with uranium deposits.

● Hematite-Rich Anomaly: A 1000m northwest-trending anomaly, interpreted as hematite-rich,

was discovered. Hematite is an alteration signature observed at the Cigar Lake Mine and is found

in sandstone above the unconformity, in fractures and breccias, and in basement rocks below the

unconformity, closely associated with uraninite ores.

● Illite Anomaly: A concurrent anomaly interpreted as illite was identified. Illite is a clay formed

through intense hydrothermal alteration, which is the principal mechanism for uranium

deposition in the basin.

Peter Born, President of Bedford, commented, “The results of this satellite survey are highly encouraging.

The identification of these key uranium markers will allow us to focus our drilling on the key locations as

we work towards making a significant discovery. Our next steps will involve integrating these new

datasets, which have a ground resolution of approximately 10 meters, with our historic datasets to

identify precise diamond drilling targets.”

Bedford remains committed to conducting all exploration activities to the highest environmental

standards. The Company is dedicated to minimizing its environmental footprint and ensuring that all

operations are sustainable and responsible. Additionally, Bedford values its relationships with local

communities and indigenous groups and is committed to working collaboratively to ensure that its

activities bring positive benefits to these stakeholders.

Dr. Peter Born, P.Geo., is the designated qualified person as defined by National Instrument 43-101 and

the President of the Company and is responsible for and has approved the technical information

contained in this release.

About Bedford Metals Corp.

Bedford Metals Corp. is a mineral exploration company. We create value for our shareholders by

identifying and developing highly prospective mineral exploration opportunities. Our strategy is to

advance our projects from discovery to production.

The Close Lake Uranium Project lies on the eastern side of the Athabasca Basin, adjoining claims held by

Cameco Corporation, the largest uranium producer in the world. The claim is approximately 245 hectares

and lies within the primary exploration corridor, which hosts the Keys Lake Mine, the Cigar Lake Mine and

the McArthur River Mine. Access to the property is done through a network of roads and trails.

The Ubiquity Lake Uranium Project , covering 1382 hectares, lies just south of the bottom lip of the

Athabasca Basin, adjacent to ALX Uranium’s Carpenter Lake Project to the east. Situated near the Cable

Bay Shear Zone, parallel to the Virgin River Shear Zone, which hosts Cameco’s Centennial uranium deposit,

the project holds immense potential. Furthermore, it is located 100 km west of Cameco’s past-producing

Key Lake uranium mine, underscoring the strategic significance of its location.

The Sheppard Lake Uranium Project , covers an area of approximately 2250 hectares and adjoins the

Ubiquity Lake Project to the southeast. The project area is characterized by rocks of the Mudjatik domain,

where uranium mineralization is typically basement-hosted, situated within shears or faults, and formed

through hydrothermal redistributions of dissolved metals and subsequent redox reactions.

For further information, please contact the Company at [email protected] or 604-622-1199 or

visit the Company’s website at www.bedfordmetals.com.

On behalf of the Board,

Bedford Metals Corp.

“Peter Born”

President

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may include forward-looking statements that are subject to risks and uncertainties. All statements within, other

than statements of historical fact, are to be considered forward looking. Although the Company believes the expectations

expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of

future performance and actual results or developments may differ materially from those in forward-looking statements. There

can be no assurances that such statements will prove accurate and, therefore, readers are advised to rely on their own evaluation

of such uncertainties. We do not assume any obligation to update any forward-looking statements except as required under the

applicable laws.

CONTACT:

MRKT360 INC

https://mrkt360.com

Alex Zertuche

[email protected]

For E.S.T Office Hours, Call 1 416-477-0587