Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BCU.V ·

Kabba Drilling & Project Development Update

Corporate Updates

September 26, 2017 News Release NEX Symbol: BCU.H

KABBA DRILLING & PROJECT DEVELOPMENT UPDATE

Vancouver, British Columbia – Bell Copper Corporation (“Bell” or the “Company”)

(NEX: BCU.H) is pleased to provide a further update on the Bell Copper Corporation’s Kabba

porphyry copper project in Arizona.

Drilling

• Initial 2017 drilling completes 5 holes, totaling 2679 meters.

• All 5 holes intercepted oxidized and leached capping in Laramide-age porphyritic

intrusive rocks

• Several of the holes showed low concentrations of the copper-bearing minerals

chalcocite and chalcopyrite.

The initial 2017 drilling program at Kabba has been completed. The initial budget allocated

to the project allowed for the completion of five drill holes testing significant IP electrical

geophysical anomalies identified during the recent geophysics program this past winter. A

total of 2679 meters of drilling was completed. The holes were spread across an area

measuring 3 kilometers by 1.6 kilometers.

All five holes penetrated cover rocks ranging between 259 and 518 meters thick followed by

oxidized and leached capping in Laramide-age porphyritic intrusive rocks. The holes all

terminated in pyrite-bearing Laramide or Precambrian rocks. Several of the holes showed

low concentrations of the copper-bearing minerals chalcocite and chalcopyrite.

Core has been shipped to Salt Lake City where it will be cut and then sent to an

independent lab for assaying.

Assay results and further detailed geological information are expected to be available in

approximately 60 days.

Project Development

• Property package expanded to 13,000 acres (5244 hectares), increase of +55%

• 3 additional drill holes permitted based on 2017 drilling

The Company’s mineral tenure at the Kabba project now stands at approximately 13,000

acres (5244 hectares), a 55% increase from last year. No federal lands are included in the

Kabba project area.

Permits have been obtained from the Arizona State Land Department to drill 3 additional

holes. While there is no guarantee that all or any of these holes will be drilled, these

permits remain valid until the end of June 2018.

Community Relations

Kennecott Exploration Company, a part of the Rio Tinto Group continues to communicate

with the local community. Once assays are in hand and all drill data is evaluated, they will

again engage the local community in writing or in a public meeting to inform them of

potential future mineral exploration efforts on the project.

Tim Marsh, the Company’s President and CEO, assisted in logging the latest Kabba core and

is enthused by what he saw. “This round of drilling took place beyond the limits of previous

drill testing by Bell. The geophysical anomalies that were tested were proven by drilling to

be pyritic porphyry with porphyry-copper-type alteration at the modeled depths.

Qualified Person

The technical content of this release has been reviewed and approved by Timothy Marsh,

PhD, PEng., the Company’s CEO and President. No mineral resource has yet been

identified on the Kabba Project. There is no certainty that the present exploration effort will

result in the identification of a mineral resource or that any mineral resource that might be

discovered will prove to be economically recoverable.

On behalf of the Board of Directors of

Bell Copper Corporation

"Timothy Marsh"

Timothy Marsh, President, CEO & Director

For further information please contact the Company

Tel: 604.970.0316

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is

defined in the policies of the TSX Venture Exchange) accepts responsibility for the adequacy

or accuracy of this release.