Giant Mining Aligns with White House “America First” Strategy to Fast-Track Critical Minerals and Reshore the U.S. Copper Supply Chain
1
Press Release July 14, 2025
Giant Mining Aligns with White House “America First”
Strategy to Fast-Track Critical Minerals and Reshore the U.S.
Copper Supply Chain
VANCOUVER, BC — July 14, 2025 — Giant Mining Corp. (CSE: BFG | OTC:
BFGFF | FWB: YW5 | CSE: BFG.WT.A | CSE: BFG.WT.B) (“Giant Mining”
or the “Company”) and its stakeholders at the flagship Majuba Hill Copper-
Silver-Gold Project in Pershing County, Nevada, fully support the U.S.
Government’s renewed commitment to fast-track permitting for critical mineral
projects as a matter of national security.
David Greenway, CEO of Giant Mining, commented: “The 2025 Phase 1 drilling at
Majuba Hill marked a bold leap forward — our most ambitious and technically advanced
campaign yet, building on the exceptional grades we achieved in 2024. Under the strong
leadership of President Trump, the United States has issued a clear call to action: secure
2
the metals that power our energy independence, national defense, and critical
infrastructure. Giant Mining stands ready to answer that call. With Majuba Hill, we are
proud to lead the charge in reshoring copper production, revitalizing U.S. mining districts,
and driving long-term value for shareholders — all while putting America First.”
The Company applauds the strategic initiatives announced by President Trump’s
administration, which align directly with Giant Mining’s mission to develop
secure, domestic copper supply chains. These initiatives include:
Fast-Tracked Permitting
Following the March 20, 2025, Executive Order, copper has been formally
designated under FAST-41, significantly accelerating environmental and land-
use reviews. The era of decade-long permitting delays is ending.
Defense Production Act Mobilization
The U.S. Government is deploying the Defense Production Act and launching
new federal financing programs to expand domestic mining and reduce reliance
on foreign supply—essential to national defense and economic security.
Federal Prioritization of Copper
U.S. federal agencies—including the Departments of Interior, Defense, Energy,
and Agriculture—are now actively prioritizing the extraction of copper, rare
earths, nickel, and lithium on public lands. This supports infrastructure
development, clean energy initiatives, and military readiness.
Copper Tariffs to Reshore Production
In July 2025, the U.S. government imposed a 50% tariff on imported copper, a
landmark policy designed to reduce reliance on foreign supply chains. This move
made global headlines and has already triggered increased domestic demand for
U.S.-sourced copper. For projects like Majuba Hill, this policy provides direct
support by incentivizing local production and reinvigorating legacy mining
districts across the country.1
Giant Mining is proud to answer the President’s call to action — building strong,
secure, and sovereign supply chains that support American jobs, energy
independence, and economic security. With President Trump’s clear directive to
prioritize critical minerals under the “America First” agenda, we are committed
to reshoring copper production and strengthening the backbone of the nation’s
1 Source: U.S. Department of Commerce announcement, July 2025; reported by
Reuters and AmericanProgress.org.
3
industrial future.
Project Development Update:
Giant Mining continues to advance exploration and development at Majuba Hill.
The Company recently engaged RESPEC Engineering to complete a NI 43-101
Mineral Resource Estimate (“MRE”) and is incorporating data from its recently
completed Spring drill program. Preparations are underway for an expanded
Summer drill program, positioning the Company to apply for federal programs
now available under the U.S. government’s critical mineral initiatives. All Assays
are now pending from our Spring 2025 drill program with results expected
imminently.
President Donald J. Trump commented: “On July 8, I made it clear: America will
no longer depend on foreign nations for the copper that powers our economy
and our national defense. With a 50% tariff on imported copper, we are
reshoring our supply chains, rebuilding American industry, and putti ng our
workers first. This is about sovereignty, strength, and securing our future. We’re
done with the delays — it’s time to mine and build in America again.”
Majuba Hill’s critically important characteristics are as follows:
Location:
Nevada, USA — a globally top-ranked mining jurisdiction,
ranked #1 in the Fraser Institute’s 2022 Annual Survey of
Mining Companies.
Project Size: 9,684 Acres
Infrastructure:
The Majuba Hill property is 113 road km (70 miles) southwest
of Winnemucca, Nevada, and 251 km (156 miles) northeast
of Reno. Access is by well-maintained county roads from the
Imlay; Nevada exit on U.S. Interstate 80 and traveling
westward 23 miles. People, Roads, Power and Water are the
basic elements when considering infrastructure and Majuba
Hill already has a solid infrastructure foundation for building
a large facility which will provide significant savings compared
to more remote projects
History: Historical Producer
Drilling:
Approximately 89,395 feet of drilling to date. Rough
replacement value of drilling USD $12.1 Million using current
costs.
4
Mineralization:
The project shows indications of a potentially large Cu – Ag
+/- Au mineralized body with many features in common with
both large porphyry copper, silver, and gold projects.
Expandability:
The IP survey, deep drilling, and step-out drilling indicate
significant expansion potential, with mineralization open in all
directions.
Fully Financed: Secured funding for next phase of drilling at Majuba Hill in
June 2025.
Quality Assurance/Quality Control (“QA/QC”) Measures, Chain of Custody
The Company utilizes a QA/QC program using best industry practices at the Majuba Hill
Project. The samples are placed in cloth sample bags and are transported from the Giant
Mining secure warehouse to the ALS Labs Sample Prep Facility in Elko, Nevada. ALS Labs
then securely transports the prepared pulps to their analytical lab in North Vancouver, B.C.
Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth sample
bags. All samples are analyzed for copper, gold, silver, and 33 other elements. Gold is
determined by ALS Labs method Au-AA23 which is a fire assay with an AAS finish on a 30-
gram split. Copper, silver, and the remaining 31 elements are determined by ALS Labs
method ME-ICP61 which is a four-acid digestion and ICP-AES assay. Approximately 5% of
the submitted samples are drill duplicates and copper-gold-porphyry commercial standard
reference material pulps. The remaining pulps will be retrieved from ALS Labs.
Qualified Person
The scientific and technical information contained in this news release has been reviewed
and approved by E.L. “Buster” Hunsaker III, CPG 8137, a non-independent consulting
geologist who is a “Qualified Person” as such term is defined under National Instrument
43-101 – Standards of Disclosure for Mineral Projects (“NI 43- 101”).
About Giant Mining Corp.
Giant Mining is focused on identifying, acquiring, and advancing late-stage copper and
copper/silver/gold projects to meet the growing global demand for critical metals. This
demand is driven by initiatives like the Green New Deal in the United States and similar
climate-focused programs worldwide, which require substantial amounts of copper, silver,
and gold for electric vehicles, renewable energy infrastructure, and the modernization of
clean and affordable energy systems.
The Company’s flagship asset is the Majuba Hill Copper, Silver, and Gold District, located
156 miles (251 km) from Reno, Nevada. Majuba Hill is situated in a mining-friendly
jurisdiction with supportive regulations and has the potential to become one of the next
major copper deposits, critical for meeting the increasing need for this red metal.
5
Neither the Canadian Securities Exchange nor its Market Regulator (as that term is defined
in the policies of the Canadian Securities Exchange) accepts responsibility for the adequacy
or accuracy of this release.
On Behalf of the Board of Giant Mining Corp.
“David Greenway”
David C. Greenway
President & CEO
For further information, please contact:
P: 1 (236) 788-0643
VISIT OUR WEBSITE FOR MORE DETAILS
www.giantminingcorp.com
LIKE AND FOLLOW
Instagram, Facebook, Twitter, LinkedIn
DOWNLOAD INVESTOR INFORMATION
Click Here
Forward-Looking Statements
This news release contains certain forward-looking information. Such information
involves known and unknown risks, uncertainties and other factors that may cause
actual results, performance or achievements to be materially different from those
implied by statements herein, and therefore these statements should not be read as
guarantees of future performance or results. All forward-looking statements are based
on the Company’s current beliefs as well as assumptions made by and information
currently available to it as well as other factors. Readers are cautioned not to place
undue reliance on these forward-looking statements, which speak only as of the date of
this press release. Due to risks and uncertainties, including the risks and uncertainties
identified by the Company in its public securities filings, actual events may differ
materially from current expectations. The Company disclaims any intention or obligation
to update or revise any forward-looking statements, whether as a result of new
information, future events or otherwise.
6
###