Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BFM.V ·

Bedford Metals Expands Satellite Survey to Include Close Lake Uranium Project

Exploration Programs

NEWS RELEASE

BEDFORD METALS EXPANDS SATELLITE SURVEY TO INCLUDE CLOSE LAKE URANIUM PROJECT

June 25th, 2024— Bedford Metals Corp. (TSX-V: BFM) (the “Company” or “Bedford”) is pleased to

announce that, following the positive initial results from its satellite survey on its Ubiquity Lake Uranium

Project, the Company has decided to expand the scope of the survey to include its recently optioned Close

Lake Uranium Project in the Athabasca Basin, Saskatchewan. The expanded survey will be conducted by

CanExplor Management Ltd., leveraging advanced technology to analyze helium emission data which

directly correlates with uranium decay.

The initial survey over the Ubiquity Lake Uranium Project is expected to provide significant insights into

subsurface geology and uranium mineralization, enhancing Bedford's understanding of the area. The

interpretation of these results is underway, and the Company will release them once received. The

decision to include the Close Lake Uranium Project in this survey is driven by compelling initial findings.

Peter Born, President of Bedford, stated, “The early results from our Ubiquity Lake survey have been

highly encouraging, and expanding the survey to include Close Lake is a natural progression. This

expanded survey will provide us with a more comprehensive understanding of the geological potential of

both projects. By integrating these datasets, we can refine our exploration strategies and focus on the

most promising targets.”

The Close Lake Uranium Project covers an area of approximately 2250 hectares, adjacent to Bedford’s

Ubiquity Lake claims. The expanded survey will now encompass a total of over 3600 hectares of

prospective ground, utilizing state-of-the-art VNIR (Visible Near Field Infrared) and SWIR (Shortwave

Infrared) technology to detect helium emissions and other key indicators of uranium deposits.

Bedford remains committed to environmental stewardship and responsible resource development. The

Company is dedicated to conducting all exploration activities to the highest environmental standards and

continues to work closely with local communities and indigenous groups to ensure respectful and

transparent engagement.

Dr. Peter Born, P.Geo., is the designated qualified person as defined by National Instrument 43-101 and

the president of the Company and is responsible for and has approved the technical information

contained in this release.

About Bedford Metals Corp.

Bedford Metals Corp. is a mineral exploration company. We create value for our shareholders by

identifying and developing highly prospective mineral exploration opportunities. Our strategy is to

advance our projects from discovery to production.

The Ubiquity Lake Uranium Project , covering 1382 hectares, lies just south of the bottom lip of the

Athabasca Basin, adjacent to ALX Uranium’s Carpenter Lake Project to the east. Situated near the Cable

Bay Shear Zone, parallel to the Virgin River Shear Zone, which hosts Cameco’s Centennial uranium deposit,

the project holds immense potential. Furthermore, it is located 100 km west of Cameco’s past-producing

Key Lake uranium mine, underscoring the strategic significance of its location.

The Close Lake Uranium Project lies on the eastern side of the Athabasca Basin, adjoining claims held by

Cameco Corporation, the largest uranium producer in the world. The project spans approximately 245

hectares and lies within the primary exploration corridor, which hosts the Keys Lake Mine, the Cigar Lake

Mine and the McArthur River Mine. Access to the property is done through a network of roads and trails.

For further information, please contact the Company at [email protected] or 604-622-1199 or

visit the Company’s website at www.bedfordmetals.com.

On behalf of the Board,

Bedford Metals Corp.

“Peter Born”

President

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture

Exchange) accepts responsibility for the adequacy or accuracy of this release.

This news release may include forward-looking statements that are subject to risks and uncertainties. All statements within, other

than statements of historical fact, are to be considered forward looking. Although the Company believes the expectations

expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of

future performance and actual results or developments may differ materially from those in forward-looking statements. There

can be no assurances that such statements will prove accurate and, therefore, readers are advised to rely on their own evaluation

of such uncertainties. We do not assume any obligation to update any forward-looking statements except as required under the

applicable laws.

CONTACT:

MRKT360 INC

https://mrkt360.com

Alex Zertuche

[email protected]

For E.S.T Office Hours, Call 1 416-477-0587