Sunday, September 20, 2026
MiningNewsTerminal
Sunday, September 20, 2026 Admin

BFG.CN ·

Bam Bam Announces Historic Drill Data and Recent Core Sample Results Enhance Drill Targeting at Majuba-DeSoto Copper Oxide Target

Exploration Programs

1

*Press Release October 20, 2021

Bam Bam Announces Historic Drill Data and Recent Core Sample

Results Enhance Drill Targeting at

Majuba-DeSoto Copper Oxide Target

VANCOUVER, BC — October 20, 2021 — Bam Bam Resources Corp. (CSE: BBR / OTC:

NPEZF / FSE: 4NPB) (“Bam Bam” or the “Company”) has received results for 198.5

meters (651.1 ft) of core from seven historic holes which had not been sampled by

previous operators of the Majuba Hill Project in Pershing County Nevada. The samples

were analyzed using the 31 element ME-ICP61 multi-element and the gold Au-AA23

methods from ALS Minerals, that the Company has been using for all data during the

systematic exploration and drilling at Majuba Hill.

The results are very encouraging because the molybdenum, zinc, lead, and arsenic

zoning strongly correlates with the Magnetic and Induced Polarization (“IP”)

geophysical results. A prominent northwest -trending magnetic linear occurs very

close to the three best historic holes:

• MM-18: 105.7 ft (32.3 m) @ 0.62% Cu and 25.16 g/t Ag

2

from 72 to 177.7 ft (21.9-54.2 m)

• MM-19: 22.6 ft (6.8 m) @ 0.26% Cu and 7.74 g/t Ag

from 2.4 to 25 ft (0.8-7.6 m)

• DSM-02: 25.5 ft (7.8 m) @ 0.57% Cu and 28.09 g/t Ag

from 152.5 to 178 ft (46.5-54.3 m)

• DSM-06: 25 ft (7.6 m) @ 0.64% Cu and 34.66 g/t Ag

from 60 to 85 ft (18.3-25.9 m)

These historic core holes contained several near -surface copper oxide/enriched

intervals that with azurite, malachite, chalcocite, and chrysocolla.

MM-18: Azurite at 103 feet MM-19: Malachite in vein quartz

David Greenway, President and CEO, commented: “I am excited for us to have the

opportunity to test the DeSoto Oxide Zone. Our geology team has been able to

capitalize on the understanding from the drilling, geophysical surveys, geochemical

surveys, and geological mapping completed by Bam Bam. The significant amount of

historic data we have compiled and combined with the modern un derstanding of

Porphyry Copper deposits has proved very valuable for identifying Majuba as a major

District.”

Significant Results and Trace Elements

Ten elements were summarized from the historically reported data and the recent

core intervals results. All values are in ppm. The data have also been compiled using

grade x thickness (“GxT”) calculations for the completed hole for each element.

The GxT calculation show a distinct zoning of lead and zinc outward from the highest

copper grades. This zoning along with zoned clusters of tin (Sn) in the deeper portions

and traces of molybdenum (Mo) suggests a significant likelihood of intersecting the

favorable porphyry at depths of 30 meters (100 ft) to 300 meters (1000 ft).

The initial drill holes are planned to test these zones.

3

Quality Assurance/Quality Control ("QA/QC") Measures, Chain of Custody

The Company has implemented a QA/QC program using best industry practices at

the Majuba Hill Project. The samples are transported from the BBR secure warehouse

or directly from the drill to the ALS Sample Prep Facility in Reno or Elko, Nevada. ALS

then tra nsports the prepared pulps to their analytical lab in Reno, Nevada or

Vancouver, B.C. Soil and rock chip samples are transported by the company directly

to Elko or Reno, Nevada.

Drill core samples are sawn in half lengthwise and one half is placed in labeled cloth

sample bags. All samples are analyzed for copper, gold, silver, and 3 3 other

elements. Gold is determined by ALS method Au-AA23 which is a fire assay with an

Drill Hole Statistical Summary Data Cu Ag As Ba Bi Mo Pb Sb Sn Zn

DSM-01 Count 76 76 76 76 76 76.00 76 76 49 76

Min 5 0.3 3 152 1 0.50 4 3 5 64

Max 5944 36 370 610 18 70.00 784 59 40 1234

Mean 181 1 29 363 2 1.89 72 11 8 174

Std 770 4 56 116 2 8.96 141 11 8 192

DSM-02 Count 41 41 41 41 41 41.00 41 41 6 41

Min 1 0.3 3 204 1 0.50 3 3 20 71

Max 21300 102 520 645 149 3.00 109 8 30 503

Mean 1413 6 36 447 8 0.71 17 3 27 132

Std 3528 17 92 134 24 0.55 20 2 5 97

DSM-03 Count 9 9 9 9 9 9.00 9 9 9 9

Min 8 0.3 3 160 1 0.50 4 5 30 85

Max 725 1 27 630 4 0.50 53 27 70 247

Mean 369 1 14 420 2 0.50 21 13 42 136

Std 276 0 9 183 1 0.00 16 9 19 50

DSM-04 Count 10 10 10 10 10 10.00 10 10 4 10

Min 14 1 3 228 1 0.50 13 3 5 70

Max 3396 19 32 430 8 1.00 136 18 5 218

Mean 503 4 15 346 3 0.55 49 8 5 134

Std Dev 1037 6 8 80 3 0.16 39 7 0 54

DSM-05 Count 31 31 31 31 31 31.00 31 31 31 31

Min 15 0.3 6 200 1 0.50 3 3 5 59

Max 495 2 119 490 6 0.50 173 40 100 738

Mean 62 1 20 326 1 0.50 41 12 16 138

Std Dev 89 1 23 71 1 0.00 47 10 25 138

DSM-06 Count 20 20 19 20 20 20.00 20 20 3 20

Min 38 0.3 25 452 1 0.50 14 3 5 81

Max 14700 82 5916 818 201 1.00 348 61 40 2101

Mean 2051 11 914 600 23 0.53 96 7 25 503

Std Dev 4118 22 1508 94 52 0.11 112 13 18 505

DSM-07 Count 57 57 57 57 57 57.00 57 57 24 57

Min 1 0.3 3 74 1 0.50 1 3 30 54

Max 3617 13 816 1050 26 1.00 133 36 160 252

Mean 203 1 46 619 3 0.51 20 10 78 103

Std Dev 610 2 110 206 5 0.07 29 9 43 37

MM-18 Count 98 98 98 98 98 98.00 98 98 98 98

Min 0.10 0.01 0.10 10.00 0.01 0.03 4.00 0.03 0.10 64

Max 35600 129 4515 670 85 0.50 286 36 75 838

Mean 1573 7 342 308 4 0.05 61 9 15 243

Std Dev 4721 20 887 200 12 0.06 70 8 18 190

MM-19 Count 68 68 68 68 68 68.00 68 68 68 68

Min 2 0.01 2 50 0 0.03 3 0.03 0.40 66

Max 5669 18 5580 825 38 5.05 1191 30 46 2071

Mean 315 2 155 379 2 0.16 47 7 11 196

Std Dev 959 4 704 107 6 0.66 154 6 13 296

4

AAS finish on a 30 gram split. Copper, silver and the remaining 31 elements are

determined by ALS method ME -ICP61 which is a four acid digestion and ICP -AES

assay. Approximately 5% of the submitted samples are drill duplicates and copper-

gold-porphyry commercial standard reference material pulps. The sample rejects and

remaining pulps will be retrieved from ALS.

Qualified Person

The scientific and technical information contained in this news release has been

reviewed by E.L. "Buster" Hunsaker III, CPG 8137, a non -independent consulting

geologist who is a "Qualified Person" as such term is defined under National

Instrument 43-101 - Standards of Disclosure for Mineral Projects ("NI 43- 101").

About Bam Bam Resources Corp.

Bam Bam Resources Corp. (CSE: BBR / OTC: NPEZF / FSE: 4NPB) is engaged in the

identification, review and acquisition of latter stage copper and copper/ silver/gold

assets. This is in direct response to the growing worldwide demand and lack of supply

for precious metals fueled by the Green New Deal in the US and most other developed

nations with similar program s aimed at addressing climate change. Such programs

are heavily reliant on silver, gold and especially copper to produce Electric Vehicles

and other renewable power sources, as well as building infrastructure to provide clean

and affordable electricity.

The flagship project is the Majuba Hill copper , silver and gold District located 156

miles outside Reno, Nevada, USA. Management has been mandated to focus on safe,

mining friendly jurisdictions where government regulations are supportive of mining

operations.

Neither the Canadian Securities Exchange nor its Market Regulator (as that term is

defined in the policies of the Canadian Securities Exchange) accepts responsibility for

the adequacy or accuracy of this release.

On Behalf of the Board of Bam Bam Resources Corp.

“David Greenway”

David C. Greenway

President & CEO

For further information, please contact:

Joel Warawa

VP of Corporate Communications

E: [email protected]

P: 1 (855) 475-0745

5

Forward-Looking Statements

This news release contains certain statements that may be deemed "forward -looking" statements. Forward looking

statements are statements that are not historical facts and are generally, but not always, identified by the words

"expects", "plans", "anticipat es", "believes", "intends", "estimates", "projects", "potential" and similar expressions, or

that events or conditions "will", "would", "may", "could" or "should" occur. Although Bam Bam Resources Corp. believes

the expectations expressed in such forward -looking statements are based on reasonable assumptions, such

statements are not guarantees of future performance and actual results may differ materially from those in forward

looking statements. Forward looking statements are based on the beliefs, estimate s and opinions of Bam Bam

Resources Corp. management on the date the statements are made. Except as required by law, Bam Bam Resources

Corp. undertakes no obligation to update these forward -looking statements in the event that management's beliefs,

estimates or opinions, or other factors, should change.

###