Bedford Metals Announces Winter Exploration Plans FOR Ubiquity Lake Uranium Project
NEWS RELEASE
BEDFORD METALS ANNOUNCES WINTER EXPLORATION PLANS FOR UBIQUITY LAKE URANIUM
PROJECT
November 14 th, 2024— Bedford Metals Corp. (TSX-V: BFM, FWB: O8D, ISIN: CA0762301012) (the
“Company” or “Bedford) is pleased to announce its Winter 2024/25 field program for the Ubiquity Lake
Uranium Complex, located on the southern lip of the Athabasca Basin, Saskatchewan, adjacent to the
regional-scale Cable Shear. The exploration program will be conducted in two distinct phases to further
advance and define high-potential uranium targets within the project area.
Phase 1 of the program will involve a comprehensive Magnetic and Electromagnetic (EM) survey to map
key bedrock structures, faults, folds, and graphitic conductors. Graphitic conductors are significant as they
are often associated with uranium mineralization in the Athabasca Basin. The data collected from this
survey will be integrated with historic datasets to develop a global understanding of the alteration events
and the resultant uranium enrichment across the Ubiquity Lake Complex.
Phase 2 will consist of a ground Induced Polarization (IP) survey and extensive prospecting, particularly in
areas where target zones have been identified. This phase will involve the collection of channel samples
and the deployment of man-portable Shaw Drills, which can produce A-core and have an effective
penetration of over 5m. The primary goal of this phase is to refine diamond drilling targets for the planned
Fall 2025 field season.
To execute and oversee the Winter 2024/25 exploration program, Bedford has engaged Grander
Exploration. Grander has a proven and successful track record in the Athabasca Basin, employing both
traditional and innovative exploration techniques to optimize field activities.
Peter Born, President of Bedford, commented, “We are excited to commence our Winter 2024/25
exploration program at Ubiquity Lake. With the support of Grander Exploration and the advanced
techniques we plan to deploy, we are confident that this program will advance our understanding of the
project’s uranium potential and refine our drilling targets for the next phase. Our recent successes and
growing knowledge of the area fuel our optimism as we look forward to future exploration milestones.”
Bedford remains committed to conducting all exploration activities in an environmentally responsible
manner. The company prioritizes minimizing its environmental footprint and ensuring that all operations
are sustainable and respectful. Additionally, Bedford values collaboration with local communities and
indigenous stakeholders, ensuring that its activities bring positive benefits and are carried out
transparently and cooperatively.
The Company will provide additional details on the Winter 2024/25 program as plans are finalized and
preparations advance. Bedford is dedicated to keeping stakeholders informed of all significant
developments.
Qualified Person
Dr. Peter Born, P.Geo., is the designated qualified person as defined by National Instrument 43-101, and
the President of the Company, and is responsible for and has approved the technical information
contained in this release.
About Bedford Metals Corp.
Bedford Metals Corp. is a mineral exploration company. We create value for our shareholders by
identifying and developing highly prospective mineral exploration opportunities. Our strategy is to
advance our projects from discovery to production.
The Ubiquity Lake Uranium Project , covering 1382 hectares, lies just south of the bottom lip of the
Athabasca Basin, adjacent to ALX Uranium’s Carpenter Lake Project to the east. Situated near the Cable
Bay Shear Zone, parallel to the Virgin River Shear Zone, which hosts Cameco’s Centennial uranium deposit,
the project holds immense potential. Furthermore, it is located 100 km west of Cameco’s past-producing
Key Lake uranium mine, underscoring the strategic significance of its location.
The Sheppard Lake Uranium Project covers an area of approximately 2250 hectares and adjoins the
Ubiquity Lake Project to the southeast. The project area is characterized by rocks of the Mudjatik domain,
where uranium mineralization is typically basement-hosted, situated within shears or faults, and formed
through hydrothermal redistributions of dissolved metals and subsequent redox reactions.
The Close Lake Uranium Project lies on the eastern side of the Athabasca Basin, adjoining claims held by
Cameco Corporation, the largest uranium producer in the world. The claim is approximately 245 hectares
and lies within the primary exploration corridor, which hosts the Keys Lake Mine, the Cigar Lake Mine,
and the McArthur River Mine. Access to the property is done through a network of roads and trails.
For further information, please contact the Company at [email protected] or 604-622-1199 or
visit the Company’s website at www.bedfordmetals.com.
On behalf of the Board,
Bedford Metals Corp.
“Peter Born”
President
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in policies of the TSX Venture
Exchange) accepts responsibility for the adequacy or accuracy of this release.
This news release may include forward-looking statements that are subject to risks and uncertainties. All statements within, other
than statements of historical fact, are to be considered forward looking. Although the Company believes the expectations
expressed in such forward-looking statements are based on reasonable assumptions, such statements are not guarantees of future
performance and actual results or developments may differ materially from those in forward-looking statements. There can be no
assurances that such statements will prove accurate and, therefore, readers are advised to rely on their own evaluation of such
uncertainties. We do not assume any obligation to update any forward-looking statements except as required under the applicable
laws.