Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BFG.CN ·

Majuba Hill Copper Reports 2022 Core Results: Longest Intercepts of Copper Mineralization ever Drilled at Porphyry Project

Drill Results

1

*Press Release January 23, 2023

Majuba Hill Copper Reports 2022 Core Results:

Longest Intercepts of Copper Mineralization ever

Drilled at Porphyry Project

VANCOUVER, BC — January 23, 2023 — Majuba Hill Copper Corp. (CSE: JUBA / OTC:

JUBAF / FWB:4NP) (“Majuba Hill Copper” or the “Company”) is pleased to report that

2022 core holes MHB-27 and MHB-28 intersected over 1000 feet (304.8 meters) of

plus 0.25% copper equivalent (“CuEQ”) mineralization at the Majuba Hill Porphyry

Copper Project in Pershing County, Nevada. These are the longest copper mineralized

intercepts ever drilled at Majuba. The mineralized intersections are directly

correlative with porphyry-type vein density, pervasive porphyry-style alteration, and

multiple intrusive events.

Highlights

MHB-27: 1136 ft (346.3 m) @ 0.25% CuEQ starting at 710 ft (216.4 m) including:

• 834 ft (254.2 m) @ 0.31% CuEQ from 750 to 1584 (228.6-482.8 m)

• 119 ft (36.3 m) @0.14% CuEQ from 1727-1846 ft (526.4-562.7m)

MHB-28: 1287 ft (392 m) @ 0.30% CuEQ starting at 245 ft (74.7 m), including:

• 652 ft (198.7 m) @ 0.33% CuEQ from 595 to 1247 ft

• 192 ft (58.5 m) @ 0.21% CuEQ from 1340 to 1532 ft

• 105 ft (32 m) @ 0.18% CuEQ from 1542 to 1647 ft

MHB-29: Intersected granodiorite porphyry at 3403 ft (1037 m). The entire hole is

mineralized with 3607 ft (1099.4 m) @ 0.05% CuEQ from 0 to 3607 ft.

• Strong potassic alteration that is overprinted by pervasive propylitization.

• Zoning within the Majuba Target Zone indicates MHB-29 is southwest of the

main mineralized zone.

• Intersected 26 intervals greater than 0.20% CuEQ

MHB-27, 28, and 29 mineralization characteristics include:

• Supergene enrichment from the surface down to at least 1420 ft (432.8 m)

• Distinct porphyry style “A”, “B”, and “D” type veins in all drill holes

• Trace element geochemistry zoning for molybdenum, zinc, and bismuth.

The 2022 core drilling program focused on the Majuba Target Zone. The goal was to

complete deeper holes and extend the copper mineralization intersected in the 2020

and 2021 drill campaigns. Detailed results are shown in Table 1.

An updated property wide mineral inventory estimate is now underway.

David Greenway, CEO stated, “The tremendous thickness of copper mineralization

confirms that Majuba Hill is a significant porphyry copper discovery in Nevada, one

2

of the top three mining jurisdictions in the world. Copper mineralization from top to

bottom also indicates that we have discovered a deposit which will have an impact

on the copper supply for the world at a time when the world needs long-term, secure

supplies for the future. With our mineral inventory estimate announced September

20th, 2022, showcasing the potential for 1.5 billion pounds of copper equivalent, we

now have these game changing results in hand to expand on that estimate and

ultimately contribute to the development of a NI 43-101 compliant copper resource.”

Cross Section 375879E: Holes MHB-27 and MHB-29 (see map for location)

MHB-27 is mineralized throughout the entire hole with 3500 feet (1066.8 m) @

0.18% CuEQ from 0-3500 feet (0-1066.8 m).

The upper part of the higher-grade mineralization in MHB-27 is enriched down to

1420 feet (432.8 m). Enrichment minerals include azurite, malachite, chalcocite, and

traces of digenite with chalcopyrite/pyrite. A zone of disseminated and fracture

hosted native copper occurs near the deepest parts of the enrichment. The additional

426 feet (129.8 m) of CuEQ mineralization below the enrichment is non-enriched,

primary/hypogene sulfides.

3

MHB-29 is mineralized throughout the entire hole, containing 0.05% CuEQ from 0 to

3607 feet (0-1099.4 m).

Enrichment is limited to the top 250 feet. The deepest visible native copper and other

enrichment metals occurred at 247 feet. Throughout the hole there are 26 intervals

with greater than 0.2% Cu between 206.5 feet (62.94 m) and 3468 feet (1058.57

m). These mineralized zones have up to 10 feet (3.05 m) @ 0.43% CuEQ.

The long copper mineralization intercepts and the broad spacing of holes MHB-27 and

MHB-29 combined with the molybdenum, zinc, gold, and bismuth assay results

outline distinct mineral zoning. The vector from this zoning indicates that copper

grades are increasing to the northeast. This corridor is outlined by the “2023 Target

Corridor” on the map.

Cross-Section 375879E Looking West

MHB-27 1393 ft: Azurite-Chrysocolla MHB-27 1404-1409 ft: Native Copper

4

MHB-27 2537-2545.5 ft:

Quartz, tourmaline, pyrite,

chalcopyrite stockwork veining

MHB-29 3462-3470 ft:

Quartz, tourmaline, pyrite,

chalcopyrite stockwork veining

Copper enrichment in the upper part of hole MHB-29 was limited, however porphyry

style veining is prominent throughout the hole and potassic alteration increased

below 1700 feet. The hole bottomed in granodiorite (3403 to 3607 ft) that is cross -

cut by numerous quartz-pyrite-tourmaline veins plus disseminated and vein

controlled secondary biotite.

Cross Section 4503030N: Hole MHB-28 (see map for location)

MHB-28 is mineralized from top bottom with 1769 feet (539.2 m) @ 0.25% CuEQ

from 0-1769 feet (539.2 m). This includes 1287 feet (392 m) @ 0.30% CuEQ from

245 to 1532 feet (74.7-467 m).

Cross-Section 4503030N Looking Northwest

5

Reverse circul ation drill hole MHB -6 completed in 2020 is close to MHB -28 and

intersected 800 feet @ 0.23% CuEQ from 0-800 feet (0-243.8 m). MHB-28 extended

the copper zone 732 feet ( 223.1 m) deeper and finished in low grade CuEQ

mineralization and strong alteration at the bottom of the hole.

Multiple occurrences of bismuthinite and well developed porphyry veining provide a

vector indicating the copper grade is increasing towards the northeast within the

target corridor on the map.

MHB-28-386 feet:

Bismuthinite Vein

MHB-28-1242 feet:

Quartz-sulfide vein with selvage

Copper Equivalent Calculation

Copper equivalent (CuEQ) values were calculated by combining the assay values for

copper, silver, gold, molybdenum, lead, and zinc across the significant copper drill

intercepts for intervals composited to 0.16% Cu and 0.06% Cu.

The Cu, Ag, Au, Mo, Pb, and Zn assay results for each intercept were combined into

the CuEQ value using an interval-weighted calculation based on metal prices taken

from Kitco.com and DailyMetalPrice.com on July 27, 2022.

6

Table 1: Significant CuEQ and Copper Results for MHB-27, 28, and 29

DH_Hole Length_ft F rom_ft To_ft Significant CuEQ Cu % CuEQ% Ag_EQ/

CuEQ Ag_CuEQ Au_CuEQ Mo _CuE

Q Pb_CuEQ Zn_CuEQ

MHB-27 35 485 520 MHB-27: 35 ft (10.7 m) @ 0.12% CuEQ

from 485 to 520 0.06 0.12 0. 26 306 41 155 7 46

15 710 725 MHB-27: 15 ft (4.6 m) @ 0.11% CuEQ

from 710 to 725 0.06 0.11 0. 25 267 37 81 6 29

15 730 745 MHB-27: 15 ft (4.6 m) @ 0.11% CuEQ

from 730 to 745 0.06 0.11 0. 31 331 29 73 4 16

834 750 1584 MHB-27: 834 ft (254.2 m) @ 0.31%

CuEQ from 750 to 1584 0.20 0.31 0. 16 488 205 313 2 61

119 1727 1846 MHB-27: 119 ft (36.3 m) @ 0.14%

CuEQ from 1727 to 1846 0.08 0.14 0. 31 428 48 58 3 100

15 2995 3010 MHB-27: 15 ft (4.6 m) @ 0.21% CuEQ

from 2995 to 3010 0.06 0.21 0. 11 238 502 552 3 155

50 3425 3475 MHB-27: 50 ft (15.2 m) @ 0.22% CuEQ

from 3425 to 3475 0.06 0.22 0. 09 203 929 432 5 42

MHB-28 20 140 160 MHB-28: 20 ft (6.1 m) @ 0.17% CuEQ

from 140 to 160 0.07 0.17 0. 43 734 68 53 46 141

310 245 555 MHB-28: 310 ft (94.5 m) @ 0.35%

CuEQ from 245 to 555 0.12 0.35 0. 35 1239 175 25 71 787

20 560 580 MHB-28: 20 ft (6.1 m) @ 0.21% CuEQ

from 560 to 580 0.06 0.21 0. 23 488 110 23 14 798

652 595 1247 MHB-28: 652 ft (198.7 m) @ 0.33%

CuEQ from 595 to 1247 0.17 0.33 0. 30 964 235 41 9 297

35 1262 1297 MHB-28: 35 ft (10.7 m) @ 0.18% CuEQ

from 1262 to 1297 0.06 0.18 0. 18 335 243 96 6 519

28 1302 1330 MHB-28: 28 ft (8.5 m) @ 0.19% CuEQ

from 1302 to 1330 0.06 0.19 0. 17 317 253 68 6 645

192 1340 1532 MHB-28: 192 ft (58.5 m) @ 0.21%

CuEQ from 1340 to 1532 0.08 0.21 0. 20 409 407 111 5 381

105 1542 1647 MHB-28: 105 ft (32 m) @ 0.18% CuEQ

from 1542 to 1647 0.08 0.18 0. 18 339 230 115 3 342

71 1692 1763 MHB-28: 71 ft (21.6 m) @ 0.17% CuEQ

from 1692 to 1763 0.06 0.17 0. 16 281 181 216 4 419

MHB-29 81 175 256 MHB-29: 81 ft (24.7 m) @ 0.11% CuEQ

from 175 to 256 0.07 0.11 0. 24 258 31 20 3 27

15 363 378 MHB-29: 15 ft (4.6 m) @ 0.11% CuEQ

from 363 to 378 0.07 0.11 0. 25 262 87 15 3 17

45 417 462 MHB-29: 45 ft (13.7 m) @ 0.1% CuEQ

from 417 to 462 0.06 0.10 0. 22 217 56 30 2 32

50 496 546 MHB-29: 50 ft (15.2 m) @ 0.11% CuEQ

from 496 to 546 0.07 0.11 0. 22 235 87 22 3 22

117 763 880 MHB-29: 117 ft (35.7 m) @ 0.12%

CuEQ from 763 to 880 0.06 0.12 0. 24 281 217 15 1 28

40 885 925 MHB-29: 40 ft (12.2 m) @ 0.1% CuEQ

from 885 to 925 0.06 0.10 0. 23 227 74 40 2 46

120 945 1065 MHB-29: 120 ft (36.6 m) @ 0.12%

CuEQ from 945 to 1065 0.08 0.12 0. 24 281 49 17 2 63

24 1097 1121 MHB-29: 24 ft (7.3 m) @ 0.1% CuEQ

from 1097 to 1121 0.07 0.10 0. 23 235 56 13 2 19

53 1146 1199 MHB-29: 53 ft (16.2 m) @ 0.1% CuEQ

from 1146 to 1199 0.06 0.10 0. 23 235 114 13 2 17

60 1339 1399 MHB-29: 60 ft (18.3 m) @ 0.09% CuEQ

from 1339 to 1399 0.06 0.09 0. 19 180 85 16 5 34

21 2010 2031 MHB-29: 21 ft (6.4 m) @ 0.08% CuEQ

from 2010 to 2031 0.06 0.08 0. 05 38 86 54 3 15

25 2675 2700 MHB-29: 25 ft (7.6 m) @ 0.11% CuEQ

from 2675 to 2700 0.07 0.11 0. 11 122 118 150 5 11

35 2705 2740 MHB-29: 35 ft (10.7 m) @ 0.12% CuEQ

from 2705 to 2740 0.07 0.12 0. 09 109 308 86 4 12

7

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

The Company has implemented a QA/QC program using best industry practices at

the Majuba Hill Project. The samples are transported from the JUBA secure warehouse

or directly from the drill to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS

then transports the prepared pulps to their analytical lab in Reno, Nevada or

Vancouver, B.C. Soil and rock chip samples are transported by the company directly

to Elko or Reno, Nevada.

Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth

sample bags. All samples are analyzed for copper, gold, silver, and 3 3 other

elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an

AAS finish on a 30 gram split. Copper, silver and the remaining 31 elem ents are

determined by ALS method ME -ICP61 which is a four acid digestion and ICP -AES

assay. Approximately 5% of the submitted samples are duplicates and copper-gold-

porphyry commercial standard reference material pulps . The sample rejects and

remaining pulps will be retrieved from ALS.

Qualified Person

The scientific and technical information contained in this news release has been

reviewed by E.L. "Buster" Hunsaker III, CPG 8137 , a non- independent consulting

geologist who is a "Qualified Person" as such term is defined under National

Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").

About Majuba Hill Copper Corp.

Majuba Hill Copper Corp. is engaged in the identification, review and acquisition of

latter stage copper and copper/ silver/gold assets. This is in direct response to the

growing worldwide demand and lack of supply for precious metals fueled by the Green

New Deal in the US and most other developed nations with similar programs aimed

at addressing climate change. Such programs are heavily reliant on silver, gold and

especially copper to produce Electric Vehicles and other renewable power sources, as

well as building infrastructure to provide clean and affordable electricity.

The flagship project is the Majuba Hill copper, silver and gold District located 156

miles outside Reno, Nevada, USA. Management has been mandated to focus on safe,

mining friendly jurisdictions where government regulations are supportive of mining

operations.

On Behalf of the Board of Majuba Hill Copper Corp.

“David Greenway”

David C. Greenway

President & CEO

8

For further information, please contact:

Joel Warawa

VP of Corporate Communications

E: [email protected]

P: 1 (855) 475-0745

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies

of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This news release contains certain statements that may be deemed "forward -looking" statements. Forward looking

statements are statements that are not historical facts and are generally, but not always, identified by the words

"expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or

that events or conditions "will", "would", "may", "could" or "should" occur. Although Majuba Hill Copper Corp.

believes the expectations expressed in such forward- looking statements are based on reasonable assumptions, such

statements are not guarantees of future performance and actual results may differ materially from those in forward

looking statements. Forward looking statements are based on the beliefs, estimat es and opinions of Majuba Hill

Copper Corp. management on the date the statements are made. Except as required by law, Majuba Hill Copper Corp.

undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates

or opinions, or other factors, should change.