Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BEEP.V ·

Baselode Confirms New Uranium Mineralization at Depth at ACKIO, Mineralization Remains Open AK23-88: 0.32% over 16.5 m at 184 m drill hole depth, including 0.53% over 3.0 m and 0.75% over 1.5 m (best uranium intersection beneath 150 m depth)

Exploration Programs

Baselode Confirms New Uranium

Mineralization at Depth at ACKIO,

Mineralization Remains Open

AK23-88: 0.32% over 16.5 m at 184 m drill hole depth, including 0.53% over 3.0 m and

0.75% over 1.5 m (best uranium intersection beneath 150 m depth)

Mineralization remains open at depth

Assays from 25 remaining drill holes on this program are pending

Toronto, Ontario--(Newsfile Corp. - September 20, 2023) - Baselode Energy Corp. (TSXV: FIND)

(OTCQB: BSENF) ("

Baselode

" or the "

Company

") is pleased to announce uranium ("

U

3

O

8

") assay

results from 11 drill holes (AK23-81 to AK23-91) of the 7,500 m diamond drilling program (the

"

Program

") targeting the deepest parts of the ACKIO high-grade uranium system ("

ACKIO

") on the

Hook project ("

Hook

" or the "

Project

"). The assays reported herein are all from the deepest drilling at

ACKIO. Baselode anticipates, based on previously released radioactivity results, to release even more

encouraging results from shallower intersections with pending assay results from 25 drill holes

remaining.

"The results from the deep targets in drill holes AK23-88 and AK23-82 clearly demonstrate

mineralization remains strong and open at depth as we attempt to connect the near-surface

mineralization with these new zones at depth. The assay results from hole AK23-88 rank it is a top-ten

drill hole at ACKIO. In particular, AK23-88 intersected 4 individual high-grade uranium lenses, including

0.53% over 3.0 m and 0.75% over 1.5 m, while holes AK23-84 through AK23-88 demonstrate continuity

of higher grades of mineralization at depth. ACKIO is a robust uranium system with shallow

mineralization extending deep and remains open for additional discovery potential," said James Sykes,

CEO, President and Director of Baselode.

ACKIO Drill Program Details

36 drill holes over 7,512 metres ("

m

") were completed. Within this, ACKIO consisted of 30 drill holes for

6,193 m, Mirror consisted of 5 drill holes for 1,145 m (AK23-105 to AK23-109), and 1 drill hole (HK23-

008) for 174 m was completed on a regional exploration target (

Figure 1

,

Table 1

).

Drill holes AK23-90 and AK23-91 confirmed mineralization starting at 72 m and 82 m below surface,

respectively, demonstrating shallow mineralization is prevalent in other Pods at ACKIO.

The remainder of the drill hole assay results were all intersected between 130 and 225 m beneath the

surface, demonstrating uranium mineralization is prevalent at depth at ACKIO and is not restricted to

shallow mineralization. Mineralization remains open at depth and provides a target for future drill

programs.

Four of the reported drill holes (AK23-84 to AK23-88, excluding AK23-87) all intersected high-grade

uranium mineralization (i.e., >0.50% U

3

O

8

) over a minimum width of 0.5 m core length. These results

continue to demonstrate high-grade uranium occurs at depth ACKIO.

Three drill holes (AK23-82, AK23-86, AK23-88) all intersected continuous mineralization over 10 m core

length, demonstrating thick mineralized zones at depth.

Geochemical U

3

O

8

assay results from drill holes AK23-81 to AK23-91 were provided by Saskatchewan

Research Council's Geoanalytical Laboratory ("

SRC

") in Saskatoon, Saskatchewan. The assay

methodology includes SRCs "U

3

O

8

Wt% Assay" analysis package where an aliquot of sample pulp is

digested in a concentration of HCL:HNO

3

. The digested volume is then made up with deionized water

for analysis by ICP-OES. Uranium assay results from the remaining twenty-five drill holes will be released

after being compiled and thoroughly quality checked by the technical team.

ACKIO is 30 km southeast of well-established infrastructure, including an all-season road and powerline

between Cameco Corp.'s and Orano's McArthur River mine and Key Lake uranium mill joint ventures.

ACKIO is 70 km northeast of the Key Lake mill. The Program was helicopter-supported to lessen any

ground-induced environmental impacts within the project area.

NOTES:

1

.

All reported drill hole lengths do not represent true thicknesses which have yet to be determined.

2

.

* "

High-grade uranium mineralization

" is defined by the Company as any result with >0.50% U

3

O

8

over a minimum of 0.25 m drill hole

interval.

About Baselode Energy Corp.

Baselode controls 100% of approximately 264,172 hectares for exploration in the Athabasca Basin

area, northern Saskatchewan, Canada. The land package is free of any option agreements or underlying

royalties.

The Company discovered the ACKIO near-surface, high-grade uranium deposit in September 2021.

ACKIO measures greater than 375 m along strike, greater than 150 m wide, comprised of at least 11

separate zones, with mineralization starting as shallow as 28 m beneath the surface and down to

approximately 300 m depth beneath the surface with the bulk of mineralization occurring in the upper 120

m. ACKIO remains open to the west, north, south, and along the Athabasca sandstone unconformity to

the east and south.

Baselode's Athabasca 2.0 exploration thesis focuses on discovering near-surface, basement-hosted,

high-grade uranium orebodies outside the Athabasca Basin. The exploration thesis is further

complemented by the Company's preferred use of innovative and well-understood geophysical methods

to map deep structural controls to identify shallow targets for diamond drilling.

QP Statement

The technical information contained in this news release has been reviewed and approved by Cameron

MacKay, P.Geo., Vice-President, Exploration & Development for Baselode Energy Corp., who is

considered to be a

Qualified Person as defined in "National Instrument 43-101, Standards of Disclosure

for Mineral Projects."

For further information, please contact:

Baselode Energy Corp.

FIND on the TSXV

[email protected]

www.baselode.com

James Sykes, CEO, President and Director

[email protected]

306-221-8717

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the TSX

Venture Exchange policies) accepts responsibility for the adequacy or accuracy of this release.

Certain information in this press release may contain forward-looking statements. This information is

based on current expectations that are subject to significant risks and uncertainties that are difficult to

predict. Actual results might differ materially from results suggested in any forward-looking statements.

Baselode Energy Corp. assumes no obligation to update the forward-looking statements, or to update

the reasons why actual results could differ from those reflected in the forward looking-statements unless

and until required by securities laws applicable to Baselode Energy Corp. Additional information

identifying risks and uncertainties is contained in the Company's filings with Canadian securities

regulators, which filings are available under Baselode Energy Corp. profile at

www.sedarplus.ca

.

This news release does not constitute an offer to sell or a solicitation of an offer to buy any of the

securities in the United States. The securities have not been and will not be registered under the United

States Securities Act of 1933, as amended (the "U.S. Securities Act") or any state securities laws and

may not be offered or sold within the United States or to, or for the account or benefit of, U.S. Persons

unless registered under the U.S. Securities Act and applicable state securities laws, unless an

exemption from such registration is available.

FIGURE 1 - Surface projections of modeled ACKIO uranium mineralization, drill hole collar

locations and traces for AK23-81 to AK23-91

To view an enhanced version of this graphic, please visit:

https://images.newsfilecorp.com/files/6412/181330_31f4455a24de3b9b_005full.jpg

TABLE 1 – Drill collar details, continuous composite elevated radioactivity results, and uranium assay

results (U3O8) from drill holes

AK23-81 to AK23-91

DDH

Target

Area

Location

East

North

Elevation

Az.

Dip

EOH

Radioactivity (>300 cps)

Assay Results (>0.05 wt%

U

3

O

8

)

AK23-81

ACKIO

Pod 4 -

Edge

526170

6372857

466

247

-65

195

400 cps over 0.2 m at 178.1 m

No significant Results

417 cps over 0.5 m at 179.35 m

0.06% over 0.5 m at 179.5 m

AK23-82

ACKIO

Pod 5 -

Edge

526170

6372857

466

248

-80

240

300 cps over 0.2 m at 84.1 m

No significant Results

368 cps over 9.3 m at 151.3 m

0.09% over 8.0 m at 151.0 m

1

Pod 4 -

Edge

356 cps over 7.8 m at 195.75 m

0.09% over 11.1 m at 195.5 m

319 cps over 0.25 m at 206.1 m

316 cps over 6.5 m at 215.1 m

0.16% over 5.45 m at 215.0 m

2

300 cps over 0.15 m at 229.15

m

0.07% over 0.15 m at 229.15 m

AK23-83

ACKIO

Pod 4 -

Edge

526170

6372857

466

248

-57

201

748 cps over 4.35 m at 158.65

m

0.19% over 4.5 m at 158.5 m

AK23-84

ACKIO

Pod 5 -

Edge

265

-72

240

588 cps over 18.15 m at 147.4

m

0.29% over 4.1 m at 147.4 m

3

includes

0.70% over 0.5 m at 149.0 m

0.19% over 6.5 m at 154.0 m

and

includes

0.65% over 0.5 m at 155.0 m

0.08% over 2.0 m at 162.5 m

313 cps over 2.9 m at 167.85 m

0.17% over 0.5 m at 170.0 m

Pod 4 -

Centre

329 cps over 0.55 m at 185.7 m

No significant Results

518 cps over 2.05 m at 188.6 m

0.09% over 1.0 m at 188.5 m

AK23-85

ACKIO

526170

6372857

466

265

-54

210

450 cps over 0.05 m at 161.1 m

No significant Results

Pod 4 -

Edge

797 cps over 2.5 m at 163.2 m

0.14% over 2.7 m at 163.0 m

657 cps over 5.6 m at 168.25 m

0.15% over 3.5 m at 168.5 m

includes

0.54% over 0.55 m at 168.5 m

AK23-86

ACKIO

Pod 5 -

Edge

526227

6372821

467

242

-60

210

320 cps over 0.2 m at 175.85 m

0.14% over 11.0 m at 176.0 m

320 cps over 0.2 m at 176.25 m

Pod 4 -

Centre

508 cps over 7.1 m at 179.6 m

includes

0.93% over 0.9 m at 182.6 m

4

326 cps over 1.0 m at 189.8 m

0.11% over 1.0 m at 189.5 m

AK23-87

ACKIO

Pod 4 -

Edge

526227

6372821

467

247

-54

201

No Significant Results

No significant Results

AK23-88

ACKIO

Pod 8 -

Edge

255

-65

225

300 cps over 0.35 m at 115.1 m

No significant Results

300 cps over 0.15 m at 117.0 m

No significant Results

Pod 5 -

Edge

600 cps over 4.6 m at 172.4 m

0.38% over 4.5 m at 172.5 m

5

includes

0.53% over 3.0 m at 174.0 m

6

361 cps over 0.85 m at 180.5 m

0.06% over 1.0 m at 180.5 m

Pod 4 -

Centre

759 cps over 21.8 m at 184.1

m

0.32% over 16.5 m at 184.0 m

includes

6,000 cps over 0.1 m at

186.75 m

0.69% over 1.55 m at 185.45

m

and

includes

0.73% over 0.5 m at 190.0 m

and

includes

0.75% over 1.5 m at 193.5 m

AK23-89

ACKIO

Pod 5 -

Edge

526227

6372821

467

262

-57

213

300 cps over 0.1 m at 172.05 m

No significant Results

No Significant Results

0.11% over 0.1 m at 181.35

Pod 4 -

Centre

353 cps over 0.45 m at 189.6 m

0.08% over 0.5 m at 189.5 m

AK23-90

ACKIO

Pod 3 -

Edge

526227

6372821

467

235

-70

234

305 cps over 2.7 m at 76.85 m

0.06% over 2.5 m at 77.0 m

Pod 4 -

Edge

351 cps over 4.5 m at 195.35 m

0.08% over 3.5 m at 195.0 m

656 cps over 1.15 m at 202.15

m

0.14% over 1.5 m at 202.0 m

AK23-91

ACKIO

Pod 3 -

Edge

526227

6372821

467

235

-75

205

317 cps over 2.65 m at 82.65 m

0.08% over 0.5 m at 85.0 m

11 DDH

2,374

10 DDH

10 DDH

NOTES: East and North units are metres using NAD83 datum, UTM Zone 13N

Elevation is recorded as "metres above sea level"

Az. = Azimuth, EOH = End of hole (measured in metres)

Composite radioactivity results use 300 cps cut-off and do not contain greater than 2.0 m consecutive dilution

Composite U

3

O

8

results use 0.05% U

3

O

8

cut-off and do not contain greater than 2.0 m consecutive dilution (i.e., dilution is <0.05% U

3

O

8

)

"

includes/and includes

" are composite U

3

O

8

results using 0.50% U

3

O

8

cut-off and do not contain greater than 2.0 m consecutive dilution (i.e., dilution is

<0.50% U

3

O

8

)

1

includes 1.25 m core loss over interval length

2

includes 0.9 m core loss over interval length

3

includes 0.6 m core loss over interval length

4

includes 0.3 m core loss over interval length

5

includes 0.9 m core loss over interval length

6

includes 0.9 m core loss over interval length

To view the source version of this press release, please visit

https://www.newsfilecorp.com/release/181330