Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BFG.CN ·

Giant Mining Majuba Hill Core Hole MHB-31 Shipped for Analysis

Corporate Updates

1

Press Release October 7, 2024

Giant Mining Majuba Hill Core Hole MHB-31 Shipped

for Analysis

VANCOUVER, BC — October 7, 2024 — Giant Mining Corp. (CSE: BFG |

OTC: BFGFF | FWB: YW5) (“Giant Mining” or the “Company”) is pleased

to announce that all the core from Hole MHB-31 (“MHB -31”) from the

diamond core drilling program (the “Core Program” ) at the Majuba Hill

Porphyry Copper Deposit (“Majuba Hill”) in Pershing County, Nevada have

been delivered to ALS Global Services (“ALS Labs”) in Elko, Nevada.

Hole MHB-31 was an inclined hole drilled to a total depth of 1,086 fee t (331

meters) with a 310⁰ azimuth and -50⁰ inclination.

Figure 1: Giant Mining MHB-31 in gap zone, drilling northwest (310⁰) towards MHB-30

2

Magmatic-Hydrothermal breccias logged in MHB-31 are similar to those

identified in MHB-30 which returned 74.0 feet (22.6 meters) of 2.6% Cu and

30.1 g/t Ag within 218.0 feet of 1.35% Cu and 73.4 g/t Ag.

Figure 2: MHB-31 Core @910-912 ft (277.4-278 meters) with Cuprite (red). Note magmatic-

hydrothermal breccias.

Magmatic breccias and fracture zones with strong oxide copper occur throughout

MHB-31.

Figure 3: MHB-31 Core with azurite and malachite @ 31 feet (left photo) and 1026 feet (right

photo)

3

“We are excited to advance our exploration efforts at Majuba Hill,” said David

Greenway, CEO of Giant Mining. "We look forward to receiving the lab results

from ALS labs, which will further our understanding of the deposit’s potential

to become a significant domestic supply of copper for the USA and for the

benefit of all Giant Mining stakeholders."

The 2024 core and reverse circulation drilling program was designed to in-fill

and drill new targets to expand the near surface, open-pit, 50 to 100 million

tonnes, Exploration Target that has grades estimated from 0.15% Cu to

0.30% Cu (NI43-101 2023 Report is available at giantminingcorp.com). 2024

holes are planned to improve the copper grades and provide sufficient

confidence in the results and make way for Giant’s NI 43-101 maiden mineral

resource estimate (“MRE”).

As previously announced in the September 12, 2024 news release, the

Company is preparing for the Reverse Circulation (“RC”) portion of the drilling

campaign which will drill up to 12,800 feet (3,901 meters) across 16 strategic

holes.

Quality Assurance/Quality Control (“QA/QC”) Measures, Chain of

Custody

The Company utilizes a QA/QC program using best industry practices at the

Majuba Hill Project. The samples are placed in cloth or plastic sample bags

and are transported from the Giant Mining secure warehouse or directly from

Woods Process to the ALS Labs Sample Prep Facility in Elko, Nevada. ALS then

transports the prepared pulps to their analytical lab in North Vancouver, B.C.

Drill core samples are sawn in half lengthwise and one half is placed in labeled

cloth sample bags. All samples are analyzed for copper, gold, silver, and 33

other elements. Gold is determined by ALS Labs method Au-AA23 which is a

fire assay with an AAS finish on a 30-gram split. Copper, silver, and the

remaining 31 elements are determined by ALS Labs method ME-ICP61 which

is a four-acid digestion and ICP-AES assay. Approximately 10% of the

submitted samples are drill duplicates and copper-gold-porphyry commercial

standard reference material pulps. The sample rejects and remaining pulps

will be retrieved from ALS Labs.

Qualified Person

The scientific and technical information contained in this news release has

been reviewed and approved by E.L. “Buster” Hunsaker III, CPG 8137, a non-

independent consulting geologist who is a “Qualified Person” as such term is

4

defined under National Instrument 43-101 – Standards of Disclosure for

Mineral Projects (“NI 43- 101”).

About Giant Mining Corp.

Giant Mining Corp. is engaged in the identification, review and acquisition of

latter stage copper and copper/silver/gold assets. This is in direct response to

the growing worldwide demand and lack of supply for precious metals fueled by the

Green New Deal in the US and most other developed nations with similar programs

aimed at addressing climate change. Such programs are heavily reliant on silver, gold

and especially copper to produce Electric Vehicles and other renewable power

sources, as well as building infrastructure to provide clean and affordable electricity.

The flagship project is the Majuba Hill copper, silver and gold District located 156

miles (251 km) outside Reno, Nevada, USA. Management has been mandated to

focus on safe, mining friendly jurisdictions where government regulations are

supportive of mining operations.

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is

defined in the policies of the Canadian Securities Exchange) accepts responsibility for

the adequacy or accuracy of this release.

On Behalf of the Board of Giant Mining Corp.

“David Greenway”

David C. Greenway

President & CEO

For further information, please contact:

E: [email protected]

P: 1 (604)-499-6791

VISIT OUR WEBSITE FOR MORE DETAILS

www.giantminingcorp.com

LIKE AND FOLLOW

Instagram, Facebook, Twitter, LinkedIn

DOWNLOAD INVESTOR INFORMATION

Click Here

5

Forward-Looking Statements

This news release contains certain statements that may be deemed "forward-looking"

statements. Forward looking statements are statements that are not historical facts

and are generally, but not always, identified by the words "expects", "plans",

"anticipates", "believes", "intends", "estimates", "projects", "potential" and similar

expressions, or that events or conditions "will", "would", "may", "could" or "should"

occur. Although Giant Mining Corp. believes the expectations expressed in such

forward-looking statements are based on reasonable assumptions, such statements

are not guarantees of future performance and actual results may differ materially

from those in forward looking statements. Forward looking statements are based on

the beliefs, estimates and opinions of Giant Mining Corp. management on the date

the statements are made. Except as required by law, Giant Mining Corp. undertakes

no obligation to update these forward -looking statements in the event that

management's beliefs, estimates or opinions, or other factors, should change.