Monday, September 14, 2026
MiningNewsTerminal
Monday, September 14, 2026 Admin

BFG.CN ·

Giant Mining Launches 2026 Exploration Program at Majuba Hill Copper Project in Nevada

1

Press Release March 13, 2026

Giant Mining Launches 2026 Exploration Program at

Majuba Hill Copper Project in Nevada

VANCOUVER, BC — March 13, 2026 — Giant Mining Corp. (CSE: BFG |

OTC: BFGFF | FWB: YW5 | CSE: BFG.WT.A | CSE: BFG.WT.B.) (“Giant

Mining” or the “Company”) is pleased to announce that the 2026 exploration

season is underway at its Majuba Hill Copper Project in Pershing County, Nevada.

The geologic team has begun systematic mapping and sampling across multiple

prospective areas of the property.

Figure 1: Big Sky Drilling Equipment on Site during 2025 drill campaign

The program is designed to strengthen the geological model and prioritize the

most prospective breccia-hosted copper targets for upcoming drilling.

Majuba Hill is a large copper-silver-gold intrusive-related system with over 100

historical drill holes totaling approximately 89,000 feet, and a long history of

copper production and exploration.

2

“Launching the 2026 exploration season marks an exciting step forward for the

Majuba Hill project,” said David Greenway, President and CEO of Giant Mining

Corp. “Majuba Hill hosts a large hydrothermal breccia system with demonstrated

copper-silver mineralization from prior drilling. Our current program is focused

on refining high-priority targets and preparing for the next phase of diamond

drilling. With a strong technical team on site and clear exploration targets

identified, we believe Majuba Hill represents a compelling opportunity to advance

a significant copper system in Nevada.”

Figure 2: Majuba Hill Project 2026 Phase 1 Target Areas

2026 Exploration Program Underway

The Company’s geological team has initiated a program of detailed geological

mapping, structural interpretation, surface and underground geochemical

sampling, enhanced by ongoing review of all core results. The results will be

used to refine high-priority drill targets ahead of the Company’s diamond drilling

program.

3

As previously announced on January 30th, 2026, Giant Mining has planned a

multi-phase diamond drilling program of up to 10,000 feet (3,048 meters)

designed to further evaluate copper-silver mineralization across key target

areas.

The Company expects to provide additional updates as exploration activities

progress.

Phase 1

• Up to 5,000 feet of diamond drilling

• Underground mapping and sampling

• Surface geochemical surveys to refine drill targeting

Phase 2

• Up to 5,000 feet of additional drilling

The 2026 exploration and drill program are building on the Company’s previous

exploration work and drilling across the district. Results from the Company’s

2024–2025 exploration programs identified multiple mineralized breccia bodies

associated with hydrothermal-magmatic tourmaline breccias and breccia pipe

margins, which represent priority targets for further drilling.

Several historical drill holes returned elevated copper and silver values with

locally anomalous gold, highlighting the potential for additional mineralization

within the system. (See NR dated January 16, 2024). Drill intercepts returned

elevated copper and silver values, as well as intervals of anomalous gold.

Mineralization is commonly associated with hydrothermal-magmatic tourmaline

matrix breccias and the margins of breccia pipes. Further drilling is required to

determine the extent and continuity of mineralization.

Why Majuba Hill

Majuba Hill is in Pershing County, Nevada, approximately 156 miles (251 km)

northeast of Reno, within one of the world’s most established mining

jurisdictions.

Key project characteristics include:

• Large land position covering approximately 9,684 acres

• Extensive historical drilling database exceeding 89,000 feet

• Multiple mineralized breccia targets identified

• Excellent infrastructure, including road access and nearby power

• Located in Nevada — one of the world’s leading mining jurisdictions

4

Quality Assurance/Quality Control (“QA/QC”)

Historical drilling results referenced herein were previously disclosed by the

Company in accordance with National Instrument 43 -101 – Standards of

Disclosure for Mineral Projects. Analytical work was performed by ALS USA Inc.

("ALS"), an ISO/IEC 17025 accredited prep laboratory located in Elko, Nevada.

Industry standard quality assurance and quality control (QA/QC) procedures

included the insertion of certified reference materials, blanks, and duplicates at

regular intervals within the sample stream. The Qualified Person has reviewed

and verified the data underlying the historical results referenced in this release.

Qualified Person

The scientific and technical information contained in this news release has been reviewed

and approved by E.L. “Buster” Hunsaker III, CPG 8137, a non-independent consulting

geologist who is a “Qualified Person” as such term is defined under National Instrument

43-101 – Standards of Disclosure for Mineral Projects (“NI 43-101”).

Majuba Hill’s critically important characteristics are as follows:

Location:

Nevada, USA — a globally top-ranked mining jurisdiction,

ranked #1 in the Fraser Institute’s 2022 Annual Survey of

Mining Companies.

Project Size: 9,684 Acres

Infrastructure:

The Majuba Hill property is located 113 road kilometers (70

miles) southwest of Winnemucca, Nevada, and 251

kilometers (156 miles) northeast of Reno. It is accessible via

well-maintained county roads from the Imlay, Nevada exit on

U.S. Interstate 80, followed by a 23-mile drive west. People,

roads, power, and water are fundamental considerations for

infrastructure, and Majuba Hill already benefits from a strong

foundation in all these areas. This existing infrastructure

provides a significant advantage, offering substantial cost

savings compared to more remote projects.

History: Historical Producer

Drilling:

Approximately 89,395 feet of drilling to date. Rough

replacement value of drilling USD $12.1 Million using current

costs.

Mineralization:

The project shows indications of a potentially large Cu – Ag

+/- Au mineralized body with many features in common with

both large porphyry copper, silver, and gold projects ;

5

however, further drilling is required to determine the extent

and grade of mineralization.

Expandability:

The IP survey, deep drilling, and step-out drilling indicate

significant expansion potential, with mineralization open in all

directions.

Fully Financed: The Company has secured funding for its next phase of drilling

at Majuba Hill.

About Giant Mining Corp.

Giant Mining is focused on identifying, acquiring, and advancing late-stage copper and

copper/silver/gold projects to meet the growing global demand for critical metals. This

demand is driven by initiatives like the Green New Deal in the United States and similar

climate-focused programs worldwide, which require substantial amounts of copper, silver,

and gold for electric vehicles, renewable energy infrastructure, and the modernization of

clean and affordable energy systems.

The Company’s flagship asset is the Majuba Hill Copper, Silver, and Gold District, located

156 miles (251 km) from Reno, Nevada. Majuba Hill benefits from a mining-friendly

regulatory environment and strong local infrastructure. While still an exploration-stage

asset, the geological footprint and scale of mineralization indicate that further work is

clearly justified and that the system may host significant copper potential.

With a strengthened technical framework, supportive jurisdiction, and funded exploration

program, Giant Mining is focused on advancing Majuba Hill through systematic drilling and

technical evaluation. The Company remains committed to responsible exploration,

technical transparency, and creating long-term shareholder value through discovery-

focused exploration.

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined

in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy

or accuracy of this release.

6

On Behalf of the Board of Giant Mining Corp.

“David Greenway”

David C. Greenway

President & CEO

For further information, please contact:

E: [email protected]

P: 1 (236) 788-0643

VISIT OUR WEBSITE FOR MORE DETAILS

www.giantminingcorp.com

LIKE AND FOLLOW

Instagram, Facebook, Twitter, LinkedIn

DOWNLOAD INVESTOR INFORMATION

Click Here

7

Forward-Looking Statements

This news release contains forward-looking information, including but not limited to

statements regarding planned exploration activities and anticipated outcomes.

This news release contains certain forward-looking information. Such information

involves known and unknown risks, uncertainties and other factors that may cause

actual results, performance or achievements to be materially different from those

implied by statements herein, and therefore these statements should not be read as

guarantees of future performance or results. All forward-looking statements are based

on the Company’s current beliefs as well as assumptions made by and information

currently available to it as well as other factors. Readers are cautioned not to place

undue reliance on these forward-looking statements, which speak only as of the date of

this press release. Due to risks and uncertainties, including the risks and uncertainties

identified by the Company in its public securities filings, actual events may differ

materially from current expectations. These statements involve known and unknown

risks, including exploration, metallurgical, permitting, environmental, commodity price,

and market risks. The Company disclaims any intention or obligation to update or revise

any forward-looking statements, whether as a result of new information, future events

or otherwise.

###