Bam Bam Begins Additional Soil Sampling at Majuba Hill Porphyry Copper Project
1
*Press Release May 03, 2022
Bam Bam Begins Additional Soil Sampling
at Majuba Hill Porphyry Copper Project
VANCOUVER, BC — May 3, 2022 — Bam Bam Resources Corp. (CSE: BBR / OTC:
NPEZF / FSE: 4NPB) (“Bam Bam” or the “Company”) is pleased to announce that the
expanded soil sampling program is underway for the Majuba Hill Project in Pershing
County, Nevada. The program is designed to expand on the very encouraging results
reported from the 2021 program (see Bam Bam News Release October 14, 2021).
The 2021 soil sampling program expanded the DeSoto Copper Oxide Target and the
Copper-Gold Target zones , however, the anomalous areas are still open to the
northeast at the DeSoto and to the east of the Copper-Gold Target.
David Greenway, President and CEO, commented: “The very -encouraging results
from the newly-discovered DeSoto Copper Oxide and the Copper-Gold Target zones
led us to roll out an expanded soil sampling program. The anomalous areas are still
open to the northeast at the DeSoto and to the east of the Copper-Gold Target and I
look forward to how much further this program will expand the already massive
Majuba Hill copper, silver and gold district size asset.”
2
About Majuba Hill
Copper mineralization at Majuba is centered within a large contiguous land position.
Bam Bam has 100% control of the emerging Majuba Hill Copper District by private
surface and mineral ownership, patented mining claims, and Federal Lode Mining
claims. The property is in Nevada, a Tier 1 mining district that is the most mining
friendly place in North America with well-developed transportation, power, and
workforce infrastructure.
Majuba is easily reached by 23 miles of well -maintained roads leading from U.S.
Interstate 80. The existing highways are sufficient for transportation of exploration-
size heavy equipment. Development logistics will be able to use the 4 lane Interstate
80 highway, Union Pacific railroad tracks, as well as power, natural gas, and fiber
optic transmission lines in the rail – highway corridor.
Qualified Person
The scientific and technical information contained in this news release has been
reviewed by E.L. "Buster" Hunsaker III, CPG 8137 , a non- independent consulting
geologist who is a "Qualified Person" as such term is defined under National
Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").
About Bam Bam Resources Corp.
Bam Bam Resources Corp. (CSE: BBR / OTC: NPEZF / FSE: 4NPB) is engaged in the
identification, review and acquisition of latter stage copper and copper/ silver/gold
assets. This is in direct response to the growing worldwide demand and lack of supply
for precious metals fueled by the Green New Deal in the US and most other developed
nations with similar programs aimed at addressing climate change. Such programs
are heavily reliant on silver, gold and especially copper to produce Electric Vehicles
and other renewable power sources, as well as building infrastructure to provide clean
and affordable electricity.
The flagship project is the Majuba Hill copper, silver and gold District located 156
miles outside Reno, Nevada, USA. Management has been mandated to focus on safe,
mining friendly jurisdictions where government regulations are supportive of mining
operations.
On Behalf of the Board of Bam Bam Resources Corp.
“David Greenway”
David C. Greenway
President & CEO
For further information, please contact:
3
Joel Warawa
VP of Corporate Communications
P: 1 (855) 475-0745
Neither the Canadian Securities Exchange nor its Market Regulator (as that term is
defined in the policies of the Canadian Securities Exchange) accepts responsibility for
the adequacy or accuracy of this release.
Forward-Looking Statements
This news release contains certain statements that may be deemed "forward-looking" statements. Forward looking
statements are statements that are not historical facts and are generally, but not always, identified by the words
"expects", "plans", "anticipat es", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or
that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes
the expectations expressed in such forward-l ooking statements are based on reasonable assumptions, such
statements are not guarantees of future performance and actual results may differ materially from those in forward
looking statements. Forward looking statements are based on the beliefs, estimates and opinions of Bam Bam
Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources
Corp. undertakes no obligation to update these forward-looking statements in the event that management's beliefs,
estimates or opinions, or other factors, should change.
###