Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BEEP.V ·

Baselode Reports Near-Surface High-Grade Intersection of 1.11% U3O8 over 7.4 Metres High-grade intersection of 1.11% U 3 O 8 over 7.4 m within 0.41% U 3 O 8 over 34.85 m at 43.5 m true vertical depth in AK23-95 3 of 5 drill holes with mineralization starting within 50 metres of surface and with grea

Drill Results

Baselode Reports Near-Surface High-Grade

Intersection of 1.11% U3O8 over 7.4 Metres

High-grade intersection of 1.11% U

3

O

8

over 7.4 m within 0.41% U

3

O

8

over 34.85 m at 43.5

m true vertical depth in AK23-95

3 of 5 drill holes with mineralization starting within 50 metres of surface and with greater

than 30 metres of mineralization

Assays pending from 15 remaining drill holes, including those with the highest

radioactivity results

Toronto, Ontario--(Newsfile Corp. - November 8, 2023) - Baselode Energy Corp. (TSXV: FIND)

(OTCQB: BSENF) ("

Baselode

" or the "

Company

") is pleased to announce new uranium ("

U

3

O

8

")

assays from 5 drill holes from the 7,512 metre diamond drilling program (the "

Program

") completed

within the ACKIO uranium prospect ("

ACKIO

") on the Hook project ("

Hook

" or the "

Project

"). Assays

from the remaining 15 drill holes cover shallow mineralization expanding Pod 7, and exploration drill

holes outside the known ACKIO footprint.

"ACKIO continues to impress us with near-surface, high-grade uranium mineralization in Pod 1, and with

growth potential in Pod 7 starting to be realized. Drill holes AK23-095, AK23-096, and AK23-098

intersected mineralization starting within 50 m of surface, and had greater than 30 m of composite

mineralization. This demonstrates the potential of ACKIO as it hosts shallow, high-grade uranium and is

endowed with multiple thick sequences of mineralization. In addition, Pod 7 has grown in thickness,

depth, and strike length with four drill holes, remaining open at depth and along strike. We anticipate

more encouraging results from Pod 7 as the highest levels of radioactivity encountered in the Program

were drilled 50 m along strike of holes AK23-98 and AK23-99," said James Sykes, CEO, President and

Director of Baselode.

ACKIO Drill Program Details

36 drill holes for 7,512 metres ("

m

") were completed during the Program. ACKIO consisted of 30 drill

holes for 6,193 m, Mirror consisted of 5 drill holes for 1,145 m, and 1 drill hole for 174 m was completed

on a regional exploration target.

Drill holes AK23-95, AK23-96, AK23-98 and AK23-99 were drilled within the centre of Pod 1, with the

former two drill holes also targeting moderate to deeper portions of Pod 7 to the west, and the latter two

drill holes testing the edge of modeled mineralization in Pod 7.

Extensive shallow mineralization starting within 50 m of surface was confirmed in three drill holes in Pod

1, including 0.41% U

3

O

8

over 34.85 m at 46.65 m (43.5 m true vertical depth) from AK23-95 and 0.36%

U

3

O

8

over 20.0 m at 54.0 m (49.7 m true vertical depth) from AK23-96.

Drill holes AK23-95 and AK23-98 confirmed extensive mineralization within the main body of Pod 7,

including 0.11% U

3

O

8

over 24.5 m at 134.5 m (125.3 m true vertical depth) from AK23-95 and 0.18%

U

3

O

8

over 13.0 m at 132.0 m (101.1 m true vertical depth) from AK23-98. These results expanded the

modelled width of Pod 7 (Figure 2).

Drill holes AK23-96 and AK23-99 intersected significant uranium mineralization below Pod 7, expanding

the modelled depth of Pod 7 (Figure 2). Pod 7 remains open at depth.

Drill hole AK23-97 tested the gap between Pods 1 and 2 to determine if the two Pods are connected.

The drill hole intersected a few minor structures with uranium concentrations below reporting limits but

not enough uranium to sufficiently determine Pods 1 and 2 as the same Pod (Figure 2).

Geochemical U

3

O

8

assay results from drill holes AK23-95 to AK23-99 were provided by Saskatchewan

Research Council's Geoanalytical Laboratory ("

SRC

") in Saskatoon, Saskatchewan. The assay

methodology includes SRCs "U

3

O

8

Wt% Assay" analysis package where an aliquot of sample pulp is

digested in a concentration of HCL:HNO

3

. The digested volume is then made up with deionized water

for analysis by ICP-OES. Uranium assay results from the remaining fifteen drill holes will be released

after being compiled, thoroughly quality checked, and interpreted by the technical team.

ACKIO is 30 km southeast of well-established infrastructure, including an all-season road and powerline

between Cameco Corp.'s (TSX: CCO) and Orano's McArthur River mine and Key Lake uranium mill joint

ventures. ACKIO is 70 km northeast of the Key Lake mill. The Program was helicopter-supported to

lessen any ground-induced environmental impacts within the project area.

NOTES:

1

.

All reported drill hole lengths do not represent true thicknesses which have yet to be determined.

2

.

* "

High-grade uranium mineralization

" is defined by the Company as any result with >1.00% U

3

O

8

.

About Baselode Energy Corp.

Baselode controls 100% of approximately 264,172 hectares for exploration in the Athabasca Basin

area, northern Saskatchewan, Canada. The land package is free of any option agreements or underlying

royalties.

The Company discovered the ACKIO near-surface, uranium prospect in September 2021. ACKIO

measures greater than 375 m along strike, greater than 150 m wide, comprised of at least 9 separate

uranium Pods, with mineralization starting as shallow as 28 m and 32 m beneath the surface in Pods 1

and 7, respectively, and down to approximately 300 m depth beneath the surface with the bulk of

mineralization occurring in the upper 120 m. ACKIO remains open at depth, and to the north, south and

east.

Baselode's Athabasca 2.0 exploration thesis focuses on discovering near-surface, basement-hosted,

high-grade uranium orebodies outside the Athabasca Basin. The exploration thesis is further

complemented by the Company's preferred use of innovative and well-understood geophysical methods

to map deep structural controls to identify shallow targets for diamond drilling.

QP Statement

The technical information contained in this news release has been reviewed and approved by Cameron

MacKay, P.Geo., Vice-President, Exploration & Development for Baselode Energy Corp., who is

considered to be a

Qualified Person as defined in "National Instrument 43-101, Standards of Disclosure

for Mineral Projects."

For further information, please contact:

Baselode Energy Corp.

FIND on the TSXV

[email protected]

www.baselode.com

James Sykes, CEO, President and Director

[email protected]

306-221-8717

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the TSX

Venture Exchange policies) accepts responsibility for the adequacy or accuracy of this release.

Certain information in this press release may contain forward-looking statements. This information is

based on current expectations that are subject to significant risks and uncertainties that are difficult to

predict. Actual results might differ materially from results suggested in any forward-looking statements.

Baselode Energy Corp. assumes no obligation to update the forward-looking statements, or to update

the reasons why actual results could differ from those reflected in the forward looking-statements unless

and until required by securities laws applicable to Baselode Energy Corp. Additional information

identifying risks and uncertainties is contained in the Company's filings with Canadian securities

regulators, which filings are available under Baselode Energy Corp. profile at

www.sedarplus.ca

.

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the

securities in the United States. The securities have not been and will not be registered under the United

States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities laws and

may not be offered or sold within the United States or to, or for the account or benefit of, U.S. Persons

unless registered under the U.S. Securities Act and applicable state securities laws, unless an

exemption from such registration is available.

FIGURE 1 - Surface projections of modeled ACKIO uranium mineralization, drill hole collar

locations and traces for AK23-95 to AK23-99

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6412/186613_91a741f674b7f9a2_005full.jpg

FIGURE 2 – Cross Section with Drill Holes AK23-95 to AK23-97

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6412/186613_91a741f674b7f9a2_006full.jpg

TABLE 1 – Drill collar details, continuous composite elevated radioactivity results, and

uranium assay results (U

3

O

8

) from drill holes

AK23-95 to AK23-99

DDH

Target

Area

Location

East

North

Elevation

Az.

Dip

EOH

Radioactivity (>300 cps)

Assay Results (>0.05 wt%

U

3

O

8

)

AK23-95

ACKIO

Pod 1 -

Centre

526119

6372952

464

271

-51

180

1,019 cps over 35.75 m at

46.75 m

0.41% over 34.85 m at 46.65

m

1

includes

6,300 cps over 0.15 m at

59.2 m

1.24% over 1.0 m at 59.0 m

and

includes

N/A

0.61% over 0.5 m at 64.0 m

and

includes

5,500 cps over 0.15 m at

71.7 m &

5,290 cps over 0.6 m at

72.15 m &

6,100 cps over 0.2 m at

73.15 m

1.11% over 7.4 m at 70.6 m

310 cps over 0.25 m at 90.0

m

Results below cutoff grade

315 cps over 0.15 m at 117.2

m

Results below cutoff grade

375 cps over 0.1 m at 123.3

m

Results below cutoff grade

300 cps over 0.1 m at 126.7

m

Results below cutoff grade

450 cps over 0.1 m at 127.05

m

Results below cutoff grade

350 cps over 0.1 m at 127.4

m

Results below cutoff grade

300 cps over 0.1 m at 127.85

m

Results below cutoff grade

315 cps over 0.1 m at 128.2

m

Results below cutoff grade

350 cps over 0.1 m at 129.65

m

Results below cutoff grade

Pod 7 -

Centre

467 cps over 28.45 m at

131.3 m

0.11% over 24.5 m at 134.5

m

includes

6,250 cps over 0.10 m at

139.05 m

0.51% over 0.5 m at 139.0 m

378 cps over 1.05 m at

163.85 m

0.09% over 0.5 m at 164.0 m

AK23-96

ACKIO

Pod 1 -

Centre

526119

6372952

464

273

-67

210

788 cps over 24.55 m at

54.0 m

0.36% over 20.0 m at 54.0 m

& 0.08% over 0.5 m at 77.5

m

includes

N/A

0.68% over 1.15 m at 55.0 m

and

includes

5,500 cps over 0.05 m at

62.35 m

0.70% over 4.0 m at 58.5 m

and

includes

N/A

0.64% over 0.5 m at 65.5 m

and

includes

N/A

0.66% over 0.5 m at 70.5 m

500 cps over 0.15 m at 84.5

m

0.07% over 0.35 m at 84.5 m

316 cps over 0.5 m at 87.0 m

Results below cutoff grade

300 cps over 0.1 m at 88.0 m

Results below cutoff grade

300 cps over 0.4 m at 91.1 m

& 1,031 cps over 3.0 m at

93.35 m

0.34% over 5.25 m at 91.0

m

2

includes

N/A

0.80% over 2.1 m at 93.5 m

3

Pod 7 -

Centre

485 cps over 6.85 m at 153.1

m

0.11% over 2.0 m at 154.5 m

& 0.09% over 1.0 m at 159.0

m

441 cps over 2.75 m at 162.0

m

0.09% over 0.5 m at 162.0 m

& 0.13% over 0.5 m at 164.0

m

2,680 cps over 0.6 m at

167.75 m

0.83% over 0.5 m at 167.5 m

includes

7,822 cps over 0.2 m at

167.8 m

1,008 cps over 2.5 m at 170.6

m

0.28% over 3.0 m at 170.5 m

includes

7,850 cps over 0.05 m at

173.0 m

0.56% over 0.5 m at 172.5 m

886 cps over 2.4 m at 179.6

m

0.24% over 2.5 m at 179.5 m

includes

7,500 cps over 0.05 m at

179.7 m & 9,000 cps over

0.1 m at 179.85 m

0.83% over 0.5 m at 179.5 m

386 cps over 0.8 m at 184.65

m

0.12% over 1.0 m at 184.5 m

AK23-97

ACKIO

Pods 1 and

2 - Edge

526119

6372952

464

272

-80

141

310 cps over 0.25 m at 101.5

m

Results below cutoff grade

315 cps over 0.2 m at 102.4

m

Results below cutoff grade

300 cps over 0.3 m at 109.5

m

Results below cutoff grade

350 cps over 0.25 m at

111.25 m

0.11% over 0.25 m at 111.25

m

AK23-98

ACKIO

Pod 1 -

Centre

526100

6373006

465

270

-50

164

500 cps over 0.25 m at 46.2

m

0.12% over 0.5 m at 46.0 m

491 cps over 0.55 m at 51.5

m

0.10% over 1.0 m at 51.0 m

511 cps over 10.7 m at 55.3

m

0.10% over 10.7 m at 55.3 m

426 cps over 0.75 m at 83.25

m

0.17% over 1.0 m at 83.0 m

No significant results

0.05% over 0.1 m at 90.65 m

350 cps over 0.15 m at 97.05

m

0.05% over 0.2 m at 97.0 m

330 cps over 0.15 m at

104.55 m

Results below cutoff grade

370 cps over 0.15 m at 114.4

m

0.08% over 1.6 m at 113.5 m

502 cps over 0.5 m at 118.6

m

0.09% over 1.0 m at 118.5 m

Pod 7 -

Edge

355 cps over 1.4 m at 125.6

m

0.06% over 1.0 m at 125.5 m

453 cps over 13.05 m at

131.75 m

0.18% over 13.0 m at 132.0

m

includes

N/A

0.57% over 2.5 m at 140.5 m

AK23-99

ACKIO

Pod 1 -

Centre

526100

6373006

465

271

-68

201

643 cps over 14.9 m at

71.05 m

0.27% over 16.0 m at 71.0 m

includes

N/A

0.60% over 1.5 m at 71.5 m

and

includes

N/A

0.70% over 0.5 m at 79.0 m

and

includes

6,500 cps over 0.1 m at 81.9

m

0.79% over 1.5 m at 81.5 m

N/A

0.08% over 0.1 m at 94.4 m

350 cps over 0.1 m at 120.65

m

0.06% over 1.5 m at 120.0 m

501 cps over 0.2 m at 126.5

m

0.11% over 1.0 m at 126.5 m

350 cps over 0.25 m at

156.45 m

0.06% over 0.5 m at 156.5 m

Pod 7 -

Edge

530 cps over 3.05 m at

160.65 m

0.15% over 3.5 m at 160.5 m

350 cps over 0.2 m at 174.05

m

Results below cutoff grade

5 DDH

896

5 DDH

5 DDH

NOTES: East and North units are metres using NAD83 datum, UTM Zone 13N

Elevation is recorded as "metres above sea level"

Az. = Azimuth, EOH = End of hole (measured in metres)

Composite radioactivity results use 300 cps cut-off and do not contain greater than 2.0 m consecutive dilution

Composite U3O8 results use 0.05% U3O8 cut-off and do not contain greater than 2.0 m consecutive dilution (i.e., dilution is <0.05%

U3O8)

"includes/and includes" are composite U3O8 results using 0.50% U3O8 cut-off and do not contain greater than 2.0 m consecutive

dilution (i.e., dilution is <0.50% U3O8)

1 - includes 3.5 m lost core over interval length

2 - includes 1.9 m lost core over interval length

3 - includes 0.4 m lost core over interval length

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/186613