Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

BFG.CN ·

Bam Bam Completes Deep Core Holes at Majuba Hill Nevada Porphyry Project

Exploration Programs

1

Press Release November 23, 2020

Bam Bam Completes Deep Core Holes at

Majuba Hill Nevada Porphyry Project

VANCOUVER, BC — November 23, 2020 — Bam Bam Resources Corp. (CSE: BBR /

OTC: NPEZF / FSE: 4NPB) (“Bam Bam” or the “Company”) is pleased to report

that drilling in core holes MHB-7, MHB-8, and MHB-9 are complete. The core holes

were placed to expand the sulfide copper porphyry mineralization intersected in

historic drilling and to extend the known oxide mineralization. Three holes were

drilled for a total of 4920 feet (1499.6 meters).

Hole Azimuth Inclination Length (ft) Length (m)

MHB-7 0 -90 1473 449.0

MHB-8 125 -70 1635 498.3

MHB-9 315 -45 1812 552.3

All core was transported to a secured facility in Elko, Nevada where it is being detailed

logged, sawed, and sampled. Thereafter, samples will be delivered to the ALS Sample

Prep Facility in Elko.

2

On-site “quick-logging” was encouraging. Zones of copper oxide, disseminated

sulfides, sulfides in stockwork veins, and native copper were observed in the core.

MHB-9 Malachite on fracture MHB-9 Native Copper on Fractures

David Greenway, President & CEO, commented: “I am pleased with the substantial

progress at Majuba this year. Our staged exploration approach continues to advance

the project and provide encouragement that Majuba will become an important

copper, silver, and gold porphyry project. I look forward to receiving the assay results

from the deep core drilling.”

Expanded Property Exploration Underway

The Company is also pleased to note that the property -wide geochemical and

geophysical programs are proceeding well. Bam Bam was able to utilize its

relationship with North American Exploration services to expedite completion of an

expanded soils program. The additional samples extended the soil sample grid into

new areas. Samples were submitted to ALS and initial results are expected in 4 to 6

weeks.

3

Bam Bam has a detailed drone magnetic survey scheduled for late December

2020/early January 2021. This program will add to the ground magnetic survey data

collected in 2018. The recent RC drilling results (BBR News Release October 5, 2020)

are highly correlative with the anomalous mag lows interpreted from the 2018 data.

Bam Bam’s drilling and exploration program for next year is being finalized. The

property-wide work will incorporate and expand the ongoing soil geochemistry and

the deep IP geophysical surveys. The programs are planned to guide the District Level

exploration at Majuba Hill. Final program layouts will be completed after all drill

results have been returned.

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

The Company has implemented a QA/QC program using industry best practices at

the Majuba Hill Project. Drill core is delivered by the Company’s consulting geologist

to the secure warehouse facility in Elko, Nevada. Drill core samples are sawed in half

lengthwise, with one half placed in a labeled cloth sample bag. The samples are then

transported directly to the ALS Sample Prep Facility in Elko, Nevada. ALS transports

the prepared pulps to the analytical lab in Reno, Nevada or Vancouver, B.C. All

samples are analyzed for copper, gold, silver, and 31 o ther elements. Gold is

determined by ALS method Au-AA23, which is a fire assay with an AAS finish on a 30

gram split. Copper, silver, and the other 31 elements are determined by ALS method

ME-ICP61, which is a four acid digestion and ICP-AES assay. Approximately 5% of

the submitted samples are copper-gold-porphyry commercial standard reference

material pulps, which are inserted in the analytical sample sequence. The sample

rejects and remaining pulps will be retrieved from ALS.

About the Majuba Hill Property

The Majuba Hill Property encompasses 4,822 acres of surface and mineral rights that

includes 3 patented lode mining claims and 632 acres of privately owned surface and

minerals. The property is easily accessed via 23 miles of well-maintained dirt roads

leading from U.S. Interstate 80.

Qualified Persons

The scientific and technical information contained in this news release was reviewed

by E.L. "Buster" Hunsaker III, CPG 8137, a non-independent consulting geologist who

is a "Qualified Person" as such term is defined under National Instrument 43-101 -

Standards of Disclosure for Mineral Projects ("NI 43- 101").

About Bam Bam Resources Corp.

Bam Bam Resources Corp. (CSE: BBR / OTC: NPEZF / FSE: 4NPB) is engaged in the

identification, review, and acquisition of latter stage copper and copper/gold assets.

4

The flagship project is the Majuba Hill copper gold project located 156 miles outside

Reno, Nevada, USA. Management has been mandated to focus on safe, mining

friendly jurisdictions, and government regulations supportive of mining operations.

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is

defined in the policies of the Canadian Securities Exchange) accepts responsibility for

the adequacy or accuracy of this release.

On Behalf of the Board of Bam Bam Resources Corp.

“David Greenway”

President & CEO

For further information, please contact:

Joel Warawa

VP of Corporate Communications

E: [email protected]

P: (604) 318-0114

Forward-Looking Statements

This news release contains certain statements that may be deemed "forward-looking" statements. Forward looking

statements are statements that are not historical facts and are generally, but not always, identified by the words

"expects", "plans", "anticipates", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or

that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes

the expectations expressed in such forward -looking statements are based on reasonable assumptions, such

statements are not guarantees of future performance and actual results may differ materially from those in forward

looking statements. Forward looking statements are based on the beliefs, estimates and opinions of Bam Bam

Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources

Corp. undertakes no obligation to update these forward-looking statements in the event that management's beliefs,

estimates or opinions, or other factors, should change.