Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BEEP.V ·

Baselode Reports Shallow Uranium Results from Summer 2024 Drill Program Six drill holes expand shallow uranium mineralization footprint in Pod 1 (i.e., within 50 metres from surface), eleven drill holes confirmed uranium starting within 100 metres

Drill Results

Baselode Reports Shallow Uranium Results

from Summer 2024 Drill Program

Six drill holes expand shallow uranium mineralization footprint in Pod 1 (i.e., within 50

metres from surface), eleven drill holes confirmed uranium starting within 100 metres

from surface in three Pods

Shallow uranium mineralization updip of Pod 7 remains largely untested and requires

further follow-up drilling

Toronto, Ontario--(Newsfile Corp. - May 20, 2025) - Baselode Energy Corp. (TSXV: FIND) (OTCQB:

BSENF) ("

Baselode

" or the "

Company

") is pleased to release uranium ("

U

3

O

8

") assay results from all

28 drill holes of the 2024 drill program on the ACKIO prospect area ("

ACKIO

") in the Athabasca Basin

(

"Basin"

) area of northern Saskatchewan (

Figure 1

).

"We're especially encouraged with 6 drill holes intersecting uranium within 50 m from surface and 11 drill

holes within 100 m from surface. These shallow mineralization results continue to demonstrate ACKIO's

unique advantage in the Basin area with easily accessible, near-surface uranium. Last year's summer

drill program successfully defined more shallow uranium mineralization to the north and south of our

shallowest uranium zone, Pod 1. Uranium at the overburden-bedrock contact still remains open to the

south and north.

"Drilling at Pods 6 and 7 intersected higher average uranium grades over greater widths than previously

intersected, suggesting there's a zoned lower-grade to higher-grade uranium concentrations within those

Pods. In addition, Pod 7 still requires a detailed investigation of uranium potential at the overburden-

bedrock contact, which has not been tested to the same degree as Pod 1. We believe some of the

higher-grade zones within Pod 7 extend up to the overburden-bedrock contact and have yet to be drill

tested," commented James Sykes, CEO, President, and Director of Baselode.

Pod 1 Summary

(

Figure 2

, Table 1)

Six drill holes (AK24-134 to AK24-137, and AK24-143 & AK24-144) intersected uranium mineralization

within 50 m from surface. AK24-137 intersected 0.38% U

3

O

8

over 9.15 m at 37.35 m drill hole depth

(3.5 grade*thickness, "

GT

"), confirming Pod 1's uranium footprint at the overburden-bedrock contact to

the south. Drill holes AK24-143 and AK24-144 successfully confirmed shallow uranium at Pod 1 to the

north with 0.12% U

3

O

8

over 11.8 m at 65.2 m drill hole depth (1.4 GT) and 0.12% U

3

O

8

over 9.0 m at

51.5 m drill hole depth (1.1 GT), respectively.

Pod 6 Summary

As previously reported (

October 3, 2024

), drill hole AK24-118 intersected 8.5 metres of 0.59% U

3

O

8

(5.0 GT),

and AK24-119 returned 21.0 metres of 0.28% U

3

O

8

(5.8 GT), ranking as the two best

intersections in Pod 6, ranking amongst the top 20 drill holes at ACKIO, and enhancing our

understanding of uranium mineralization controls at ACKIO.

Pod 7 Summary

Drill holes AK24-135B and AK24-138 intersected the second and third best individual uranium

intersections in Pod 7 with 0.18% U

3

O

8

over 28.0 m at 98.0 m depth (5.0 GT), and 0.19% U

3

O

8

over

23.0 m at 81.5 m depth (4.3 GT), respectively.

In addition, two other drill holes (AK24-137 and AK24-139) rank amongst the top 10 drill intersections in

Pod 7 with 2.5 GT each, and drill holes AK24-135B, AK24-137 and AK24-138 rank amongst the top 20

drill holes at ACKIO due to their combined intersections of Pod 1 and Pod 7.

Drill holes AK24-134 to AK24-139 have increased our confidence and understanding of uranium

mineralization controls at Pod 7, as the system seems to be comprised of a higher-grade core with a

lower-grade uranium envelope.

Pod 8 & Pod 9 Summaries

Drill hole AK24-133 intersected the second best results in Pod 8 with 0.09% U

3

O

8

over 11.5 m at 130.5

m depth (1.0 GT).

The results from Pod 8 and Pod 9 exploration drill holes have required the company to re-consider the

overall structural architecture of these specific parts of ACKIO as the uranium mineralization system was

not as predictable as it is in other Pods.

Exploration results

Drill holes AK24-120 to AK24-127 and AK24-129 to AK24-130 were designed to test for depth

extension, strike extensions, and unconformity-style of uranium mineralization. Although none of the drill

holes intersected any new zones of uranium mineralization, they all share geochemical anomalous lead

(Pb) isotope ratios, boron (B), and uranium (U), including a predominant Mg-chlorite-rich clay type.

NOTES:

All reported lengths and depths, aside from "metres from surface" are drill hole measurements and do not represent true thicknesses, which have

yet to be determined.

About Baselode Energy Corp.

Baselode controls 100% of approximately 241,409 hectares for exploration in the Athabasca Basin area

of northern Saskatchewan, Canada. The land package is free of any option agreements or underlying

royalties.

The Company discovered the ACKIO near-surface, uranium prospect in September 2021. ACKIO

measures greater than 375 m along strike, greater than 150 m wide, comprised of at least 9 separate

uranium Pods, with mineralization starting as shallow as 28 m and 32 m beneath the surface in Pods 1

and 7, respectively, and down to approximately 300 m depth beneath the surface with the bulk of

mineralization occurring in the upper 120 m. ACKIO remains open at depth, and to the north, south and

east.

Baselode's Athabasca 2.0 exploration thesis focuses on discovering near-surface, basement-hosted,

high-grade uranium orebodies outside the Athabasca Basin. The exploration thesis is further

complemented by the Company's preferred use of innovative and well-understood geophysical methods

to map deep structural controls to identify shallow targets for diamond drilling.

QP Statement

The technical information contained in this news release has been reviewed and approved by Cameron

MacKay, P.Geo., Vice-President, Exploration & Development for Baselode Energy Corp., who is

considered to be a

Qualified Person as defined in "National Instrument 43-101, Standards of Disclosure

for Mineral Projects."

For further information, please contact:

James Sykes, CEO, President and Director

Baselode Energy Corp.

[email protected]

www.baselode.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the TSX

Venture Exchange policies) accepts responsibility for the adequacy or accuracy of this release.

Certain information in this press release may contain forward-looking statements. This information is

based on current expectations that are subject to significant risks and uncertainties that are difficult to

predict. Actual results might differ materially from results suggested in any forward-looking statements.

Baselode Energy Corp. assumes no obligation to update the forward-looking statements, or to update

the reasons why actual results could differ from those reflected in the forward looking-statements unless

and until required by securities laws applicable to Baselode Energy Corp. Additional information

identifying risks and uncertainties is contained in the Company's filings with Canadian securities

regulators, which filings are available under Baselode Energy Corp. profile at

www.sedarplus.ca

.

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the

securities in the United States. The securities have not been and will not be registered under the United

States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities laws and

may not be offered or sold within the United States or to, or for the account or benefit of, U.S. Persons

unless registered under the U.S. Securities Act and applicable state securities laws, unless an

exemption from such registration is available.

Figure 1 - Baselode projects location map. ACKIO uranium prospect identified with red triangle

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6412/252714_4cd47696b427393e_005full.jpg

Figure 2 - ACKIO area diamond drill hole collar locations and drill traces

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6412/252714_4cd47696b427393e_006full.jpg

TABLE 1 - Uranium assay results for drill holes AK24-117 to AK24-144 at the ACKIO discovery

DDH

Target

East

North

Elevation

Az.

Dip

EOH

Radioactivity

(>300

counts-per-

second, cps)

Assay

Results

(>0.05 wt%

U

3

O

8

)

AK24-117*

Pod 8

526142

6372902

465

90

-75

227

368 cps over

0.45 m at

74.4 m

0.09% over

0.45

m at

74.4 m

Pod 8

301 cps over

1.8 m at

108.3 m

No significant

results

Pod 8

409 cps over

6.25 m at

117.25 m

0.07% over

0.5 m at

118.0 m

0.06% over

1.0 m at

121.5 m

Pod 6

426 cps over

12.55 m at

128.1 m

0.07% over

7.5 m at

128.5 m

0.05% over

1.5 m at

139.0 m

Pod 6

327 cps over

6.4 m at

145.2 m

0.11% over

1.0 m at

145.5 m

Pod 6

399 cps over

0.65 m at

160.95 m

0.08% over

0.5 m at

161.0 m

AK24-118*

Pod 8

526142

6372902

465

118

-71

257

456 cps over

0.8 m at 89.3

m

0.15% over

0.9 m at 89.2

m

Pod 8

350 cps over

0.5 m at 92.7

m

0.09% over

0.3 m at 92.7

m

Pod 8

392 cps over

2.6 m at

119.1 m

0.09% over

1.1 m at

119.4 m

Pod 8

315 cps over

3.1 m at

131.8 m

No significant

results

Pod 6

1,115 cps

over 13.3 m

at 149.3 m

0.06% over

0.5 m at

149.5 m

0.59% over

8.5 m at

153.0 m

Pod 6

includes

0.72% over

6.0 m at

154.0 m

AK24-119*

Pod 6

526133

6372907

463

65

-75

230

300 cps over

8.5 m at

109.5 m

0.07% over

0.5 m at

104.5 m

Pod 6

907 cps over

34.05 m at

131.1 m

0.28% over

21.0 m at

141.0 m

Pod 6

includes

9,173 cps

over 0.4 m at

144.6 m

1.36% over

2.0 m at

143.0 m

Pod 6

and includes

0.51% over

0.5 m at

152.0 m

AK24-120

Exploration -

Depth

526210

6373081

464

270

-70

512

No significant results

AK24-121

Exploration -

Depth

526317

6372980

465

270

-70

452

No significant results

AK24-122

Exploration -

Depth

526360

6372880

467

270

-70

446

No significant results

AK24-123

Exploration -

SE Strike

526450

6372680

467

270

-65

369

No significant results

AK24-124

Exploration -

UC

526335

6372730

466

90

-90

200

No significant results

AK24-125

Exploration -

UC

526335

6372730

466

90

-60

332

495 cps over

0.3 m at

132.75 m

0.05% over

0.55 m at

132.5 m

AK24-126

Exploration -

UC

526342

6372830

467

90

-70

269

No significant results

AK24-127

Exploration -

UC

526362

6372928

467

90

-80

215

330 cps over

0.15 m at

53.4 m

No significant

results

Exploration -

UC

330 cps over

0.1 m at 55.9

m

No significant

results

Exploration -

UC

320 cps over

0.25 m at

115.75 m

No significant

results

AK24-128

Pod 1 NW

526062

6373080

466

270

-60

200

302 cps over

1.85 m at

47.7 m

No significant

results

Pod 1 NW

370 cps over

0.1 m at 50.0

m

No significant

results

Pod 1 NW

300 cps over

0.6 m at

50.65 m

No significant

results

Pod 1 NW

310 cps over

0.15 m at

58.6 m

No significant

results

Pod 1 NW

460 cps over

0.1 m at 59.1

m

0.05% over

0.5 m at 59.0

m

Pod 1 NW

300 cps over

0.2 m at 62.9

m

No significant

results

Pod 7 NW

418 cps over

0.9 m at

109.05 m

0.07% over

0.5 m at

109.0 m

AK24-129

Exploration -

UC

526231

6372800

467

270

-90

188

324 cps over

0.65 m at

80.65 m

No significant

results

AK24-130

Exploration -

SE Strike

526453

6372383

468

250

-60

281

No significant results

AK24-131

Pod 8

526135

6372836

465

76

-65

242

No significant results

AK24-132

Pod 8

526135

6372836

464

76

-59

218

No significant

results

0.05% over

0.1 m at

156.5 m

AK24-133

Pod 8

526124

6372879

465

90

-60

224

397 cps over

1.10 m at

112.4 m

0.08% over

1.0 m at

112.5 m

Pod 8

341 cps over

0.55 m at

116.7 m

0.06% over

2.0 m at

116.5 m

Pod 8

350 cps over

0.8 m at

120.3 m

No significant

results

Pod 8

396 cps over

11.65 m at

128.95 m

0.09% over

11.5 m at

130.5 m

Pod 6

444 cps over

1.2 m at

155.5 m

0.07% over

1.0 m at

155.5 m

AK24-134

Pod 1

526091

6372933

463

267

-50

191

386 cps over

6.05 m at

53.2 m

0.10% over

1.5 m at 53.5

m

0.16% over

1.0 m at 56.5

m

Between Pod

1 & Pod 7

400 cps over

0.5 m at 74.0

m

0.12% over

1.25 m at

74.0 m

Pod 7

1,035 cps

over 11.0 m

at 101.3 m

0.17% over

9.0 m at

103.0 m

Pod 7

includes

6,621 cps

over 0.7 m at

103.9 m

1.07% over

0.5 m at

104.0 m

Pod 7

400 cps over

0.05 m at

129.2 m

0.06% over

0.05 m at

129.2 m

Pod 7

500 cps over

4.75 m at

131.9 m

0.10% over

3.0 m at

132.0 m

Pod 7

6,344 cps

over 0.3 m at

138.9 m

0.43% over

1.0 m at

138.5 m

Pod 7

includes

0.65% over

0.5 m at

139.0 m

AK24-135B

Pod 1

526091

6372932

463

267

-50

185

410 cps over

0.6 m at 41.6

m

0.09% over

0.7 m at 41.5

m

Pod 1

478 cps over

0.4 m at 44.0

m

417 cps

over 1.55 m

at 47.0 m

0.05% over

6.5 m at 44.0

m

1

Between Pod

1 & Pod 7

442 cps over

0.6 m at 53.3

m

0.06% over

1.0 m at 53.0

m

Between Pod

1 & Pod 7

465 cps over

0.2 m at 55.9

m

0.06% over

0.5 m at 56.0

m

Pod 7

438 cps over

1.25 m at

89.45 m

0.10% over

1.65 m at

89.35 m

Pod 7

983 cps over

28.65 m at

98.2 m

0.18% over

28.0 m at

98.0 m

Pod 7

includes

0.55% over

0.5 m at 99.5

m

and includes

5,920 cps

over 0.15 m

at 123.1 m

0.57% over

0.5 m at

123.0 m

Pod 7

623 cps over

0.6 m at

156.3 m

No significant

results

AK24-136

Pod 1

526091

6372932

463

245

-55

208.5

380 cps over

0.2 m at 50.4

m

0.05% over

0.4 m at 50.2

m

Pod 1

414 cps over

0.75 m at

56.7 m

0.10% over

1.0 m at 56.5

m

Between Pod

1 & Pod 7

366 cps over

4.6 m at 74.0

m

0.11% over

3.5 m at 74.0

m

2

Pod 7

328 cps over

6.3 m at

103.8 m

0.06% over

0.5 m at

103.5 m

0.05% over

0.5 m at

105.5 m

0.06% over

0.5 m at

109.0 m

Pod 7

800 cps over

5.15 m at

113.5 m

0.12% over

4.5 m at

114.5 m

Pod 7

includes

10,455 cps

over 0.2 m at

118.45 m

0.59% over

0.55 m at

118.45 m

Pod 7

320 cps over

0.05 m at

125.9 m

No significant

results

Pod 7

471 cps over

0.45 m at

129.4 m

0.07% over

0.5 m at

129.5 m

Pod 7

No significant

results

0.05% over

0.5 m at

135.0 m

AK24-137

Pod 1

526091

6372932

463

241

-69

191

1,236 cps

over 8.95 m

at 37.35 m

0.38% over

9.15 m at

37.35 m

3

Pod 1

includes

5,827 cps

over 0.2 m at

39.35 m

0.68% over

4.25 m at

39.0 m

Pod 1

325 cps over

3.4 m at 50.5

m

0.12% over

0.5 m at 50.5

m

0.07% over

0.5 m at 53.0

m

Pod 1

330 cps over

0.15 m at

58.85 m

No significant

results

Between Pod

1 & Pod 7

302 cps over

4.4 m at

96.55 m

0.05% over

0.5 m at 96.5

m

Between Pod

1 & Pod 7

365 cps over

3.4 m at

105.25 m

0.06% over

0.5 m at

107.5 m

Pod 7

380 cps over

0.1 m at

120.35 m

No significant

results

Pod 7

684 cps over

0.3 m at

124.7 m

0.06% over

0.5 m at

124.5 m

Pod 7

1,272 cps

over 13.3 m

at 127.5 m

0.28% over

9.0 m at

129.0 m

Pod 7

includes

5,000 cps

over 0.2 m at

130.1 m

0.51% over

0.5 m at

130.0 m

Pod 7

and includes

7,000 cps

over 0.05 m

at 132.1 m

0.55% over

2.0 m at

132.5 m

Pod 7

and includes

5,600 cps

over 0.85 m

at 132.7 m

Pod 7

and includes

10,600 cps

over 0.1 m at

134.55 m

Pod 7

1,122 cps

over 4.85 m

at 142.9 m

0.16% over

4.0 m at

142.5 m

Pod 7

includes

5,600 cps

over 0.25 m

at 143.15 m

Pod 7

and includes

6,500 cps

over 0.1 m at

146.15 m

Pod 7

1,063 cps

over 1.45 m

at 150.65 m

No significant

results

Pod 7

includes

10,000 cps

over 0.1 m at

150.65 m

0.40% over

0.5 m at

150.5 m

AK24-138

Pod 7

526060

6372968

462

251

-60

152

388 cps over

11.2 m at

64.85 m

0.09% over

10.5 m at

64.5 m

4

Pod 7

905 cps over

26.5 m at

79.55 m

0.19% over

23.0 m at

81.5 m

Pod 7

includes

7,000 cps

over 0.1 m at

89.05 m

0.58% over

0.5 m at 89.0

m

Pod 7

and includes

6,300 cps

over 0.1 m at

96.4 m

Pod 7

and includes

5,500 cps

over 0.1 m at

97.55 m

0.65% over

0.5 m at 97.5

m

Pod 7

and includes

5,290 cps

over 0.6 m at

101.5 m

1.00% over

1.0 m at

101.0 m

Pod 7

454 cps over

0.75 m at

108.35 m

No significant

results

Pod 7

738 cps over

0.8 m at

111.95 m

0.23% over

0.5 m at

112.0 m

AK24-139

Pod 7

526060

6372968

462

281

-45

179

No significant

results

0.37% over

0.25 m at

41.25 m

369 cps over

0.85 m at

62.15 m

0.11% over

0.5 m at 62.0

m