Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

BCU.V ·

Bell Copper Drills Copper Sulfide in Porphyry at Big Sandy

Drill Results

Suite 900 - 885 West Georgia Street | Vancouver, British Columbia | V6C 3H1 | Canada

1-800-418-8250 | www:bellcopper.net | [email protected]

February 2, 2022

News Release

Bell Copper Corporation

Bell Copper Drills Copper Sulfide in Porphyry at Big Sandy

VANCOUVER, B.C. - Bell Copper Corporation (TSXV:BCU) (OTCQB:BCUFF)(“Bell Copper” or the

“Company”) reports that it has drilled a supergene chalcocite (copper sulfide) deposit hosted by quartz

porphyry at its Big Sandy project. Big Sandy is a large, truncated porphyry copper -molybdenum target

located in northwestern Arizona, approximately 30 kilometers south of the Company’s Perseverance

Project.

Highlights

• BS-3 is now cutting chalcocite-pyrite mineralization in pervasively sericitized quartz porphyry cut

by pyrite and quartz +/- molybdenite veinlets at an inclined depth of 1589 meters.

• Disseminated chalcocite mineralization began at an inclined depth of 1303 meters beneath 111

meters of hematitic leached capping.

• The 179-meter chalcocite-bearing interval from 1293-1472m has been sampled and shipped to

the laboratory for copper assaying.

• Geological logging, sawing, and sampling of the chalcocite -bearing interval from 1472 -1589

meters is underway.

• Drilling of BS -3 continues, and is encountering sparse but increasing quantities of disseminated

chalcopyrite, which is variably coated by chalcocite.

Drilling and Analysis

Drillhole BS -3, which was oriented to test a 2400 meter by 2100 meter area of high electrical

conductivity that was detected in an earlier Magneto-telluric survey ( refer to news release dated

October 6, 2020), passed out of gravel and into hematite-rich, pervasively sericitized quartz porphyry

(i.e. “leached capping”) at an inclined depth of 1192 meters . The true thickness of the gravel layers

penetrated by BS-3 at an oblique angle is estimated to be 860 meters. Disseminated chalcocite (copper

sulfide) and pyrite was first encountered at an inclined depth of 1303 meters, immediately beneath

leached capping . Chalcocite variably overprints predominantly pyritic mineralization from inclined

depths of 1303m to at least 1589m, the current bottom of BS-3 (Figures A through C) . Chalcocite

mineralization in this 286 -meter interval is interrupted by spotty jarosite-bearing shear zones lacking

pyrite and chalcocite. No copper oxide minerals have been encountered in the ongoing intersection.

P a g e | 2

www.bellcopper.net | Vancouver, BC, Canada | 1 800 418 8250

Figure A, B, and C. Core box photos representative of the 179 meters of supergene chalcocite mineralization in BS-3.

Chalcocite (Cu 2S, 80 percent by weight copper) is present as 1) steely black coatings surrounding

disseminated pyrite, 2) partial to complete replacement of disseminated pyrite grains, and 3) partial to

complete replacements of pyrite veins (Figures D through F). Minor amounts of bornite (Cu 5FeS4, 65

percent by weight copper) have been seen rimmed by chalcocite in the center of particular pyrite veins.

To date, only trace quantities of chalcopyrite (CuFeS 2, 33 percent by weight copper) have been

encountered, mainly in the deepest few meters of co re. Sparse quartz-molybdenite veinlets appear to

increase in abundance with depth in BS-3.

Figures D, E, and F. Photomicrographs of chalcocite in BS-3 core samples, field of view 5 millimeters in each.

D. Chalcocite forming steely black rims surrounding disseminated pyrite grains in strongly sericitized quartz porphyry.

E. Steely black chalcocite invading cracks and grain boundaries in pyrite vein.

F. Steely black chalcocite almost completely engulfing pyrite in veinlet.

P a g e | 3

www.bellcopper.net | Vancouver, BC, Canada | 1 800 418 8250

Oriented core collected near the base of the gravel cover shows that at BS -3 the porphyry system is

tilted about 45 degrees from its orientation before faulting. This tilt suggests that the supergene copper

blanket in BS-3 can be targeted at shallower depth in the direction of drillhole BS-1, located 1200 meters

to the east. A 2 -meter interval of chalcocite supergene enrichment underlying h ematitic leached

capping was cut at a depth of 936 meters in BS -1 (Figure G), suggesting continuity of supergene copper

enrichment and porphyry-related alteration across a distance of 1200 meters. The intervening ground

showed anomalously high electrical conductivity in the August 2020 magneto -telluric survey. A future

drillhole is now contemplated to test that shallower target. Drillhole BS -2, located 2.3 kilometers

southeast of BS -3, showed only trace amounts of chalcocite, spotty chalcopyrite (Figure H) and pyrite

veins, and “fringy” propylitic alteration in Precambrian host rocks.

Tim Marsh, Bell’s President and CEO, and a Qualified Person as defined by NI43-101, said,

“Bell Copper continues to build on the discovery at Big Sa ndy, first announced in January 2020 with BS -1

cutting chalcocite, chalcopyrite, and molybdenite mineralization hosted by a strongly altered 74. 2 Ma

porphyry. Our original model of a decapitated, large copper-rich top to the Laramide Diamond Joe

porphyry root, which concept also underpins the exploration target at our nearby Perseverance property,

is being borne out in the ongoing Big Sandy drilling program. The Company intends to follow the copper

outward and downward in BS -3 to a lo gical conclusion, and immediately follow up with a 500 -meter

step-out hole from the same drill pad. Meanwhile, we will construct a new drill site under our existing

permits directly above the BS-3 intersection and mobilized a second drill to push down additional stepout

holes from that pad.”

Figure G. Photomicrograph of chalcocite from BS-1 at of depth

of 936 meters, located 1200 meters east of BS-3. Field of view 7

millimeters. Compare with identical rimming chalcocite texture

in Figure D.

Figure H. Core sample from BS-2 showing spotty chalcopyrite

mineralization in sericitized Precambrian granite. BS-2 is

located 2.3 kilometers southeast of BS-3.

P a g e | 4

www.bellcopper.net | Vancouver, BC, Canada | 1 800 418 8250

About Bell Copper

Bell Copper is a mineral exploration company focused on the identification, exploration and discovery of

large copper deposits located in Arizona. Bell Copper is exploring its 100% owned Big Sandy P orphyry

Copper Project and the Perseverance Porphyry Copper Project which is under a Joint Venture - Earn In.

Qualified Person

The technical content of this release has been reviewed and approved by Timothy Marsh, PhD, PEng.,

the Company’s CEO and Presiden t. No mineral resource has yet been identified on the Big Sandy

Project. There is no certainty that the present exploration effort will result in the identification of a

mineral resource or that any mineral resource that might be discovered will prove to be economically

recoverable.

On behalf of the Board of Directors of

Bell Copper Corporation

"Timothy Marsh"

Timothy Marsh, President, CEO & Director

For further information please contact the Company

Tel: 1 800 418 8250

Email: [email protected]

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the

policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this release.

Forward Looking Statements

This news release includes “forward -looking statements” and “forward -looking information” within the meaning of Canadian

securities legislation. All statements included in this news release, other than statements of historical fact, are forward -looking

statements. Forward-looking statements include predictions, projections and forecasts and are often, but not always, identified

by the use of words such as "anticipate", "believe", "plan", "estimate", "expect", "pote ntial", "target", "budget" and "intend"

and statements that an event or result "may", "will", "should", "could" or "might" occur or be achieved and other similar

expressions and includes the negatives thereof.

Forward-looking statements are based on a number of assumptions and estimates that, while considered reasonable by

management based on the business and markets in which Bell Copper operates, are inherently subject to significant

operational, economic, and competitive uncertainties, risks and contingencies. There can be no assurance that such statements

will prove to be accurate and actual results, and future events could differ materially from those anticipated in such statements.

Important factors that could cause actual results to differ material ly from the Company's expectations include actual

exploration results, interpretation of metallurgical characteristics of the mineralization, changes in project parameters as plans

continue to be refined, future metal prices, availability of capital and fi nancing on acceptable terms, general economic, market

or business conditions, uninsured risks, regulatory changes, delays or inability to receive required approvals, and other

exploration or other risks detailed herein and from time to time in the filings made by the Company with securities regulators,

including those described in the Company’s most recently filed MD&A. The Company does not undertake to update or revise

any forward-looking statements, except in accordance with applicable law.