Bam Bam Announces Historic Drill Data and Recent Core Sample Results Enhance Drill Targeting at Majuba-DeSoto Copper Oxide Target
1
*Press Release October 20, 2021
Bam Bam Announces Historic Drill Data and Recent Core Sample
Results Enhance Drill Targeting at
Majuba-DeSoto Copper Oxide Target
VANCOUVER, BC — October 20, 2021 — Bam Bam Resources Corp. (CSE: BBR / OTC:
NPEZF / FSE: 4NPB) (“Bam Bam” or the “Company”) has received results for 198.5
meters (651.1 ft) of core from seven historic holes which had not been sampled by
previous operators of the Majuba Hill Project in Pershing County Nevada. The samples
were analyzed using the 31 element ME-ICP61 multi-element and the gold Au-AA23
methods from ALS Minerals, that the Company has been using for all data during the
systematic exploration and drilling at Majuba Hill.
The results are very encouraging because the molybdenum, zinc, lead, and arsenic
zoning strongly correlates with the Magnetic and Induced Polarization (“IP”)
geophysical results. A prominent northwest -trending magnetic linear occurs very
close to the three best historic holes:
• MM-18: 105.7 ft (32.3 m) @ 0.62% Cu and 25.16 g/t Ag
2
from 72 to 177.7 ft (21.9-54.2 m)
• MM-19: 22.6 ft (6.8 m) @ 0.26% Cu and 7.74 g/t Ag
from 2.4 to 25 ft (0.8-7.6 m)
• DSM-02: 25.5 ft (7.8 m) @ 0.57% Cu and 28.09 g/t Ag
from 152.5 to 178 ft (46.5-54.3 m)
• DSM-06: 25 ft (7.6 m) @ 0.64% Cu and 34.66 g/t Ag
from 60 to 85 ft (18.3-25.9 m)
These historic core holes contained several near -surface copper oxide/enriched
intervals that with azurite, malachite, chalcocite, and chrysocolla.
MM-18: Azurite at 103 feet MM-19: Malachite in vein quartz
David Greenway, President and CEO, commented: “I am excited for us to have the
opportunity to test the DeSoto Oxide Zone. Our geology team has been able to
capitalize on the understanding from the drilling, geophysical surveys, geochemical
surveys, and geological mapping completed by Bam Bam. The significant amount of
historic data we have compiled and combined with the modern un derstanding of
Porphyry Copper deposits has proved very valuable for identifying Majuba as a major
District.”
Significant Results and Trace Elements
Ten elements were summarized from the historically reported data and the recent
core intervals results. All values are in ppm. The data have also been compiled using
grade x thickness (“GxT”) calculations for the completed hole for each element.
The GxT calculation show a distinct zoning of lead and zinc outward from the highest
copper grades. This zoning along with zoned clusters of tin (Sn) in the deeper portions
and traces of molybdenum (Mo) suggests a significant likelihood of intersecting the
favorable porphyry at depths of 30 meters (100 ft) to 300 meters (1000 ft).
The initial drill holes are planned to test these zones.
3
Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody
The Company has implemented a QA/QC program using best industry practices at
the Majuba Hill Project. The samples are transported from the BBR secure warehouse
or directly from the drill to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS
then tra nsports the prepared pulps to their analytical lab in Reno, Nevada or
Vancouver, B.C. Soil and rock chip samples are transported by the company directly
to Elko or Reno, Nevada.
Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth
sample bags. All samples are analyzed for copper, gold, silver, and 3 3 other
elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an
Drill Hole Statistical Summary Data Cu Ag As Ba Bi Mo Pb Sb Sn Zn
DSM-01 Count 76 76 76 76 76 76.00 76 76 49 76
Min 5 0.3 3 152 1 0.50 4 3 5 64
Max 5944 36 370 610 18 70.00 784 59 40 1234
Mean 181 1 29 363 2 1.89 72 11 8 174
Std 770 4 56 116 2 8.96 141 11 8 192
DSM-02 Count 41 41 41 41 41 41.00 41 41 6 41
Min 1 0.3 3 204 1 0.50 3 3 20 71
Max 21300 102 520 645 149 3.00 109 8 30 503
Mean 1413 6 36 447 8 0.71 17 3 27 132
Std 3528 17 92 134 24 0.55 20 2 5 97
DSM-03 Count 9 9 9 9 9 9.00 9 9 9 9
Min 8 0.3 3 160 1 0.50 4 5 30 85
Max 725 1 27 630 4 0.50 53 27 70 247
Mean 369 1 14 420 2 0.50 21 13 42 136
Std 276 0 9 183 1 0.00 16 9 19 50
DSM-04 Count 10 10 10 10 10 10.00 10 10 4 10
Min 14 1 3 228 1 0.50 13 3 5 70
Max 3396 19 32 430 8 1.00 136 18 5 218
Mean 503 4 15 346 3 0.55 49 8 5 134
Std Dev 1037 6 8 80 3 0.16 39 7 0 54
DSM-05 Count 31 31 31 31 31 31.00 31 31 31 31
Min 15 0.3 6 200 1 0.50 3 3 5 59
Max 495 2 119 490 6 0.50 173 40 100 738
Mean 62 1 20 326 1 0.50 41 12 16 138
Std Dev 89 1 23 71 1 0.00 47 10 25 138
DSM-06 Count 20 20 19 20 20 20.00 20 20 3 20
Min 38 0.3 25 452 1 0.50 14 3 5 81
Max 14700 82 5916 818 201 1.00 348 61 40 2101
Mean 2051 11 914 600 23 0.53 96 7 25 503
Std Dev 4118 22 1508 94 52 0.11 112 13 18 505
DSM-07 Count 57 57 57 57 57 57.00 57 57 24 57
Min 1 0.3 3 74 1 0.50 1 3 30 54
Max 3617 13 816 1050 26 1.00 133 36 160 252
Mean 203 1 46 619 3 0.51 20 10 78 103
Std Dev 610 2 110 206 5 0.07 29 9 43 37
MM-18 Count 98 98 98 98 98 98.00 98 98 98 98
Min 0.10 0.01 0.10 10.00 0.01 0.03 4.00 0.03 0.10 64
Max 35600 129 4515 670 85 0.50 286 36 75 838
Mean 1573 7 342 308 4 0.05 61 9 15 243
Std Dev 4721 20 887 200 12 0.06 70 8 18 190
MM-19 Count 68 68 68 68 68 68.00 68 68 68 68
Min 2 0.01 2 50 0 0.03 3 0.03 0.40 66
Max 5669 18 5580 825 38 5.05 1191 30 46 2071
Mean 315 2 155 379 2 0.16 47 7 11 196
Std Dev 959 4 704 107 6 0.66 154 6 13 296
4
AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are
determined by ALS method ME -ICP61 which is a four acid digestion and ICP -AES
assay. Approximately 5% of the submitted samples are drill duplicates and copper-
gold-porphyry commercial standard reference material pulps. The sample rejects and
remaining pulps will be retrieved from ALS.
Qualified Person
The scientific and technical information contained in this news release has been
reviewed by E.L. "Buster" Hunsaker III, CPG 8137, a non -independent consulting
geologist who is a "Qualified Person" as such term is defined under National
Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").
About Bam Bam Resources Corp.
Bam Bam Resources Corp. (CSE: BBR / OTC: NPEZF / FSE: 4NPB) is engaged in the
identification, review and acquisition of latter stage copper and copper/ silver/gold
assets. This is in direct response to the growing worldwide demand and lack of supply
for precious metals fueled by the Green New Deal in the US and most other developed
nations with similar program s aimed at addressing climate change. Such programs
are heavily reliant on silver, gold and especially copper to produce Electric Vehicles
and other renewable power sources, as well as building infrastructure to provide clean
and affordable electricity.
The flagship project is the Majuba Hill copper , silver and gold District located 156
miles outside Reno, Nevada, USA. Management has been mandated to focus on safe,
mining friendly jurisdictions where government regulations are supportive of mining
operations.
Neither the Canadian Securities Exchange nor its Market Regulator (as that term is
defined in the policies of the Canadian Securities Exchange) accepts responsibility for
the adequacy or accuracy of this release.
On Behalf of the Board of Bam Bam Resources Corp.
“David Greenway”
David C. Greenway
President & CEO
For further information, please contact:
Joel Warawa
VP of Corporate Communications
P: 1 (855) 475-0745
5
Forward-Looking Statements
This news release contains certain statements that may be deemed "forward -looking" statements. Forward looking
statements are statements that are not historical facts and are generally, but not always, identified by the words
"expects", "plans", "anticipat es", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or
that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes
the expectations expressed in such forward -looking statements are based on reasonable assumptions, such
statements are not guarantees of future performance and actual results may differ materially from those in forward
looking statements. Forward looking statements are based on the beliefs, estimate s and opinions of Bam Bam
Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources
Corp. undertakes no obligation to update these forward -looking statements in the event that management's beliefs,
estimates or opinions, or other factors, should change.
###