Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BFG.CN ·

Bam Bam Plans Expanded Soil Geochemistry Coverage at Majuba Hill Porphyry Copper Project in Nevada

Corporate Updates

1

*Press Release February 17, 2022

Bam Bam Plans Expanded Soil

Geochemistry Coverage at Majuba Hill

Porphyry Copper Project in Nevada

VANCOUVER, BC — February 17, 2022 — Bam Bam Resources Corp. (CSE: BBR /

OTC: NPEZF / FSE: 4NPB) (“Bam Bam” or the “Company”) is pleased to announce

that an expanded soil sampling program is planned for the Majuba Hill Project in

Pershing County, Nevada. The program is designed to expand on the very

encouraging results reported from the 2021 program (see Bam Bam News Release

October 14, 2021). The 2021 soil sampling program expanded the DeSoto Copper

Oxide Target and the Copper-Gold Target zones however the anomalous areas are

still open to the northeast at the DeSoto and to the east of the Copper-Gold Target.

2021 drilling was completed in both target areas and the Porphyry Copper geologic

signatures identified in the core and reverse-circulation chips was very encouraging.

Sampling is planned for to expand these zones as soon as the weather allows.

2

David Greenway, President and CEO, commented: “The very encouraging results

from the newly-discovered DeSoto Copper Oxide and the Copper-Gold Target zones

led us to roll out an expanded soil sampling program. The anomalous areas are still

open to the northeast at the DeSoto and to the east of the Copper-Gold Target and I

look forward to how much further this program will expand the already massive

Majuba Hill copper, silver and gold district size asset.”

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

The Company has implemented a QA/QC program using best industry practices at

the Majuba Hill Project. The samples are transported from the BBR secure warehouse

or directly from the drill to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS

then transports the prepared pulps to their analytical lab in Reno, Nevada or

Vancouver, B.C. Soil and rock chip samples are transported by the company directly

to Elko or Reno, Nevada.

Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth

sample bags. All samples are analyzed for copper, gold, silver, and 33 other

elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an

AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are

determined by ALS method ME-ICP61 which is a four acid digestion and ICP-AES

assay. Approximately 5% of the submitted samples are drill duplicates and copper-

gold-porphyry commercial standard reference material pulps. The sample rejects and

remaining pulps will be retrieved from ALS.

Qualified Person

The scientific and technical information contained in this news release has been

reviewed by E.L. "Buster" Hunsaker III, CPG 8137, a non-independent consulting

geologist who is a "Qualified Person" as such term is defined under National

Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").

About Bam Bam Resources Corp.

Bam Bam Resources Corp. (CSE: BBR / OTC: NPEZF / FSE: 4NPB) is engaged in the

identification, review and acquisition of latter stage copper and copper/silver/gold

assets. This is in direct response to the growing worldwide demand and lack of supply

for precious metals fueled by the Green New Deal in the US and most other developed

nations with similar programs aimed at addressing climate change. Such programs

are heavily reliant on silver, gold and especially copper to produce Electric Vehicles

and other renewable power sources, as well as building infrastructure to provide clean

and affordable electricity.

3

The flagship project is the Majuba Hill copper, silver and gold District located 156

miles outside Reno, Nevada, USA. Management has been mandated to focus on safe,

mining friendly jurisdictions where government regulations are supportive of mining

operations.

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is

defined in the policies of the Canadian Securities Exchange) accepts responsibility for

the adequacy or accuracy of this release.

On Behalf of the Board of Bam Bam Resources Corp.

“David Greenway”

David C. Greenway

President & CEO

For further information, please contact:

Joel Warawa

VP of Corporate Communications

E: [email protected]

P: 1 (855) 475-0745

Forward-Looking Statements

This news release contains certain statements that may be deemed "forward-looking" statements. Forward looking

statements are statements that are not historical facts and are generally, but not always, identified by the words

"expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or

that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes

the expectations expressed in such forward-looking statements are based on reasonable assumptions, such

statements are not guarantees of future performance and actual results may differ materially from those in forward

looking statements. Forward looking statements are based on the beliefs, estimates and opinions of Bam Bam

Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources

Corp. undertakes no obligation to update these forward-looking statements in the event that management's beliefs,

estimates or opinions, or other factors, should change.

###