Saturday, September 19, 2026
MiningNewsTerminal
Saturday, September 19, 2026 Admin

BFG.CN ·

Giant Mining Completes 2nd Hole to a Total Depth of 950 Feet and Commences Drilling 3rd Hole of 2025 Core Drill Program at Majuba Hill Copper-Silver-Gold Deposit, Nevada

Exploration Programs

1

Press Release April 8, 2025

Giant Mining Completes 2nd Hole to a Total Depth of 950 Feet

and Commences Drilling 3rd Hole of 2025 Core Drill Program

at Majuba Hill Copper-Silver-Gold Deposit, Nevada

VANCOUVER, BC — April 8, 2025 — Giant Mining Corp. (CSE: BFG | OTC:

BFGFF | FWB: YW5) (“Giant Mining” or the “Company”) is pleased to

announce that Hole MHB-33 (“MHB-32”) has been successfully drilled to a total depth of

950 feet (289.56 meters). MHB-33 is the second of five holes of the 2025 diamond core

drilling program (the “Core Program”), currently underway at the Majuba Hill Porphyry

Copper-Silver-Gold Deposit (“Majuba Hill”) in Pershing County, Nevada.

Figure 1: MHB 33 Drill Rig at Majuba Hill Copper-Silver-Gold Deposit, Nevada

2

As previously stated, the primary objective of the Core Program is to expand the known

zones of copper mineralization at Majuba Hill and advance the project toward a new Mineral

Resource Estimate (“MRE”).

David Greenway, CEO of Giant Mining, commented: "We are excited about the continued

success and efficiency of the geological and drilling team during our ongoing drill program.

This is another step toward advancing Majuba Hill toward our ultimate goal of a new NI

43-101 mineral resource estimate. The scale and potential of this system continue to

impress and the entire team at Giant Mining has never had more conviction in advancing

Majuba Hill toward its true potential.”

Big Sky Exploration, LLC (“Big Sky”) of Eureka, Nevada, successfully completed drilling

of Hole MHB-33 and mobilized the drill rig to a new pad where Hole MHB-34 has

commenced drilling. MHB-33 was quick-logged and tagged for sampling on-site by Giant

Mining geologists (Figure 2), as part of the Company’s efforts to efficiently advance the

2025 Core Program at Majuba Hill.

Figure 2: Azurite, malachite, chalcocite in core from MHB-32: 527 to 537 ft

(160.6-163.6 m)

3

Figure 3: MHB-32 Prepped to Haul to Elko, Nevada Secured Facility

The core samples from MHB-32 are being securely transported to Giant Mining’s secured

warehouse facility in Elko, Nevada. At this location, the cores will undergo systematic

sawing. Following this, the processed samples will be sent to ALS Group USA, Corp. ("ALS

Labs") in Elko, Nevada. At ALS Labs, the samples will undergo rigorous analyses, including

assays for copper, silver, gold, and other trace elements, to accurately assess the mineral

content and support ongoing exploration efforts at Majuba Hill.

As previously reported in the March 17, 2025 news release, the 2025 Core Program has

been designed to follow up on high-grade copper mineralization intersected in breccias

from the 2024 core holes MHB-30 (“MHB-30”) and MHB-31 (“MHB-31”) and extend the

high-grade copper zones below the historic underground workings (Figure 3).

4

Figure 2: Majuba Hill 2025 Actual and Proposed Drill Hole Locations

The Company will provide regular updates as the drill program progresses, including assay

results, geological observations, and any significant developments encountered during

drilling. These updates will keep shareholders and stakeholders informed on the

advancement of the Majuba Hill project and its potential to support a future resource

estimate.

Engagement of Blossom Social Inc.

Giant Mining is pleased to announce it has engaged Blossom Social Inc. ("Blossom"), a

leading mobile app platform and social network for investors recognized by Apple as one

of the Top 25 Apps for 2025, an Essential Finance App of 2024, and an Essential Social

App of 2025. Blossom specializes in investor engagement and hosts a vibrant community

of over 250,000 investors who share verified stock portfolios, trades, and investment ideas

to help users become better investors.

Under the terms of the agreement (the "Blossom Agreement"), Blossom will develop,

and host 'Learn & Earn' educational lessons about Giant Mining on the Blossom mobile app

5

platform.

In consideration of the services, Giant Mining will pay C$20,000 plus applicable taxes. The

initial term of the Blossom Agreement concludes upon reaching the maximum total

consideration, with the option to continue thereafter on a month-to-month basis. Blossom

is located in Burnaby, British Columbia, Canada and is an arm's-length party to the

Company. Blossom may be contacted via email at [email protected] or by phone at

+1 (647) 574-2927.

David Greenway, CEO of Giant Mining Corp., stated, "Partnering with Blossom Social

represents an exciting opportunity to significantly expand our investor outreach and

actively engage a broader audience through their innovative platform and dynamic

investor community of over 200,000 members."

Maxwell Nicholson, CEO of Blossom Social Inc., commented, "We are thrilled to welcome

Giant Mining to Blossom! We look forward to expanding Giant Mining's reach within our

community."

Quality Assurance/Quality Control (“QA/QC”) Measures, Chain of Custody

The Company utilizes a QA/QC program using best industry practices at the Majuba Hill

Project. The samples are placed in cloth or plastic sample bags and are transported from

the Majuba Hill to the Giant Mining secure warehouse for core sawing and processing and

then samples are delivered to the ALS Labs sample prep facility in Elko, Nevada. ALS then

transports the prepared pulps to their analytical lab in North Vancouver, B.C.

Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth sample

bags. All samples are analyzed for copper, gold, silver, and 33 other elements. Gold is

determined by ALS Labs method Au-AA23 which is a fire assay with an AAS finish on a 30-

gram split. Copper, silver, and the remaining 31 elements are determined by ALS Labs

method ME-ICP61 which is a four-acid digestion and ICP-AES assay. Approximately 5% of

the submitted samples are drill duplicates and copper-gold-porphyry commercial standard

reference material pulps. The remaining sample pulps are retrieved from ALS Minerals and

retained by the Company for future metallurgical testing.

Majuba Hill’s critically important characteristics are as follows:

Location:

Nevada, USA — a globally top-ranked mining jurisdiction,

ranked #1 in the Fraser Institute’s 2022 Annual Survey of

Mining Companies.

Project Size: 9,684 Acres

Infrastructure:

The Majuba Hill property is 113 road km (70 miles)

southwest of Winnemucca, Nevada, and 251 km (156 miles)

northeast of Reno. Access is by well-maintained county

6

roads from the Imlay, Nevada exit on U.S. Interstate 80,

and traveling westward 23 miles. People, Roads, Power and

Water are the basic elements when considering

infrastructure and Majuba Hill already has a solid

infrastructure foundation for building a large facility which

will provide significant savings compared to more remote

projects

History: Historical Producer

Drilling: 83,930 feet of drilling to date. Rough replacement value of

drilling USD $10.4 Million in development costs.

Mineralization:

The project shows indications of a potentially large Cu – Ag

+/- Au mineralized body with many features in common

with both large porphyry copper, silver, and gold projects.

Expandability:

The IP survey, deep drilling, and step-out drilling indicate

significant expansion potential, with mineralization open in

all directions.

Fully Financed: Secured funding for 2025 Drilling Campaign

Qualified Person

The scientific and technical information contained in this news release has been reviewed

and approved by E.L. “Buster” Hunsaker III, CPG 8137, a non-independent consulting

geologist who is a “Qualified Person” as such term is defined under National Instrument

43-101 – Standards of Disclosure for Mineral Projects (“NI 43- 101”).

About Giant Mining Corp.

Giant Mining is focused on identifying, acquiring, and advancing late-stage copper and

copper/silver/gold projects to meet the growing global demand for critical metals. This

demand is driven by initiatives like the Green New Deal in the United States and similar

climate-focused programs worldwide, which require substantial amounts of copper, silver,

and gold for electric vehicles, renewable energy infrastructure, and the modernization of

clean and affordable energy systems.

The Company’s flagship asset is the Majuba Hill Copper, Silver, and Gold District, located

156 miles (251 km) from Reno, Nevada. Majuba Hill is situated in a mining-friendly

jurisdiction with supportive regulations and has the potential to become one of the next

major copper deposits, critical for meeting the increasing need for this red metal.

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined

in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy

7

or accuracy of this release.

On Behalf of the Board of Giant Mining Corp.

“David Greenway”

David C. Greenway

President & CEO

For further information, please contact:

E: [email protected]

P: 1 (236) 788-0643

VISIT OUR WEBSITE FOR MORE DETAILS

www.giantminingcorp.com

LIKE AND FOLLOW

Instagram, Facebook, Twitter, LinkedIn

DOWNLOAD INVESTOR INFORMATION

Click Here

Forward-Looking Statements

This news release contains certain forward -looking information. Such information

involves known and unknown risks, uncertainties and other factors that may cause

actual results, performance or achievements to be materially different from those

implied by statements herein, and therefore these statements should not be read as

guarantees of future performance or results. All forward -looking statements are based

on the Company’s current beliefs as well as assumptions made by and information

currently available to it as well as other factors. Readers are cautioned not to place

undue reliance on these forward-looking statements, which speak only as of the date of

this press release. Due to risks and uncertainties, including the risks and uncertainties

identified by the Company in its public securities filings, actual events may differ

materially from current expectations. The Company disclaims any intention or obligation

to update or revise any forward -looking statements, whether as a result of new

information, future events or otherwise.

###