Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BFG.CN ·

Majuba Hill Copper Completes Deep Core Hole MHB-29: Extends Visible Mineralization to 3607 feet (1099 m)

Drill Results

1

*Press Release September 27, 2022

Majuba Hill Copper Completes Deep

Core Hole MHB-29: Extends Visible

Mineralization to 3607 feet (1099 m)

VANCOUVER, BC — September 27, 2022 — Majuba Hill Copper Corp. (CSE: JUBA /

OTC: JUBAF / FWB:4NP) (“Majuba Hill Copper” or the “Company”) is pleased to report

completion of MHB -29 the third and final core hole in the 2022 deep core drilling

program at the Majuba Hill Porphyry Copper Project in Pershing County, Nevada.

Hole MHB-29 was drilled to 3607 feet (1099 m). MHB-29 core is currently being sawn

and sampled at the Majuba Hill Copper Corp warehouse. MHB-27 and MHB-28 have

been sawn and submitted to ALS USA Inc. for analysis. All assay analyses are

expected to be complete within 10 to 12 weeks.

MHB-29 intersected granodiorite at 3,403 feet. Sulfide mineralization occurs as along

veins and disseminated throughout the core.

2

MHB-29: Secondary Biotite and molybdenum in skarn-block within the rhyolite

intrusive

MHB-29: Granodiorite at 3467 feet with secondary biotite (Potassic Alteration)

quartz veining and stockwork at 3467 feet

3

Buster Hunsaker, Consulting Geologist to Majuba Hill Copper Corp. and a member of

the Advisory Board commented:

“The sulfides logged throughout the granodiorite included molybdenum,

pyrite, pyrrhotite, and chalcopyrite. W e expect high- grade copper

mineralization to be adjacent or below this zone based on the porphyry

copper modeling work published by Scott Halley, John H. Dilles, and

Richard M. Tosdal in Footprints: Hydrothermal Alteration and

Geochemical Dispersion Around Porphyry Copper Deposits; in Society of

Economic Geologists, Discovery January 2015.”

David Greenway, President and CEO, commented: “The incredible depth of the

mineralization is very encouraging as we begin to plan for additional drilling on the

Majuba Target and the four other primary target zones.”

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

The Company has implemented a QA/QC program using best industry practices at

the Majuba Hill Project. The samples are transported from the JUBA secure warehouse

or directly from the drill to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS

then transports the prepared pulps to their analytical lab in Reno, Nevada or

Vancouver, B.C. Soil and rock chip samples are transported by the company directly

to Elko or Reno, Nevada.

Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth

sample bags. All samples are analyzed for copper, gold, silver, and 3 3 other

elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an

AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are

determined by ALS metho d ME-ICP61 which is a four acid digestion and ICP -AES

assay. Approximately 5% of the submitted samples are drill duplicates and copper-

gold-porphyry commercial standard reference material pulps. The sample rejects and

remaining pulps will be retrieved from ALS.

Qualified Person

The scientific and technical information contained in this news release has been

reviewed by E.L. "Buster" Hunsaker III, CPG 8137 , a non- independent consulting

geologist who is a "Qualified Person" as such term is defined under National

Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").

About Majuba Hill Copper Corp.

Majuba Hill Copper Corp. is engaged in the identification, review and acquisition of

latter stage copper and copper/ silver/gold assets. This is in direct response to the

growing worldwide demand and lack of supply for precious metals fueled by the Green

4

New Deal in the US and most other developed nations with similar programs aimed

at addressing climate change. Such programs are heavily reliant on silver, gold and

especially copper to produce Electric Vehicles and other renewable power sources, as

well as building infrastructure to provide clean and affordable electricity.

The flagship project is the Majuba Hill copper, silver and gold District located 156

miles outside Reno, Nevada, USA. Management has been mandated to focus on safe,

mining friendly jurisdictions where government regulations are supportive of mining

operations.

On Behalf of the Board of Majuba Hill Copper Corp.

“David Greenway”

David C. Greenway

President & CEO

For further information, please contact:

Joel Warawa

VP of Corporate Communications

E: [email protected]

P: 1 (855) 475-0745

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the policies

of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward-Looking Statements

This news release contains certain statements that may be deemed "forward-looking" statements. Forward looking

statements are s tatements that are not historical facts and are generally, but not always, identified by the words

"expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or

that events or conditions "will", "would", "may", "could" or "should" occur. Although Majuba Hill Copper Corp. believes

the expectations expressed in such forward-looking statements are based on reasonable assumptions, such

statements are not guarantees of future performance and actual res ults may differ materially from those in forward

looking statements. Forward looking statements are based on the beliefs, estimates and opinions of Majuba Hill Copper

Corp. management on the date the statements are made. Except as required by law, Majuba H ill Copper Corp.

undertakes no obligation to update these forward-looking statements in the event that management's beliefs, estimates

or opinions, or other factors, should change.

###