Monday, September 14, 2026
MiningNewsTerminal
Monday, September 14, 2026 Admin

BFG.CN ·

Giant Mining Plans Up to 10,000-Foot Multi-Phase Drill Program at Majuba Hill Copper-Silver Project, Nevada

Drill Results Marketing Announcement

1

Press Release January 30, 2026

Giant Mining Plans Up to 10,000-Foot Multi-Phase Drill

Program at Majuba Hill Copper-Silver Project, Nevada

VANCOUVER, BC — January 30, 2026 — Giant Mining Corp. (CSE: BFG |

OTC: BFGFF | FWB: YW5 | CSE: BFG.WT.A | CSE: BFG.WT.B. ) (“Giant

Mining” or the “Company”) is pleased to announce the Company is planning

Up to 10,000 Feet (3,048 Meters) of drilling in a multi phased drill program

(“Drill Program”) and exploration program at the Company’s 9,684 acre

flagship Majuba Hill Project Copper-Silver-Gold Project in Pershing County,

Nevada.

The multi phased Drilling and Exploration Program is anticipated to include

• Phase 1 – Up to 5,000-foot (1,524 meters) Core Drill Program

• Underground Mapping and Sampling

• Additional Surface Sampling for Additional Follow Up Drill Targeting

• Phase 2 – Up to 5,000-foot (1,524 meters) Core Drill Program

The multi phased drill ing and exploration program will be guided by over 100

previous drill holes across more than 89,000 feet of drilling and will include input

from RESPEC Engineering. Recent reviews of the 2024-2025 exploration results,

including all drilling, surface geologic mapping, and surface geochemical

sampling his identified numerous mineralized breccia bodies (See NR dated

January 16, 2024). Intercepts in multiple drill holes returned high grade copper

and silver as well as long intervals of anomalous gold. The high-grade intercepts

typically occur within hydrothermal-magmatic tourmaline matrix breccias and on

the margins of tourmaline matrix breccia pipes.

David Greenway, President and CEO of Giant Mining “This planned multi-

phase drill and exploration program represents an important next step in

advancing Majuba Hill. Our focus is on systematically testing priority copper-

silver targets informed by geological mapping, surface sampling, and the

2

project’s extensive historical dataset. Majuba Hill is a large, well-located system

in a proven Nevada mining jurisdiction, and this program is designed to refine

our understanding of the controls on mineralization and support continued,

disciplined exploration. With strong infrastructure, year-round access, and a

phased approach to drilling, we believe Majuba Hill offers compelling potential

as we work to unlock additional value for shareholders and contribute to

America’s priority of securing a domestic, reliable supply of critical copper and

silver.”

Breccia Zones

Key characteristics typically associated with intrusive-related tourmaline breccia

pipes that have been identified include:

• High-grade zones in shingle clast breccias adjacent to sharp breccia

contacts and hydrothermal-magmatic breccias

• Multielement associations (Cu, Ag, Au, Mo, As, and Bi)

• Downward flaring geometry (inverted cone)

• Long vertical extent (>3000 feet/1000 m)

• Disseminated copper mineralization related to potassic altered intrusions

Target Breccia Zones

Three breccia zones (Southern, Ball Park, and Northern Breccia Zones) will be

targeted for drilling in the 2026 Phase 1 program. The breccia zones are outlined

based on recent and historic drilling, 3D grade and geologic modeling, and

surface geochemistry. The zones are located at the intersection of northwest and

northeast structural corridors (see Figure 1).

In the Southern Breccia Zone detailed underground mapping and sampling is in

progress to identify breccia margins in the accessible underground workings.

Surface mapping is also in progress on the Ball Park Breccia and will soon

commence in the Northern Breccia Zone to delineate the breccia margins.

Additional surface sampling and reconnaissance geologic mapping is planned for

the DeSoto, Copper-Gold, Section 4 Targets (see Figure 1). These targets have

been outlined by the ongoing exploration of the Company from property-wide

soil geochemistry and geophysics. The recent breccia and project reviews have

highlighted these areas for additional follow-up that may warrant drilling during

Phase 2.

3

Figure 1: Majuba Hill showing Southern, Northern, and Ball Park Breccia

Zones, tourmaline breccia pipes, and regional faulting

Breccia Formation at Majuba Hill

Hydrothermal-magmatic breccias and breccia pipes at Majuba Hill formed by the

explosive release of gas-rich fluids from cooling magma bodies. The breccias are

composed of breccia clasts (which are broken fragments of the surrounding rocks) that

are cemented together by a matrix material (which is typically composed of quartz,

tourmaline, sulfides, and oxidized sulfides) . Core from hole MHB- 2 is an excellent

example of a mineralized breccia (see Figure 2).

Figure 2: Core Hole MHB -2 showing brown and tan breccia Clasts with blue

oxidized copper Matrix (azurite and malachite) cementing Clasts. Left Photo:

Clasts and Matrix labeled

4

The importance of breccias related to copper deposits has been documented since the

early 1900’s. Modern exploration and mining have developed very descriptive

conceptual models with key features. Figure 3 shows the stages of development of a

tourmaline breccia pipe.

Figure 3: Tourmaline Breccia Pipe Conceptual Model (modified Kirwin, 2018)

Breccia Targeting at Majuba Hill

Giant has assembled a comprehensive exploration database from all drilling,

geologic mapping, soil and rock geochemistry, and geophysics. The recent

Breccia Study reviewed the 3D geology and mineralization modeling from the

database, identifying numerous breccia bodies and mineralized breccias that are

priority targets for the 2026 program. Phase 1 drilling in 2026 will comprise six

to eight holes totaling up to 5,000 feet of core targeting breccia margins across

three main tourmaline breccia zones. With the goal of cutting both sides of the

pipes into high-grade copper (+/-silver and gold).

Two fences are planned for the Southern Breccia Zone (see Figure 4). Drill fences

will be located to explore for the continuation of the high-grade intercepts in

core holes MHB-30 and MHB-32 and to extend the mineralization further up

along the margins of the pipe to the peak of Majuba Mountain. MHB-30 and MHB-

32 returned high grade copper and silver as well as highly anomalous gold. The

high-grade intercepts correlate with the margins of the breccia pipes (see Table

1).

5

Hole Interval

(m)

From

(m)

To

(m)

Cu

(%)

Ag

(ppm)

Au

(ppm)

Interval

(ft)

From

(ft)

To

(ft)

Observe

Breccia

Margin

MHB-30 Entire Hole 243.8 0.0 243.8 0.43 24.60 0.03 800.0 0 800.0 Yes

66.4 0.0 66.4 1.35 73.40 0.07 218.0 0 218.0

includes 22.6 42.7 65.2 2.72 30.73 0.09 74.0 140 214.0

MHB-32 Entire Hole 271.1 0.0 271.1 0.16 9.24 0.02 889.5 0 889.5 Yes

Significant

Interval 115.7 155.4 271.1 0.33 16.97 0.04 379.5 510 889.5

includes 25.9 155.4 181.4 0.64 50.89 0.06 85.0 510 595.0

also

includes 51.7 219.5 271.1 0.42 9.73 0.02 169.5 720.0 889.5

with 12.2 237.7 249.9 1.36 13.33 0.02 40.0 780 820.0

with 3.0 245.4 248.4 4.36 35.65 0.04 10.0 805 815.0

Table 1: Assay Summary of significant intercepts for core holes cutting

known pipes

Figure 4: Southern Breccia Zone previous drilling and planned drill

holes.

6

One fence of holes is planned for the Ball Park Breccia Zone (see Figure 5).

Surface mapping of limonite matrix breccias and recent soil geochemical

sampling (See NR November 19, 2025) indicates the conical shaped hill could

be the uppermost portion of a tourmaline breccia pipe (see Figure 3). Historic

drill hole MF-02 intersected:

• 120 ft (36.6 m) @ 0.51% Cu and 21.7 g/t Ag from 260 ft to 380 ft (79.2-

115.8 m).

A geological description is not available for hole MF-02. However, MM-17, an

adjacent core hole drilled:

• 94 ft (28.65 m) of tourmaline breccia from 302.8 to 396.8 ft (92.3-120.9

m)

Figure 5: Ball Park Breccia Zone previous drilling and planned drill holes.

One fence of holes is planned to test the Northern Breccia Zone. These are step

out holes to test prominent outcropping tourmaline breccia and anomalous Cu,

Mo, and silver in historic soil geochemical anomaly (see Figure 6).

7

Figure 6: Ball Park Breccia Zone previous drilling and planned drill holes.

Majuba Hill’s critically important characteristics are as follows:

Location:

Nevada, USA — a globally top-ranked mining jurisdiction,

ranked #1 in the Fraser Institute’s 2022 Annual Survey of

Mining Companies.

Project Size: 9,684 Acres

Infrastructure:

The Majuba Hill property is located 113 road kilometers (70

miles) southwest of Winnemucca, Nevada, and 251 kilometers

(156 miles) northeast of Reno. It is accessible via well -

maintained county roads from the Imlay, Nevada exit on U.S.

Interstate 80, followed by a 23-mile drive west. People, roads,

power, and water are fundamental considerations for

infrastructure, and Majuba Hill already benefits from a strong

foundation in all these areas. This existing infrastructure

provides a significant advantage, offering substantial cost

savings compared to more remote projects.

8

History: Historical Producer

Drilling:

Approximately 89,395 feet of drilling to date. Rough

replacement value of drilling USD $12.1 Million using current

costs.

Mineralization:

The project shows indications of a potentially large Cu – Ag +/-

Au mineralized body with many features in common with both

large porphyry copper, silver, and gold projects.

Expandability:

The IP survey, deep drilling, and step-out drilling indicate

significant expansion potential, with mineralization open in all

directions.

Fully Financed: The Company has secured funding for its next phase of drilling

at Majuba Hill.

Qualified Person

The scientific and technical information contained in this news release has been reviewed

and approved by E.L. “Buster” Hunsaker III, CPG 8137, a non-independent consulting

geologist who is a “Qualified Person” as such term is defined under National Instrument

43-101 – Standards of Disclosure for Mineral Projects (“NI 43- 101”).

Marketing and Investor Awareness Disclosure

The Company has entered into an extension of its agreement, dated January 23, 2026,

with Gold Standard Media, LLC (“GSM”), pursuant to which GSM and its affiliates will

continue to provide advertising and investor awareness services to the Company. Such

services include but are not limited to: (i) the creation and management of landing pages;