Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BEEP.V ·

Baselode Reports Four New Drill holes intersecting over 30 metres of uranium AK22-040: 0.19% U 3 O 8 over 22.5 m starting at 81.4 m true vertical depth AK22-066: 37.5 m of composite mineralization includes 0.14% U 3 O 8

Drill Results

Baselode Reports Four New Drill holes intersecting over 30 metres of

uranium

AK22-040: 0.19% U

3

O

8

over

22.5 m

starting at

81.4 m

true vertical depth

AK22-066:

37.5 m

of composite mineralization includes

0.14% U

3

O

8

over

24.0 m

starting at

107.1 m

true vertical depth

AK22-018:

34.8 m

of composite mineralization includes

0.43% U

3

O

8

over

2.65 m

starting at

142.4 m

true vertical depth

0.11% U

3

O

8

over

12.45 m

starting at

188.9 m

true vertical depth

AK22-075:

35.5 m

of composite mineralization includes

0.12% U

3

O

8

over

10.0 m

starting at

105.9 m

true vertical depth

0.15% U

3

O

8

over

5.5 m

starting at

129.5 m

true vertical depth

0.23% U

3

O

8

over

5.5 m

starting at

139.8 m

true vertical depth

0.12% U

3

O

8

over

12.0 m

starting at

152.6 m

true vertical depth

TORONTO

,

Nov. 10, 2022

/CNW/ - Baselode Energy Corp. (TSXV: FIND) (OTCQB: BSENF) ("

Baselode

" or the "

Company

") is pleased to announce the final

geochemical assay results from a 22,500 metre diamond drill program (the "

Program

") completed between February and August on the ACKIO high-grade*

uranium discovery ("

ACKIO

"), Hook project,

Athabasca

Basin area (the "

Athabasca

"), northern

Saskatchewan

(see

Table 1

and

Figure 1

).

"These final drill results continue to expand the scope of ACKIO. The results from drill hole AK22-066 indicate that we likely clipped the margin of another large

mineralized zone to the west, similar to the results from AK22-063 (

59.85 m

of composite mineralization starting at

40.3 m

true vertical depth, see

news release dated

September 12, 2022

). This will be a drill priority target for early 2023. ACKIO's broad intersections have grades equal to or better than other

uranium mining jurisdictions. ACKIO is near-surface, high-grade uranium mineralization with open pit mining potential in proximity to infrastructure and multiple

licensed uranium mills," said

James Sykes

, CEO, President and Director of Baselode.

Drill hole highlights from this news release include;

AK22-014

: 0.27% U

3

O

8

over

3.5 m

at

156.85 m

(

135.8 m

true vertical depth) includes 0.55% U

3

O

8

over

0.5 m

at

158.3 m

and 0.51% U

3

O

8

over

0.5 m

at

159.3

AK22-015

: 0.13% U

3

O

8

over

7.35 m

at

176.9 m

(

153.2 m

true vertical depth)

AK22-018

:

34.8 m

of composite mineralization including

0.43% U

3

O

8

over

2.65 m

at

164.45 m

(

142.4 m

true vertical depth) includes 0.76% U

3

O

8

over

0.6 m

at

165.0 m

0.10% U

3

O

8

over

9.05 m

at

200.55 m

(

173.7 m

true vertical depth) includes 0.70% U

3

O

8

over

0.4 m

at

201.0 m

0.11% U

3

O

8

over

12.45 m

at

218.1 m

(

188.9 m

true vertical depth)

AK22-019

: 0.13% U

3

O

8

over

12.45 m

at

229.25 m

(

162.1 m

true vertical depth) includes 1.05% U

3

O

8

over

0.5 m

at

239.7 m

AK22-039

:

30.1 m

of composite mineralization including

0.12% U

3

O

8

over

9.0 m

at

40.8 m

(

37.0 m

true vertical depth)

0.14% U

3

O

8

over

16.5 m

at

156.45 m

(

141.8 m

true vertical depth) includes 0.55% U

3

O

8

over

1.0 m

at

167.45 m

AK22-040

: 0.19% U

3

O

8

over

22.5 m

at

115.15 m

(

81.4 m

true vertical depth) includes 0.72% U

3

O

8

over

0.5 m

at

128.15 m

AK22-041

: 0.14% U

3

O

8

over

4.0 m

at

117.8 m

(

106.8 m

true vertical depth) includes 0.78% U

3

O

8

over

0.5 m

at

118.3 m

AK22-064

: 0.15% U

3

O

8

over

7.5 m

at

115.05 m

(

104.3 m

true vertical depth)

AK22-066

:

37.5 m

of composite mineralization including

0.14% U

3

O

8

over

24.0 m

at

107.5 m

(

107.1 m

true vertical depth) includes 0.55% U

3

O

8

over

0.5 m

at

127.5 m

and 0.64% U

3

O

8

over

0.5 m

at

129.0 m

AK22-075

:

35.5 m

of composite mineralization including

0.12% U

3

O

8

over

10.0 m

at

107.5 m

(

105.9 m

true vertical depth) includes 0.73% U

3

O

8

over

0.5 m

at

116.0 m

0.15% U

3

O

8

over

5.5 m

at

131.5 m

(

129.5 m

true vertical depth)

0.23% U

3

O

8

over

5.5 m

at

142.0 m

(

139.8 m

true vertical depth) includes 0.61% U

3

O

8

over

1.0 m

at

145.5 m

0.12% U

3

O

8

over

12.0 m

at

155.0 m

(

152.6 m

true vertical depth) includes 0.58% U

3

O

8

over

0.5 m

at

166.0 m

Baselode started the Program on

February 9, 2022

(

see Company News Release

) and completed the Program on

August 2, 2022

, with 78 drill holes (AK22-005

to AK22-080, and HK22-007), including one abandoned drill hole (AK22-048), for a total of

22,485.85 m

(

see Figure 1

). Fifty of seventy-six drill holes at ACKIO

intersected uranium mineralization. A complete list of drill hole collar information, hand-held scintillometer radioactivity composite measurements, and U

3

O

8

composite assay results for the nineteen drill holes reported in this news release are provided in

Table 1

.

Geochemical U

3

O

8

assay results from drill holes AK22-012 to AK22-019, AK22-039 to AK22-041, AK22-064, AK22-066 and AK22-075 to AK22-080 were

provided by Saskatchewan Research Council's Geoanalytical Laboratory ("

SRC

") in

Saskatoon, Saskatchewan

. The assay methodology includes SRCs "U

3

O

8

Wt% Assay" analysis package where an aliquot of sample pulp is digested in a concentration of HCL:HNO

3

. The digested volume is then made up with deionized

water for analysis by ICP-OES. All of the uranium assay results from the Program have been reported, concluding with this news release.

NOTES:

1.

All reported drill hole lengths do not represent true thicknesses which have yet to be determined.

2.

* "

High-grade uranium mineralization

" is defined by the Company as any result with >0.50% U

3

O

8

over a minimum of 0.25 m drill hole interval

The Company is preparing a presentation to provide more context to the full set of uranium assay results reported herein and from previous news releases.

For the latest videos from Baselode, Ore Group, and all things Mining, subscribe to our YouTube Chanel:

youtube.com/@theoregroup

FIGURE 1 – Plan map of the ACKIO mineralized surface expressions

TABLE 1 – Drill collar details, composite radioactivity and U

3

O

8

assay results, drill holes AK22-012 to AK22-019, AK22-039 to AK22-041, AK22-064, AK22-066, and AK22-075 to AK22-08

About ACKIO

Mineralization starts as shallow as

28 m

beneath the surface and down to approximately

300 m

depth with the bulk of mineralization occurring in the upper

190 m

.

ACKIO measures greater than

375 m

along strike, greater than

150 m

wide, comprised of at least 5 separate zones, and remains open to the west, south, and

along the

Athabasca

sandstone unconformity to the north, east and south.

ACKIO is 30 km southeast of well-established infrastructure, including an all-season road and powerline between Cameco Corp.'s (TSX: CCO) and Orano's

McArthur River

mine and Key Lake uranium mill joint ventures. ACKIO is 70 km northeast of the Key Lake mill. The Program was helicopter-supported to lessen

any ground-induced environmental impacts within the project area.

About Baselode Energy Corp.

Baselode controls 100% of approximately 227,000 hectares for exploration in the

Athabasca

Basin area, northern

Saskatchewan, Canada

. The land package is

free of any option agreements or underlying royalties.

Baselode's

Athabasca

2.0 exploration thesis focuses on discovering near-surface, basement-hosted, high-grade uranium orebodies outside the

Athabasca

Basin.

The exploration thesis is further complemented by the Company's preferred use of innovative and well-understood geophysical methods to map deep structural

controls to identify shallow targets for diamond drilling.

QP Statement

The technical information contained in this news release has been reviewed and approved by

Cameron MacKay

, P.Geo., Vice-President, Exploration &

Development for Baselode Energy Corp., who is considered to be a Qualified Person as defined in "National Instrument 43-101, Standards of Disclosure for

Mineral Projects."

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the TSX Venture Exchange policies) accepts responsibility for the

adequacy or accuracy of this release.

Certain information in this press release may contain forward-looking statements. This information is based on current expectations that are subject to significant

risks and uncertainties that are difficult to predict. Actual results might differ materially from results suggested in any forward-looking statements. Baselode

Energy Corp. assumes no obligation to update the forward-looking statements, or to update the reasons why actual results could differ from those reflected in the

forward looking-statements unless and until required by securities laws applicable to Baselode Energy Corp. Additional information identifying risks and

uncertainties is contained in the Company's filings with Canadian securities regulators, which filings are available under Baselode Energy Corp. profile at

www.sedar.com

.

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the securities in

the United States

. The securities have not been and

will not be registered under the United States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities laws and may not be offered

or sold within

the United States

or to, or for the account or benefit of, U.S. Persons unless registered under the U.S. Securities Act and applicable state securities

laws, unless an exemption from such registration is available.

SOURCE

Baselode Energy Corp.

View original content:

http://www.newswire.ca/en/releases/archive/November2022/10/c9087.html

%SEDAR: 00044947E

For further information:

Baselode Energy Corp., FIND on the TSXV, [email protected], www.baselode.com; James Sykes, CEO, President and Director,

[email protected], 306-221-8717

CO: Baselode Energy Corp.

CNW 06:00e 10-NOV-22