Saturday, September 19, 2026
MiningNewsTerminal
Saturday, September 19, 2026 Admin

BFG.CN ·

Giant Mining Corp. Mobilization for March 2025 Drill Program at Majuba Hill Copper-Silver-Gold Project, Nevada

Exploration Programs

1

Press Release March 14, 2025

Giant Mining Corp. Mobilization for March 2025 Drill Program

at Majuba Hill Copper-Silver-Gold Project, Nevada

VANCOUVER, BC — March 14, 2025 — Giant Mining Corp. (CSE: BFG | OTC:

BFGFF | FWB: YW5) (“Giant Mining” or the “Company”) is pleased to announce that

commencing next week final site preparations, equipment, and water delivery will be underway in

order to commence drilling at the Majuba Hill Porphyry Copper Deposit (“Majuba Hill”), a copper,

silver, and gold project located in Pershing County, Nevada.

Final road drill pad preparations will be completed by Legarza Exploration, LLC (“Legarza”) with

Big Sky Exploration, LLC (“Big Sky”) expected to start drilling on or about March 24, 2025 for the

previously announced diamond core drilling (the “Core Program”).

"Gold is nearing an all-time high of USD $3,000 per ounce and Copper has just hit a 2025 high of

USD $4.93 per lb under threat of Tariffs and looming copper shortfalls. With drilling now less than

two weeks out we are excited to see final site preparations about to get underway. We look forward

to a pivotal moment for Majuba Hill in 2025 following our best results to date in 2024." said David

Greenway, CEO of Giant Mining. "The company is fully funded for an active year of exploration and

development drilling to add to over 100 drill holes and over 80,000 feet of past drilling in order to

work towards a NI 43-101 mineral resource estimate for the project.”

2

Figure 1: Majuba Hill showing 2025 Proposed Drill Hole Locations

As previously announced the Company plans to drill 4 holes totaling 4,400 feet (1,340 meters) of

core drilling within the existing exploration target area. A minimum of 2,600 feet will be completed

and the contract does not have a maximum drilling requirement, allowing for flexibility in the

execution of the project. If the holes are in mineralization beyond the contemplated 1,100 feet (335

meters) per hole the company has allowed for drilling to continue up to 1,600 feet (487 meters).

Blue Sky will be using the LF90D surface diamond coring drill which features a telescopic dump mast

making it ideal for truck or crawler mounting to suit site conditions. The modular layout of

components on the drill makes it easy to replace worn components in the field, minimizing

downtime, and enabling more flexible usage. The LF90D has a total depth capacity of up to 3,915

feet. (1,193 meters) (NRQ W-Wall).

3

Figure 2: Drilling Equipment on Site during previous drill campaigns

The Core Program is designed to follow up geology and mineralization intersected in core holes MHB-

30 (“MHB-30”) and MHB-31 (“MHB-31”).

4

Figure 3: Magmatic-Hydrothermal Breccia Corridors and Prominent Breccia Bodies

This maiden 2025 drill program is a key component of Giant Mining Corp.'s ongoing initiative to

advance exploration efforts at Majuba Hill. The planned drill program will target the Southern

Breccia Corridor with holes oriented to intersect the high-grade mineralized breccia.

Drilling will focus on the deeper portions of the breccia and the extensions of the high-

grade copper zones below the historic underground workings.

Some of Majuba Hill’s critically important characteristics are as follows:

Location: Nevada – The #1 mining jurisdiction on the planet according to the Fraser

Institute

Project Size: 9,684 Acres

Infrastructure: The Majuba Hill property is 113 road km (70 miles) southwest of

Winnemucca, Nevada, and 251 km (156 miles) northeast of Reno. Access

is by well-maintained county roads from the Imlay, Nevada exit on U.S.

Interstate 80, and traveling westward 23 miles. People, Roads, Power and

Water are the basic elements when considering infrastructure and Majuba

Hill already has a solid infrastructure foundation for building a large facility

which will provide significant savings compared to more remote projects.

5

History: Historical Producer

Drilling: 83,930 feet of drilling to date. Rough replacement value of drilling USD

$10.4 Million in development costs.

Mineralization: The project shows indications of a potentially large Cu – Ag +/- Au

mineralized body with many features in common with both large porphyry

copper, silver, and gold projects.

Expandability: The IP survey, deep drilling, and step-out drilling indicate significant

expansion potential, with mineralization open in all directions.

Fully Financed: Secured funding for 2025 Drilling Campaign

Qualified Person

The scientific and technical information contained in this news release has been reviewed and

approved by E.L. “Buster” Hunsaker III, CPG 8137, a non-independent consulting geologist who is

a “Qualified Person” as such term is defined under National Instrument 43-101 – Standards of

Disclosure for Mineral Projects (“NI 43- 101”).

About Giant Mining Corp.

Giant Mining Corp. is focused on identifying, acquiring, and advancing late-stage copper and

copper/silver/gold projects to meet the growing global demand for critical metals. This demand is

driven by initiatives like the Green New Deal in the United States and similar climate-focused

programs worldwide, which require substantial amounts of copper, silver, and gold for electric

vehicles, renewable energy infrastructure, and the modernization of clean and affordable energy

systems.

The Company’s flagship asset is the Majuba Hill Copper, Silver, and Gold District, located 156 miles

(251 km) from Reno, Nevada. Majuba Hill is situated in a mining-friendly jurisdiction with supportive

regulations and has the potential to become one of the next major copper deposits, critical for

meeting the increasing need for this red metal.

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined in the

policies of the Canadian Securities Exchange) accepts responsibility for the adequacy or accuracy of

this release.

On Behalf of the Board of Giant Mining Corp.

“David Greenway”

David C. Greenway

President & CEO

For further information, please contact:

E: [email protected]

P: 1 (236) 788-0643

6

VISIT OUR WEBSITE FOR MORE DETAILS

www.giantminingcorp.com

LIKE AND FOLLOW

Instagram, Facebook, Twitter, LinkedIn

DOWNLOAD INVESTOR INFORMATION

Click Here

Forward-Looking Statements

This news release contains certain forward-looking information. Such information

involves known and unknown risks, uncertainties and other factors that may cause

actual results, performance or achievements to be materially different from those

implied by statements herein, and therefore these statements should not be read as

guarantees of future performance or results. All forward-looking statements are based

on the Company’s current beliefs as well as assumptions made by and information

currently available to it as well as other factors. Readers are cautioned not to place

undue reliance on these forward-looking statements, which speak only as of the date of

this press release. Due to risks and uncertainties, including the risks and uncertainties

identified by the Company in its public securities filings, actual events may differ

materially from current expectations. The Company disclaims any intention or obligation

to update or revise any forward-looking statements, whether as a result of new

information, future events or otherwise.

###