Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BFG.CN ·

Bam Bam Drill Results Completion Update for Majuba Hill Project in Nevada

Drill Results

1

*Press Release January 24, 2022

Bam Bam Drill Results Completion

Update for Majuba Hill Project in Nevada

VANCOUVER, BC — January 24, 2022 — Bam Bam Resources Corp. (CSE: BBR / OTC:

NPEZF / FSE: 4NPB) (“Bam Bam” or the “Company”) would like to provide an update

for the ongoing analysis of the samples from the 2021 core and reverse -circulation

(“RC”) drill program at the Majuba Hill Project in Pershing County Nevada.

Bam Bam drilled 4,539.5 meters (14,893.5 feet) in sixteen holes. The drill program

was designed to complete in-fill, stepout, and new exploration holes for three areas.

• Majuba Known Copper Oxide (In-fill and Stepout)

• DeSoto Copper Oxide Target (Stepout)

• Copper-Gold Target (New Exploration)

A total of 3,167 samples were submitted to the ALS USA Inc. sample Prep Facilities

in Reno and Elko, Nevada. Bam Bam has an active tracking program and the sample

status information provided by ALS indicates all assays should be complete by early

February. Assay results will be reported as soon as the results are integrated into the

database and the QA/QC analyses are complete.

2

David Greenway, President and CEO, commented: “I am very pleased with the

progress made on the Majuba Hill District in 2021 and we eagerly await the results

from the latest round of drilling. We know that the high grade is present at Majuba,

as seen with previous intersects like 43 ft of 4% Cu with MBH-2.

With the visual reports made on the new ly discovered diorite , we expect the core

assays to show us the importance of what we have discovered. This will help us to

plan for to expanding the mineralization in this significant Copper-Gold Porphyry

deposit.”

Hole Target Type Azimuth Angle Length (m) Length (ft)

MHB-10 Known Oxide RC 0 -90 257.6 845

MHB-11 Known Oxide RC 0 -70 152.4 500

MHB-12 Known Oxide RC 0 -45 213.4 700

MHB-13 Known Oxide RC 0 -90 208.8 685

MHB-14 Known Oxide RC 0 -90 356.6 1170

MHB-15 Known Oxide RC 0 -90 304.8 1000

MHB-16 Known Oxide RC 0 -90 196.3 644

MHB-17 Known Oxide RC 0 -90 243.8 800

MHB-18 Known Oxide RC 0 -90 243.8 800

MHB-19 Known Oxide RC 110 -45 54.9 180

MHB-20 Copper-Gold Core 10 -70 310.0 1017

MHB-21 Known Oxide RC 252 -80 454.2 1490

MHB-22 Copper-Gold Core 140 -60 549.4 1802.5

MHB-23 Known Oxide RC 0 -90 304.8 1000

MHB-24 Known Oxide RC 90 -45 243.8 800

MHB-25 DeSoto RC 0 -90 140.2 460

MHB-26 DeSoto RC 0 -90 304.8 1000

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

The Company has implemented a QA/QC program using best industry practices at

the Majuba Hill Project. The samples are transported from the BBR secure warehouse

or directly from the project to the ALS Sample Prep Facility in Reno or Elko, Nevada.

ALS then t ransports the prepared pulps to their analytical lab in Reno, Nevada or

Vancouver, B.C. Soil and rock chip samples are transported by the company directly

to Elko or Reno, Nevada.

Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth

sample bags. All samples are analyzed for copper, gold, silver, and 3 3 other

elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an

AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are

determined by ALS method ME -ICP61 which is a four acid digestion and ICP -AES

assay. Approximately 5% of the submitted samples are drill duplicates and copper-

gold-porphyry commercial standard reference material pulps.

3

Qualified Person

The scientific and technic al information contained in this news release has been

reviewed by E.L. "Buster" Hunsaker III, CPG 8137, a non -independent consulting

geologist who is a "Qualified Person" as such term is defined under National

Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").

About Bam Bam Resources Corp.

Bam Bam Resources Corp. (CSE: BBR / OTC: NPEZF / FSE: 4NPB) is engaged in the

identification, review and acquisition of latter stage copper and copper/ silver/gold

assets. This is in direct response to the growing worldwide demand and lack of supply

for precious metals fueled by the Green New Deal in the US and most other developed

nations with similar programs aimed at addressing climat e change. Such programs

are heavily reliant on silver, gold and especially copper to produce Electric Vehicles

and other renewable power sources, as well as building infrastructure to provide clean

and affordable electricity.

The flagship project is the Majuba Hill copper , silver and gold District located 156

miles outside Reno, Nevada, USA. Management has been mandated to focus on safe,

mining friendly jurisdictions where government regulations are supportive of mining

operations.

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is

defined in the policies of the Canadian Securities Exchange) accepts responsibility for

the adequacy or accuracy of this release.

On Behalf of the Board of Bam Bam Resources Corp.

“David Greenway”

David C. Greenway

President & CEO

For further information, please contact:

Joel Warawa

VP of Corporate Communications

E: [email protected]

P: 1 (855) 475-0745

Forward-Looking Statements

This news release contains certain statements that may be deemed "forward -looking" statements. Forward looking

statements are statements that are not historical facts and are generally, but not always, identified by the words

"expects", "plans", "anticipat es", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or

that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes

4

the expectations expressed in such forward -looking statements are based on reasonable assumptions, such

statements are not guarantees of future performance and actual results may differ materially from those in forward

looking statements. Forward looking statements are based on the beliefs, estimate s and opinions of Bam Bam

Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources

Corp. undertakes no obligation to update these forward -looking statements in the event that management's beliefs,

estimates or opinions, or other factors, should change.

###