Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BFG.CN ·

Giant Mining Majuba Hill Corehole MHB-30 shipped for Analysis

Corporate Updates

1

*Press Release August 26, 2024

Giant Mining Majuba Hill Corehole MHB-30 shipped

for Analysis

VANCOUVER, BC — August 26, 2024 — Giant Mining Corp. (CSE: BFG | OTC:

BFGFF | FWB: YW5) (“Giant Mining” or the “Company”) is pleased to announce

that all the core from Hole MHB-30 (“MHB-30”) which is the first hole of the diamond

core drilling program (the “Core Program”) at the Majuba Hill Porphyry Copper

Deposit ( “Majuba H ill”) in Pershing County, Nevada has been delivered to ALS

Global Services (“ALS Labs”) in Elko, Nevada, to begin the analytical process.

Recent comprehensive reviews by the Giant Team which included renowned geologist

Leo Hathaway (Member of the Advisory Board), n oted i mportant mineralization

controls during the surface traverses of the Majuba Hill drill sites and while examining

the underground workings. Distinct magmatic-hydrothermal breccias were observed

controlling high-grade copper in the >0.5% Cu domain from the 2023 Block Model

(See NI43-101 Report available at giantminingcorp.com).

Figure 1 - MHB-30 Copper Mineralized Fragments in Magmatic-Hydrothermal Breccia

The recent core drilling intersected the magmatic-hydrothermal breccia bodies in core

hole MHB-30 and MHB-31, as can be seen in Figures 1 and 2. Drill hole MHB-31 drilled

in the gap zone between whittle pits 13 and 43 as shown on Figure 3 and Figure 4.

The Team also reviewed the nearly 25,000 meters of drilling at the company ’s core

shed and offices in Elko, Nevada that makes up the basis for the Exploration Target

2

50,000,000 to 100,000,000 tonnes. (See NI43 -101 Report available at

giantminingcorp.com).

Figure 2 - MHB-31/9.5 meters (31 feet) Copper Mineralized Fragments in Magmatic-

Hydrothermal Breccia

Figure 3 - Cross Section from Block Model – Company Presentation available at

giantminingcorp.com

“We are pleased with the progress of our drilling program at Majuba Hill, particularly

with assays still pending and a team that is fully engaged to take the Majuba Hill

Deposit to the next level ," said David Greenway, CEO of Giant Mining. "We look

3

forward to receiving the lab results from ALS Global Services, which will Further our

understanding of the deposit and its potential to become a future domestic supply of

copper for North America."

Leo Hathaway, Advisor to Giant Mining, commented “It is encouraging to see these

two holes intersect breccias over wider intervals than predicted, and it is exciting to

await results from these mineralized bodies. As the geology model evolves Buster

and his team are able to target holes more and more effectively to find better grade

and continuity”.

Figure 4 - Giant Mining historic holes in red and planned drilling in green (RC) and blue (Core)

Quality Assurance/Quality Control (“QA/QC”) Measures, Chain of Custody

The Company utilizes a QA/QC program using best industry practices at the Majuba

Hill Project. The samples are placed in cloth or plast ic sample bags and are

transported from the Giant Mining secure warehouse or directly from Woods Process

to the ALS Labs Sample Prep Facility in Elko, Nevada. ALS then transports the

prepared pulps to their analytical lab in North Vancouver, B.C.

Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth

sample bags. All samples are analyzed for copper, gold, silver, and 33 other

4

elements. Gold is determined by ALS Labs method Au-AA23 which is a fire assay with

an AAS finish on a 30-gram split. Copper, silver, and the remaining 31 elements are

determined by ALS Labs method ME -ICP61 which is a four -acid digestion and ICP -

AES assay. Approximately 10% of the submitted samples are drill duplicates and

copper-gold-porphyry commercial standard reference material pulps. The sample

rejects and remaining pulps will be retrieved from ALS Labs.

Qualified Person

The scientific and technical information contained in this news release has been

reviewed and approved by E.L. “Buster” Hunsaker III, CPG 8137, a non-independent

consulting geologist who is a “Qualified Person ” as such term is defined

under National Instrument 43 -101 – Standards of Disclosure for Mineral Projects

(“NI 43- 101”).

About Giant Mining Corp.

Giant Mining Corp. is engaged in the identification, review and acquisition of latter

stage copper and copper/silver/gold assets. This is in direct response to the growing

worldwide demand and lack of supply for precious metals fueled by the Green New

Deal in the US and most other developed nations with similar programs aimed at

addressing climate change. Such programs are heavily reliant on silver, gold and

especially copper to produce Electric Vehicles and other renewable power sources, as

well as building infrastructure to provide clean and affordable electricity.

The flagship project is the Majuba Hill copper, silver and gold District located 156

miles (251 km) outside Reno, Nevada, USA. Management has been mandated to

focus on safe, mining friendly jur isdictions where government regulations are

supportive of mining operations.

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is

defined in the policies of the Canadian Securities Exchange) accepts responsibility for

the adequacy or accuracy of this release.

On Behalf of the Board of Giant Mining Corp.

“David Greenway”

David C. Greenway

President & CEO

For further information, please contact:

Joel Warawa

VP of Corporate Communications

E: [email protected]

P: 1 (855) 475-0745

5

VISIT OUR WEBSITE FOR MORE DETAILS

www.giantminingcorp.com

LIKE AND FOLLOW

Instagram, Facebook, Twitter, LinkedIn

DOWNLOAD INVESTOR INFORMATION

Click Here

Forward-Looking Statements

This news release contains certain statements that may be

deemed "forward-looking" statements. Forward looking statements are statements

that are not historical facts and are generally, but not always, identified by the words

"expects", "plans", "anticipat es", "believes", "intends", "estimates", "projects",

"potential" and similar expressions, or that events or conditions "will", "would",

"may", "could" or "should" occur. Although Giant Mining Corp. believes the

expectations expressed in such forward-looking statements are based on reasonable

assumptions, such statements are not guarantees of future performance and actual

results may differ materially from those in forward looking statements. Forward

looking statements are based on the beliefs, estimates and opinions of Giant Mining

Corp. management on the date the statements are made. Except as required by law,

Giant Mining Corp. undertakes no obligation to update these forward -looking

statements in the event that management's beliefs, estimates or opinions, or other

factors, should change.

###